X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0464282601000

Well Details

Well ID: 0464282601000
Loading map...
Location: 00/01-26-046-28W4/0
Location Alias: 00/01-26-46-28 W4M
Location Alias 2: 00/01-26-046-28 W4/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 4
Range: 28
Section: 26
County/Municipality: Pigeon Lake 138A
Well Name: ESSO PIGEON LAKE NO 1-26
Operator Name: Imperial Oil Resources Limited
License Number: 0008307
License Date: 1954-07-30
License Status: Abandoned
Spud Date: 1954-08-10
Final Drill Date: 1954-09-15
Well Total Depth: 2179.30 m
Surface Hole Latitude: 52.991398
Surface Hole Longitude: -113.948080

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-07-30 Obtained License
1954-09-10 Production Casing Operation Performed
1954-09-15 Finished Drilling
1954-09-15 Perforation Treatment Performed - Open-Hole Completion
1954-09-15 Well Mode changed to Drilled and Cased
1954-09-17 Well Began Production
1954-09-17 Well Fluid changed to Crude Oil
1954-09-17 Well Mode changed to Flowing
1983-02-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-04-01 Well Fluid changed to Crude Oil
1983-04-01 Well Mode changed to Pumping
1985-07-25 Well Log Performed
1989-08-23 Perforation Treatment Performed - Jet Perforation
1989-08-23 Well Log Performed
1989-11-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-06-06 Perforation Treatment Performed - Cement Plug
1990-06-06 Perforation Treatment Performed - Open-Hole Completion
1990-06-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-08-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-09-11 Well Fluid changed to Crude Oil
1992-09-11 Well Mode changed to Suspended
1992-11-02 Well Log Performed
1992-11-09 Well Fluid changed to Crude Oil
1992-11-09 Well Mode changed to Pumping
1997-01-22 Well Log Performed
1997-09-07 Perforation Treatment Performed - Jet Perforation
1997-09-07 Well Log Performed
1997-09-16 Well Log Performed
1997-10-22 Well Log Performed
1997-11-04 Perforation Treatment Performed - Jet Perforation
1997-11-04 Well Log Performed
1997-11-13 Well Log Performed
1998-03-05 Well Log Performed
1998-05-14 Perforation Treatment Performed - Jet Perforation
1998-05-14 Well Log Performed
1999-01-08 Perforation Treatment Performed - Jet Perforation
1999-01-08 Well Log Performed
1999-03-06 Perforation Treatment Performed - Jet Perforation
1999-06-30 Perforation Treatment Performed - Jet Perforation
1999-06-30 Well Log Performed
2000-01-13 Perforation Treatment Performed - Jet Perforation
2000-01-13 Well Log Performed
2000-06-25 Well Log Performed
2000-10-01 Well Fluid changed to Crude Oil
2000-10-01 Well Mode changed to Suspended
2002-09-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-09-06 Plug Back Performed
2002-09-06 Well Fluid changed to Crude Oil
2002-09-06 Well Mode changed to Abandoned Zone
2002-09-07 Perforation Treatment Performed - Cement Plug
2002-09-07 Plug Back Performed
2002-09-07 Well Log Performed
2002-09-08 Perforation Treatment Performed - Jet Perforation
2002-09-08 Perforation Treatment Performed - Remedial Casing
2002-09-09 Perforation Treatment Performed - Cement Plug
2002-09-09 Plug Back Performed
2003-08-26 Well Abandoned
2003-08-26 Well Fluid changed to Crude Oil
2003-08-26 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-09-15 Open Hole/Barefoot Completion 2010.50 2179.30 0
1997-11-04 Perforation 2117.00 2121.00 13
1998-05-14 Perforation 2111.00 2115.00 13
1999-01-08 Perforation 2106.50 2107.50 10
1999-03-06 Perforation 2100.00 2103.00 13
1999-06-30 Perforation 2093.00 2095.00 13
2000-01-13 Perforation 2084.50 2085.50 14
2002-09-06 Packing Device Capped w/Cement 1922.30 1972.30 0
2002-09-07 Cement Plug 1127.10 1309.00 0
2002-09-08 Perforation 1175.00 1175.50 26
2002-09-08 Remedial Casing Cementing 1175.00 1175.50 0
1983-02-01 Acid Treatment 2010.50 2179.30 0
2002-09-09 Cement Plug 502.10 1127.10 0
1989-08-23 Perforation 2149.50 2150.50 13
1989-11-02 Acid Treatment 2149.50 2150.50 0
1990-06-06 Cement Plug 2147.50 2179.30 0
1990-06-06 Open Hole/Barefoot Completion 2010.50 2147.50 0
1990-06-25 Acid Treatment 2010.50 2147.50 0
1991-08-24 Acid Treatment 2010.50 2147.50 0
1997-09-07 Perforation 2121.00 2125.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1983 7424 0.0 0.0 0.0
1984 7288 0.0 0.0 0.0
1985 6340 0.0 0.0 0.0
1986 7266 0.0 0.0 0.0
1987 7173 0.0 0.0 0.0
1988 8607 0.0 0.0 0.0
1989 8126 0.0 0.0 0.0
1990 7221 0.0 0.0 0.0
1991 6295 0.0 0.0 0.0
1992 6913 0.0 0.0 0.0
1993 7814 0.0 0.0 0.0
1994 4927 0.0 0.0 0.0
1995 8349 0.0 0.0 0.0
1996 8482 0.0 0.0 0.0
1997 4327 0.0 0.0 0.0
1998 5442 0.0 0.0 0.0
1999 7580 0.0 0.0 0.0
2000 5663 0.0 0.0 0.0

For data sources see[5]

References