X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0464282506000

Well Details

Well ID: 0464282506000
Loading map...
Location: 00/06-25-046-28W4/0
Location Alias: 00/06-25-46-28 W4M
Location Alias 2: 00/06-25-046-28 W4/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 4
Range: 28
Section: 25
County/Municipality: Pigeon Lake 138A
Well Name: ESSO PIGEON LAKE 6-25
Operator Name: Imperial Oil Resources Limited
License Number: 0007323
License Date: 1953-11-16
License Status: Abandoned
Spud Date: 1954-02-11
Final Drill Date: 1954-03-25
Well Total Depth: 2168.00 m
Surface Hole Latitude: 52.994329
Surface Hole Longitude: -113.938086

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-11-16 Obtained License
1954-03-01 Drill Stem Test Performed
1954-03-20 Liner Casing Operation Performed
1954-03-25 Finished Drilling
1954-03-25 Well Mode changed to Drilled and Cased
1954-03-27 Perforation Treatment Performed - Bullet Perforation
1954-03-27 Perforation Treatment Performed - Jet Perforation
1954-03-30 Well Began Production
1954-03-30 Well Fluid changed to Crude Oil
1954-03-30 Well Mode changed to Flowing
1984-02-28 Well Log Performed
1984-07-16 Perforation Treatment Performed - Cement Squeeze
1984-07-19 Perforation Treatment Performed - Jet Perforation
1984-07-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-07-24 Well Fluid changed to Crude Oil
1984-07-24 Well Mode changed to Pumping
1987-10-13 Perforation Treatment Performed - Jet Perforation
1987-10-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-10-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-10-19 Perforation Treatment Performed - Jet Perforation
1987-10-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-07-29 Perforation Treatment Performed - Jet Perforation
1988-07-29 Well Log Performed
1988-07-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-10-07 Perforation Treatment Performed - Jet Perforation
1989-10-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-04-30 Well Fluid changed to Crude Oil
1994-04-30 Well Mode changed to Suspended
1996-10-01 Well Fluid changed to Crude Oil
1996-10-01 Well Mode changed to Pumping
1996-10-27 Well Log Performed
1996-10-28 Perforation Treatment Performed - Jet Perforation
1997-06-18 Perforation Treatment Performed - Jet Perforation
1997-06-18 Well Log Performed
1997-06-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-03-30 Perforation Treatment Performed - Jet Perforation
1998-03-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-03-01 Well Fluid changed to Crude Oil
1999-03-01 Well Mode changed to Suspended
2002-10-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-10-09 Perforation Treatment Performed - Cement Plug
2002-10-09 Perforation Treatment Performed - Jet Perforation
2002-10-09 Plug Back Performed
2002-10-09 Well Fluid changed to Crude Oil
2002-10-09 Well Mode changed to Abandoned Zone
2002-10-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-10-10 Perforation Treatment Performed - Remedial Casing
2002-10-10 Plug Back Performed
2003-08-12 Well Abandoned
2003-08-12 Well Fluid changed to Crude Oil
2003-08-12 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-03-27 Bullet Perforation 2150.70 2154.90 13
1987-10-20 Acid Treatment 2156.90 2157.40 0
1988-07-29 Perforation 2159.20 2160.20 13
1988-07-31 Acid Treatment 2150.70 2157.40 0
1989-10-07 Perforation 2156.90 2157.90 13
1989-10-10 Acid Treatment 2156.90 2157.90 0
1996-10-28 Perforation 2142.30 2142.90 17
1997-06-18 Perforation 2133.50 2135.00 16
1997-06-20 Acid Treatment 2133.50 2135.00 0
1998-03-30 Perforation 2125.00 2126.00 16
1998-03-31 Acid Treatment 2125.00 2126.00 0
1954-03-27 Perforation 2150.70 2154.90 13
2002-10-09 Packing Device Capped w/Cement 2004.70 2118.30 0
2002-10-09 Cement Plug 1544.40 1707.80 0
2002-10-09 Perforation 263.00 263.50 26
2002-10-10 Remedial Casing Cementing 263.00 263.50 0
2002-10-10 Packing Device Capped w/Cement 249.80 260.00 0
1984-07-16 Cement Squeeze 2150.70 2154.90 0
1984-07-19 Perforation 2162.60 2163.10 13
1984-07-20 Acid Treatment 2162.60 2163.10 0
1987-10-13 Perforation 2150.70 2154.90 13
1987-10-15 Acid Treatment 2162.60 2163.10 0
1987-10-19 Perforation 2156.90 2157.40 13
1987-10-19 Acid Treatment 2162.60 2163.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1983 7073 0.0 0.0 0.0
1984 5433 0.0 0.0 0.0
1985 6153 0.0 0.0 0.0
1986 6970 0.0 0.0 0.0
1987 7697 0.0 0.0 0.0
1988 8306 0.0 0.0 0.0
1989 7985 0.0 0.0 0.0
1990 7313 0.0 0.0 0.0
1991 8137 0.0 0.0 0.0
1992 7883 0.0 0.0 0.0
1993 2816 0.0 0.0 0.0
1996 1302 0.0 0.0 0.0
1997 8453 0.0 0.0 0.0
1998 7139 0.0 0.0 0.0
1999 102 0.0 0.0 0.0

For data sources see[5]

References