X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0464282414000

Well Details

Well ID: 0464282414000
Loading map...
Location: 00/14-24-046-28W4/0
Location Alias: 00/14-24-46-28 W4M
Location Alias 2: 00/14-24-046-28 W4/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 4
Range: 28
Section: 24
County/Municipality: Pigeon Lake 138A
Well Name: IMP IR 3 BONNIE GLEN
Operator Name: Imperial Oil Resources Limited
License Number: 0006404
License Date: 1953-05-07
License Status: Abandoned
Spud Date: 1953-05-17
Final Drill Date: 1953-06-25
Well Total Depth: 2187.50 m
Surface Hole Latitude: 52.987334
Surface Hole Longitude: -113.936515

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-05-07 Obtained License
1953-06-22 Liner Casing Operation Performed
1953-06-25 Finished Drilling
1953-06-25 Perforation Treatment Performed - Open-Hole Completion
1953-06-25 Well Mode changed to Drilled and Cased
1953-06-27 Well Began Production
1953-06-27 Well Fluid changed to Crude Oil
1953-06-27 Well Mode changed to Flowing
1977-10-03 Perforation Treatment Performed - Cement Squeeze
1977-10-05 Perforation Treatment Performed - Jet Perforation
1977-10-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-03-21 Well Log Performed
1985-01-29 Well Log Performed
1985-01-30 Perforation Treatment Performed - Jet Perforation
1985-01-30 Well Log Performed
1985-01-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-02-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-07-01 Well Fluid changed to Crude Oil
1992-07-01 Well Mode changed to Suspended
1993-12-16 Well Log Performed
1993-12-18 Perforation Treatment Performed - Cement Squeeze
1993-12-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-12-22 Perforation Treatment Performed - Jet Perforation
1994-01-21 Well Fluid changed to Crude Oil
1994-01-21 Well Mode changed to Pumping
1995-11-20 Perforation Treatment Performed - Jet Perforation
1995-11-24 Perforation Treatment Performed - Cement Squeeze
1995-11-26 Perforation Treatment Performed - Jet Perforation
1995-11-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-05-01 Perforation Treatment Performed - Jet Perforation
1996-05-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-11-11 Perforation Treatment Performed - Jet Perforation
1997-11-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-01-01 Well Fluid changed to Crude Oil
1999-01-01 Well Mode changed to Suspended
2002-09-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-09-25 Plug Back Performed
2002-09-25 Well Fluid changed to Crude Oil
2002-09-25 Well Mode changed to Abandoned Zone
2002-09-27 Perforation Treatment Performed - Cement Plug
2002-09-27 Perforation Treatment Performed - Jet Perforation
2002-09-27 Perforation Treatment Performed - Remedial Casing
2002-09-27 Plug Back Performed
2002-09-27 Well Log Performed
2004-05-07 Perforation Treatment Performed - Jet Perforation
2004-05-08 Perforation Treatment Performed - Cement Plug
2004-05-08 Perforation Treatment Performed - Remedial Casing
2004-05-08 Plug Back Performed
2004-05-11 Perforation Treatment Performed - Jet Perforation
2004-05-12 Perforation Treatment Performed - Cement Plug
2004-05-12 Perforation Treatment Performed - Remedial Casing
2004-05-12 Plug Back Performed
2005-05-30 Well Abandoned
2005-05-30 Well Fluid changed to Crude Oil
2005-05-30 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-06-25 Open Hole/Barefoot Completion 2136.00 2147.30 0
1993-12-22 Perforation 2142.50 2143.00 20
1993-12-22 Acid Treatment 2142.50 2143.00 0
1995-11-20 Perforation 2141.70 2142.00 24
1995-11-24 Cement Squeeze 2142.50 2143.00 0
1995-11-26 Perforation 2141.00 2141.50 13
1995-11-27 Acid Treatment 2141.00 2141.50 0
1996-05-01 Perforation 2137.50 2138.20 13
1996-05-02 Acid Treatment 2137.50 2138.20 0
1997-11-11 Perforation 2125.00 2126.00 16
1997-11-12 Acid Treatment 2125.00 2126.00 0
1977-10-03 Cement Squeeze 2136.00 2147.30 0
2002-09-25 Packing Device Capped w/Cement 2068.50 2118.00 0
2002-09-27 Cement Plug 1554.70 1640.70 0
2002-09-27 Perforation 1625.00 1625.50 26
2002-09-27 Remedial Casing Cementing 1625.00 1625.50 0
2002-09-27 Cement Plug 538.00 1554.70 0
2004-05-07 Perforation 369.00 369.50 26
2004-05-08 Remedial Casing Cementing 369.00 369.50 0
2004-05-08 Cement Plug 336.30 369.50 0
2004-05-11 Perforation 199.00 199.50 26
2004-05-12 Remedial Casing Cementing 199.00 199.50 0
1977-10-05 Perforation 2147.30 2150.40 7
2004-05-12 Cement Plug 122.20 214.00 0
1977-10-06 Acid Treatment 2147.30 2150.40 0
1985-01-30 Perforation 2100.00 2102.00 13
1985-01-30 Perforation 2155.00 2157.00 13
1985-01-31 Acid Treatment 2155.00 2157.00 0
1985-02-01 Acid Treatment 2100.00 2102.00 0
1993-12-18 Cement Squeeze 2100.00 2102.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 4660 0.0 0.0 0.0
1968 4461 0.0 0.0 0.0
1969 5724 0.0 0.0 0.0
1970 4561 0.0 0.0 0.0
1971 6691 0.0 0.0 0.0
1972 6889 0.0 0.0 0.0
1973 8309 0.0 0.0 0.0
1974 7389 0.0 0.0 0.0
1975 6650 0.0 0.0 0.0
1976 5288 0.0 0.0 0.0
1977 5518 0.0 0.0 0.0
1978 5664 0.0 0.0 0.0
1979 7665 0.0 0.0 0.0
1980 7129 0.0 0.0 0.0
1981 6578 0.0 0.0 0.0
1982 4012 0.0 0.0 0.0
1983 7666 0.0 0.0 0.0
1984 8053 0.0 0.0 0.0
1985 6932 0.0 0.0 0.0
1986 7900 0.0 0.0 0.0
1987 8289 0.0 0.0 0.0
1988 4376 0.0 0.0 0.0
1994 7837 0.0 0.0 0.0
1995 8088 0.0 0.0 0.0
1996 8481 0.0 0.0 0.0
1997 4197 0.0 0.0 0.0
1998 5518 0.0 0.0 0.0

For data sources see[5]

References