X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0464282409000

Well Details

Well ID: 0464282409000
Loading map...
Location: 00/09-24-046-28W4/0
Location Alias: 00/09-24-46-28 W4M
Location Alias 2: 00/09-24-046-28 W4/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 4
Range: 28
Section: 24
County/Municipality: Pigeon Lake 138A
Well Name: IMP IR8 BONNIE GLEN
Operator Name: Imperial Oil Resources Limited
License Number: 0007167
License Date: 1953-10-09
License Status: Abandoned
Spud Date: 1953-10-21
Final Drill Date: 1953-11-30
Well Total Depth: 2180.50 m
Surface Hole Latitude: 52.983709
Surface Hole Longitude: -113.925746

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-10-09 Obtained License
1953-11-28 Liner Casing Operation Performed
1953-11-30 Finished Drilling
1953-11-30 Perforation Treatment Performed - Open-Hole Completion
1953-11-30 Well Mode changed to Drilled and Cased
1953-12-04 Well Began Production
1953-12-04 Well Fluid changed to Crude Oil
1953-12-04 Well Mode changed to Flowing
1977-10-19 Perforation Treatment Performed - Cement Squeeze
1977-10-20 Perforation Treatment Performed - Jet Perforation
1977-10-21 Perforation Treatment Performed - Acid Wash - No Pressure
1978-03-21 Well Log Performed
1979-05-30 Well Log Performed
1988-12-12 Well Fluid changed to Crude Oil
1988-12-12 Well Mode changed to Pumping
1992-07-01 Well Fluid changed to Crude Oil
1992-07-01 Well Mode changed to Suspended
1993-10-03 Perforation Treatment Performed - Casing Patch (Over Perfs)
1993-10-03 Perforation Treatment Performed - Jet Perforation
1993-10-03 Well Log Performed
1993-10-04 Perforation Treatment Performed - Fractured
1993-10-13 Well Fluid changed to Crude Oil
1993-10-13 Well Mode changed to Pumping
1997-01-10 Well Log Performed
1997-01-11 Perforation Treatment Performed - Jet Perforation
1997-03-01 Well Fluid changed to Crude Oil
1997-03-01 Well Mode changed to Suspended
2002-09-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-09-12 Plug Back Performed
2002-09-12 Well Fluid changed to Crude Oil
2002-09-12 Well Mode changed to Abandoned Zone
2002-09-14 Perforation Treatment Performed - Jet Perforation
2002-09-14 Well Log Performed
2002-09-15 Perforation Treatment Performed - Cement Plug
2002-09-15 Perforation Treatment Performed - Remedial Casing
2002-09-15 Plug Back Performed
2002-09-17 Perforation Treatment Performed - Cement Plug
2002-09-17 Plug Back Performed
2002-09-18 Perforation Treatment Performed - Cement Plug
2002-09-18 Perforation Treatment Performed - Jet Perforation
2002-09-18 Perforation Treatment Performed - Remedial Casing
2002-09-18 Plug Back Performed
2002-09-18 Well Log Performed
2002-09-19 Perforation Treatment Performed - Jet Perforation
2002-09-19 Well Log Performed
2002-09-21 Perforation Treatment Performed - Cement Plug
2002-09-21 Perforation Treatment Performed - Remedial Casing
2002-09-21 Plug Back Performed
2002-09-23 Perforation Treatment Performed - Cement Plug
2002-09-23 Perforation Treatment Performed - Jet Perforation
2002-09-23 Perforation Treatment Performed - Remedial Casing
2002-09-23 Plug Back Performed
2003-08-07 Well Abandoned
2003-08-07 Well Fluid changed to Crude Oil
2003-08-07 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-11-30 Open Hole/Barefoot Completion 2133.00 2140.60 0
2002-09-14 Perforation 1622.00 1622.50 26
2002-09-15 Remedial Casing Cementing 1622.00 1622.50 0
2002-09-15 Cement Plug 1503.80 1663.90 0
2002-09-17 Cement Plug 410.00 1503.80 0
2002-09-18 Perforation 258.50 259.00 26
2002-09-18 Remedial Casing Cementing 258.50 259.00 0
2002-09-18 Cement Plug 210.50 410.00 0
2002-09-19 Perforation 207.50 208.00 26
2002-09-21 Remedial Casing Cementing 207.50 208.00 0
2002-09-21 Cement Plug 196.70 210.50 0
1977-10-19 Cement Squeeze 2133.00 2140.60 0
2002-09-23 Perforation 190.00 190.50 26
2002-09-23 Remedial Casing Cementing 190.00 190.50 0
2002-09-23 Cement Plug 130.00 196.70 0
1977-10-20 Perforation 2142.70 2145.80 7
1977-10-21 Acid Wash 2142.70 2145.80 0
1993-10-03 Casing Patch 2133.00 2135.00 0
1993-10-03 Perforation 2132.40 2133.50 20
1993-10-04 Fracture 2132.40 2133.50 0
1997-01-11 Perforation 2127.80 2128.40 16
2002-09-12 Packing Device Capped w/Cement 1663.90 2120.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1969 235 0.0 0.0 0.0
1970 3537 0.0 0.0 0.0
1971 4682 0.0 0.0 0.0
1972 4314 0.0 0.0 0.0
1973 7133 0.0 0.0 0.0
1974 7424 0.0 0.0 0.0
1975 5914 0.0 0.0 0.0
1976 6338 0.0 0.0 0.0
1977 6450 0.0 0.0 0.0
1978 6619 0.0 0.0 0.0
1979 7785 0.0 0.0 0.0
1980 7174 0.0 0.0 0.0
1981 7118 0.0 0.0 0.0
1982 4864 0.0 0.0 0.0
1983 4411 0.0 0.0 0.0
1984 6716 0.0 0.0 0.0
1985 6401 0.0 0.0 0.0
1986 8053 0.0 0.0 0.0
1987 8193 0.0 0.0 0.0
1988 8206 0.0 0.0 0.0
1989 3041 0.0 0.0 0.0
1993 1084 0.0 0.0 0.0
1994 8370 0.0 0.0 0.0
1995 8322 0.0 0.0 0.0
1996 8500 0.0 0.0 0.0
1997 539 0.0 0.0 0.0

For data sources see[5]

References