0464281004000

Well Details

Well ID: 0464281004000
Loading map...
Location: 00/04-10-046-28W4/0
Location Alias: 00/04-10-46-28 W4M
Location Alias 2: 00/04-10-046-28 W4/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 4
Range: 28
Section: 10
County/Municipality: County of Wetaskiwin No. 10
Well Name: CVE WROSE 4-10-46-28
Operator Name: Cenovus Energy Inc.
License Number: 0006697
License Date: 1953-07-10
License Status: Abandoned
Spud Date: 1953-08-12
Final Drill Date: 1953-10-06
Well Total Depth: 2230.90 m
Surface Hole Latitude: 52.947004
Surface Hole Longitude: -113.991263

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-07-10 Obtained License
1953-10-02 Liner Casing Operation Performed
1953-10-06 Finished Drilling
1953-10-06 Perforation Treatment Performed - Open-Hole Completion
1953-10-06 Well Mode changed to Drilled and Cased
1953-10-18 Well Began Production
1953-10-18 Well Fluid changed to Crude Oil
1953-10-18 Well Mode changed to Flowing
1974-06-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-08-15 Perforation Treatment Performed - Cement Squeeze
1981-09-02 Well Log Performed
1981-09-15 Perforation Treatment Performed - Jet Perforation
1981-09-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-12-10 Perforation Treatment Performed - Cement Squeeze
1981-12-15 Perforation Treatment Performed - Jet Perforation
1981-12-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-12-17 Well Fluid changed to Crude Oil
1981-12-17 Well Mode changed to Gas Lift
1983-10-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-10-28 Perforation Treatment Performed - Jet Perforation
1983-10-31 Perforation Treatment Performed - Cement Squeeze
1983-11-03 Well Log Performed
1983-11-04 Perforation Treatment Performed - Jet Perforation
1983-11-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-11-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-08-22 Perforation Treatment Performed - Cement Squeeze
1985-08-24 Perforation Treatment Performed - Jet Perforation
1985-08-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-08-25 Perforation Treatment Performed - Cement Squeeze
1985-08-26 Perforation Treatment Performed - Jet Perforation
1985-08-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-07-18 Perforation Treatment Performed - Cement Squeeze
1992-07-23 Perforation Treatment Performed - Jet Perforation
1992-09-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-11-14 Perforation Treatment Performed - Jet Perforation
1995-03-31 Well Log Performed
1996-09-16 Well Log Performed
1996-09-24 Well Log Performed
1996-09-26 Perforation Treatment Performed - Cement Squeeze
1996-09-26 Well Log Performed
1996-09-27 Perforation Treatment Performed - Jet Perforation
1996-09-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-09-15 Perforation Treatment Performed - Jet Perforation
1997-09-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-03-14 Well Log Performed
1998-03-16 Perforation Treatment Performed - Jet Perforation
1998-03-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-08-27 Perforation Treatment Performed - Jet Perforation
1998-08-27 Well Log Performed
1998-08-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-09-03 Perforation Treatment Performed - Cement Squeeze
1998-09-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-09-08 Perforation Treatment Performed - Jet Perforation
1999-05-01 Well Fluid changed to Crude Oil
1999-05-01 Well Mode changed to Suspended
1999-06-04 Well Fluid changed to Crude Oil
1999-06-04 Well Mode changed to Pumping
2000-09-01 Well Fluid changed to Crude Oil
2000-09-01 Well Mode changed to Suspended
2003-12-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-12-06 Plug Back Performed
2003-12-06 Well Fluid changed to Crude Oil
2003-12-06 Well Mode changed to Abandoned Zone
2003-12-10 Perforation Treatment Performed - Cement Plug
2003-12-10 Well Log Performed
2003-12-12 Well Abandoned
2003-12-12 Well Fluid changed to Crude Oil
2003-12-12 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-10-06 Open Hole/Barefoot Completion 2194.90 2203.40 0
1983-10-28 Acid Treatment 2193.00 2194.00 0
1983-10-31 Cement Squeeze 2193.00 2194.00 0
1983-11-04 Perforation 2198.50 2200.00 13
1983-11-06 Acid Treatment 2197.50 2200.00 0
1983-11-25 Acid Treatment 2197.50 2200.00 0
1985-08-22 Cement Squeeze 2197.50 2200.00 0
1985-08-24 Perforation 2208.50 2209.50 13
1985-08-25 Acid Treatment 2208.50 2209.50 0
1985-08-25 Cement Squeeze 2208.50 2209.50 0
1985-08-26 Perforation 2205.00 2206.50 13
1974-06-13 Acid Treatment 2194.90 2203.40 0
1985-08-27 Acid Treatment 2205.00 2206.50 0
1992-07-18 Cement Squeeze 2205.00 2206.50 0
1992-07-23 Perforation 2210.30 2211.00 20
1992-09-24 Acid Treatment 2210.30 2211.00 0
1993-11-14 Perforation 2211.00 2212.50 13
1996-09-26 Cement Squeeze 2210.30 2212.50 0
1996-09-27 Perforation 2200.00 2202.00 20
1996-09-28 Acid Treatment 2200.00 2202.00 0
1997-09-15 Perforation 2192.00 2193.50 14
1997-09-16 Acid Treatment 2192.00 2193.50 0
1981-08-15 Cement Squeeze 2194.90 2203.40 0
1998-03-16 Perforation 2182.50 2184.00 17
1998-03-17 Acid Treatment 2182.50 2184.00 0
1998-08-27 Perforation 2172.50 2174.00 17
1998-08-28 Acid Treatment 2172.50 2174.00 0
1998-09-03 Cement Squeeze 2172.50 2186.00 0
1998-09-08 Perforation 2170.00 2171.50 17
1998-09-08 Acid Treatment 2170.00 2171.50 0
2003-12-06 Packing Device Capped w/Cement 2035.00 2160.00 0
2003-12-10 Cement Plug 1225.00 1330.00 0
1981-09-15 Perforation 2196.50 2198.50 13
1981-09-18 Acid Treatment 2196.50 2198.50 0
1981-12-10 Cement Squeeze 2196.50 2198.50 0
1981-12-15 Perforation 2197.50 2199.50 13
1981-12-16 Acid Treatment 2197.50 2199.50 0
1983-10-28 Perforation 2193.00 2194.00 16

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 3714 0.0 0.0 0.0
1968 3000 0.0 0.0 0.0
1969 4711 0.0 0.0 0.0
1970 7129 0.0 0.0 0.0
1971 5771 0.0 0.0 0.0
1972 6282 0.0 0.0 0.0
1973 8386 0.0 0.0 0.0
1974 6595 0.0 0.0 0.0
1975 6323 0.0 0.0 0.0
1976 5596 0.0 0.0 0.0
1977 3969 0.0 0.0 0.0
1978 6672 0.0 0.0 0.0
1979 8040 0.0 0.0 0.0
1980 6215 0.0 0.0 0.0
1981 6262 0.0 0.0 0.0
1982 7688 0.0 0.0 0.0
1983 4993 0.0 0.0 0.0
1984 6106 0.0 0.0 0.0
1985 5606 0.0 0.0 0.0
1986 6648 0.0 0.0 0.0
1987 6718 0.0 0.0 0.0
1988 7980 0.0 0.0 0.0
1989 8372 0.0 0.0 0.0
1990 8269 0.0 0.0 0.0
1991 6797 0.0 0.0 0.0
1992 2332 0.0 0.0 0.0
1993 2150 0.0 0.0 0.0
1994 7142 0.0 0.0 0.0
1995 929 0.0 0.0 0.0
1996 2417 0.0 0.0 0.0
1997 7897 0.0 0.0 0.0
1998 5211 0.0 0.0 0.0
1999 2572 0.0 0.0 0.0

For data sources see[5]

References