X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0464280416000

Well Details

Well ID: 0464280416000
Loading map...
Location: 00/16-04-046-28W4/0
Location Alias: 00/16-04-46-28 W4M
Location Alias 2: 00/16-04-046-28 W4/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 4
Range: 28
Section: 04
County/Municipality: County of Wetaskiwin No. 10
Well Name: CVE WROSE 16-4-46-28
Operator Name: Cenovus Energy Inc.
License Number: 0099614
License Date: 1982-12-07
License Status: Issued
Spud Date: 1982-12-13
Final Drill Date: 1982-12-29
Well Total Depth: 2234.00 m
Surface Hole Latitude: 52.942263
Surface Hole Longitude: -113.995677

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-12-07 Obtained License
1982-12-29 Finished Drilling
1982-12-29 Well Mode changed to Drilled and Cased
1982-12-31 Production Casing Operation Performed
1983-01-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-01-21 Perforation Treatment Performed - Jet Perforation
1983-01-26 Perforation Treatment Performed - Cement Squeeze
1983-01-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-01-29 Perforation Treatment Performed - Jet Perforation
1983-01-29 Well Began Production
1983-01-29 Well Fluid changed to Crude Oil
1983-01-29 Well Mode changed to Pumping
1983-10-19 Perforation Treatment Performed - Cement Squeeze
1983-10-22 Perforation Treatment Performed - Jet Perforation
1983-10-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-01-27 Well Log Performed
1984-01-28 Perforation Treatment Performed - Jet Perforation
1984-01-28 Well Log Performed
1984-01-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-02-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-02-01 Perforation Treatment Performed - Cement Squeeze
1984-02-03 Perforation Treatment Performed - Cement Squeeze
1984-02-04 Well Log Performed
1984-02-05 Perforation Treatment Performed - Jet Perforation
1984-02-05 Well Log Performed
1984-02-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-04-15 Perforation Treatment Performed - Cement Squeeze
1984-04-15 Well Log Performed
1984-04-16 Perforation Treatment Performed - Jet Perforation
1984-04-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-04-18 Well Log Performed
1984-04-19 Perforation Treatment Performed - Cement Squeeze
1984-04-23 Well Log Performed
1984-04-24 Perforation Treatment Performed - Jet Perforation
1984-04-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-04-26 Well Fluid changed to Crude Oil
1984-04-26 Well Mode changed to Gas Lift
1986-08-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-08-16 Perforation Treatment Performed - Cement Squeeze
1986-08-21 Perforation Treatment Performed - Jet Perforation
1986-08-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-03-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-05-26 Well Log Performed
1994-06-01 Well Log Performed
1994-06-09 Well Log Performed
1997-04-25 Perforation Treatment Performed - Cement Squeeze
1997-04-25 Plug Back Performed
1997-04-25 Well Log Performed
1997-04-26 Perforation Treatment Performed - Jet Perforation
1997-04-26 Well Log Performed
1997-04-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-11-25 Well Log Performed
1997-11-26 Perforation Treatment Performed - Jet Perforation
1997-11-26 Well Log Performed
1997-11-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-12-09 Well Log Performed
1999-04-30 Perforation Treatment Performed - Jet Perforation
1999-04-30 Well Log Performed
1999-05-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-09-01 Well Fluid changed to Crude Oil
2000-09-01 Well Mode changed to Suspended
2000-12-14 Well Log Performed
2000-12-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-12-15 Plug Back Performed
2000-12-15 Well Fluid changed to Crude Oil
2000-12-15 Well Mode changed to Abandoned Zone
2005-09-09 Well Log Performed
2005-09-10 Perforation Treatment Performed - Jet Perforation
2005-09-10 Well Log Performed
2005-09-12 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-01-21 Perforation 2165.50 2166.50 13
1984-01-29 Acid Treatment 2210.00 2216.00 0
1984-02-01 Cement Squeeze 2210.00 2216.00 0
1984-02-01 Acid Treatment 2165.50 2166.50 0
1984-02-03 Cement Squeeze 2165.50 2166.50 0
1984-02-05 Perforation 2210.50 2212.50 13
1984-02-06 Acid Treatment 2210.50 2212.50 0
1984-04-15 Cement Squeeze 2210.50 2212.50 0
1984-04-16 Perforation 2219.50 2221.00 13
1984-04-17 Acid Treatment 2219.50 2221.00 0
1984-04-19 Cement Squeeze 2219.50 2221.00 0
1983-01-21 Acid Treatment 2165.50 2166.50 0
1984-04-24 Perforation 2210.50 2212.50 13
1984-04-25 Acid Treatment 2210.50 2212.50 0
1986-08-16 Acid Treatment 2210.50 2212.50 0
1986-08-16 Cement Squeeze 2210.50 2212.50 0
1986-08-21 Perforation 2216.40 2217.40 13
1986-08-22 Acid Treatment 2216.40 2217.40 0
1988-03-03 Acid Treatment 2216.40 2217.40 0
1997-04-25 Cement Squeeze 2216.40 2217.40 0
1997-04-26 Perforation 2210.50 2212.50 17
1997-04-27 Acid Treatment 2210.50 2212.50 0
1983-01-26 Cement Squeeze 2165.50 2166.50 0
1997-11-26 Perforation 2197.50 2199.00 17
1997-11-27 Acid Treatment 2197.50 2199.00 0
1999-04-30 Perforation 2160.50 2180.00 17
1999-05-01 Acid Treatment 2160.50 2180.00 0
2000-12-15 Packing Device Capped w/Cement 2142.00 2150.00 0
2005-09-10 Perforation 1697.00 1702.00 17
2005-09-12 Fracture 1697.00 1702.00 0
1983-01-29 Perforation 2210.00 2213.00 13
1983-01-29 Acid Treatment 2210.00 2213.00 0
1983-10-19 Cement Squeeze 2210.00 2213.00 0
1983-10-22 Perforation 2210.00 2213.00 13
1983-10-23 Acid Treatment 2210.00 2213.00 0
1984-01-28 Perforation 2214.00 2216.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 3183 0.0 0.0 0.0
1984 6209 0.0 0.0 0.0
1985 5055 0.0 0.0 0.0
1986 3934 0.0 0.0 0.0
1987 7298 0.0 0.0 0.0
1988 7095 0.0 0.0 0.0
1989 7685 0.0 0.0 0.0
1990 5862 0.0 0.0 0.0
1991 5970 0.0 0.0 0.0
1992 7277 0.0 0.0 0.0
1993 5239 0.0 0.0 0.0
1994 5772 0.0 0.0 0.0
1995 8359 0.0 0.0 0.0
1996 7841 0.0 0.0 0.0
1997 2003 0.0 0.0 0.0
1998 8289 0.0 0.0 0.0
1999 8453 0.0 0.0 0.0
2000 5143 0.0 0.0 0.0

For data sources see[5]

References