X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0464280315000

Well Details

Well ID: 0464280315000
Loading map...
Location: 00/15-03-046-28W4/0
Location Alias: 00/15-03-46-28 W4M
Location Alias 2: 00/15-03-046-28 W4/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 4
Range: 28
Section: 03
County/Municipality: County of Wetaskiwin No. 10
Well Name: CVE WROSE 15-3-46-28
Operator Name: Cenovus Energy Inc.
License Number: 0130448
License Date: 1987-12-03
License Status: Suspension
Spud Date: 1987-12-07
Final Drill Date: 1987-12-31
Well Total Depth: 2227.00 m
Surface Hole Latitude: 52.943530
Surface Hole Longitude: -113.979976

For data sources see[1][2]

Well History

Date Event
1987-12-03 Obtained License
1987-12-08 Surface Casing Operation Performed
1987-12-17 Well Log Performed
1987-12-21 Intermediate Casing Operation Performed
1987-12-31 Finished Drilling
1987-12-31 Well Mode changed to Drilled and Cased
1988-01-01 Well Log Performed
1988-01-02 Liner Casing Operation Performed
1988-01-03 Rig Released
1988-02-16 Perforation Treatment Performed - Jet Perforation
1988-02-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-02-17 Well Began Production
1988-02-17 Well Fluid changed to Crude Oil
1988-02-17 Well Mode changed to Gas Lift
1989-07-31 Well Log Performed
1989-08-10 Perforation Treatment Performed - Cement Squeeze
1989-08-14 Perforation Treatment Performed - Cement Squeeze
1989-08-14 Perforation Treatment Performed - Jet Perforation
1989-08-14 Well Log Performed
1989-08-15 Perforation Treatment Performed - Jet Perforation
1989-08-15 Well Log Performed
1989-08-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-08-21 Perforation Treatment Performed - Jet Perforation
1989-08-21 Well Log Performed
1989-08-27 Perforation Treatment Performed - Cement Squeeze
1990-01-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-11-22 Well Log Performed
1994-12-02 Well Log Performed
1996-03-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-02-05 Well Log Performed
1997-02-11 Perforation Treatment Performed - Cement Squeeze
1997-02-12 Perforation Treatment Performed - Jet Perforation
1997-02-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-10-20 Well Log Performed
1997-10-21 Perforation Treatment Performed - Jet Perforation
1997-10-21 Well Log Performed
1997-10-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-01-25 Well Log Performed
1999-01-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-01-26 Perforation Treatment Performed - Jet Perforation
1999-01-26 Well Log Performed
2000-03-17 Perforation Treatment Performed - Jet Perforation
2000-03-17 Well Log Performed
2000-03-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-03-07 Perforation Treatment Performed - Jet Perforation
2001-03-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-11-27 Well Log Performed
2001-11-28 Perforation Treatment Performed - Jet Perforation
2001-11-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-01-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-09-01 Well Fluid changed to Crude Oil
2003-09-01 Well Mode changed to Suspended
2007-07-26 Well Fluid changed to Crude Oil
2007-07-26 Well Mode changed to Gas Lift
2008-07-01 Well Fluid changed to Crude Oil
2008-07-01 Well Mode changed to Suspended
2010-05-01 Well Fluid changed to Crude Oil
2010-05-01 Well Mode changed to Pumping
2010-09-21 Well Fluid changed to Crude Oil
2010-09-21 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-02-16 Perforation 2205.00 2206.00 13
1990-01-23 Acid Treatment 2205.00 2206.00 0
1996-03-27 Acid Treatment 2205.00 2206.00 0
1997-02-11 Cement Squeeze 2205.00 2206.50 0
1997-02-12 Perforation 2201.80 2203.20 13
1997-02-13 Acid Treatment 2201.80 2203.20 0
1997-10-21 Perforation 2186.00 2187.50 13
1997-10-22 Acid Treatment 2186.00 2187.50 0
1999-01-26 Perforation 2157.00 2159.00 18
1999-01-26 Perforation 2171.00 2173.00 18
1999-01-26 Acid Treatment 2157.00 2173.00 0
1988-02-17 Acid Treatment 2205.00 2206.00 0
2000-03-17 Perforation 2123.00 2126.00 18
2000-03-17 Perforation 2141.00 2144.00 18
2000-03-18 Acid Treatment 2123.00 2126.00 0
2000-03-18 Acid Treatment 2141.00 2144.00 0
2001-03-07 Perforation 2107.00 2110.00 17
2001-03-07 Perforation 2094.00 2097.00 17
2001-03-08 Acid Treatment 2107.00 2110.00 0
2001-03-08 Acid Treatment 2094.00 2097.00 0
2001-11-28 Perforation 2046.00 2049.00 17
2001-11-28 Perforation 2042.00 2044.00 17
1989-08-10 Cement Squeeze 2205.00 2206.00 0
2001-11-29 Acid Treatment 2046.00 2049.00 0
2001-11-29 Acid Treatment 2042.00 2044.00 0
2002-01-08 Acid Treatment 2046.00 2049.00 0
2002-01-08 Acid Treatment 2042.00 2044.00 0
1989-08-14 Perforation 2209.00 2210.00 13
1989-08-14 Cement Squeeze 2209.00 2210.00 0
1989-08-15 Perforation 2205.00 2206.50 13
1989-08-17 Acid Treatment 2205.00 2206.50 0
1989-08-21 Perforation 2187.50 2188.50 13
1989-08-27 Cement Squeeze 2187.50 2188.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 5845 0.0 0.0 0.0
1989 4744 0.0 0.0 0.0
1990 6235 0.0 0.0 0.0
1991 1882 0.0 0.0 0.0
1992 500 0.0 0.0 0.0
1993 125 0.0 0.0 0.0
1994 620 0.0 0.0 0.0
1995 4885 0.0 0.0 0.0
1996 1074 0.0 0.0 0.0
1997 4923 0.0 0.0 0.0
1998 7854 0.0 0.0 0.0
1999 8167 0.0 0.0 0.0
2000 6976 0.0 0.0 0.0
2001 7595 0.0 0.0 0.0
2002 576 0.0 0.0 0.0
2007 120 0.0 0.0 0.0
2010 2825 0.0 0.0 0.0

For data sources see[5]

References