X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0464280310000

Well Details

Well ID: 0464280310000
Loading map...
Location: 00/10-03-046-28W4/0
Location Alias: 00/10-03-46-28 W4M
Location Alias 2: 00/10-03-046-28 W4/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 4
Range: 28
Section: 03
County/Municipality: County of Wetaskiwin No. 10
Well Name: CVE WROSE 10-3-46-28
Operator Name: Cenovus Energy Inc.
License Number: 0006118
License Date: 1953-02-26
License Status: RecCertified
Spud Date: 1953-05-23
Final Drill Date: 1953-07-13
Well Total Depth: 2243.70 m
Surface Hole Latitude: 52.939787
Surface Hole Longitude: -113.979405

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-02-26 Obtained License
1953-06-10 Drill Stem Test Performed
1953-07-09 Liner Casing Operation Performed
1953-07-13 Finished Drilling
1953-07-13 Perforation Treatment Performed - Open-Hole Completion
1953-07-13 Well Mode changed to Drilled and Cased
1953-07-15 Well Began Production
1953-07-15 Well Fluid changed to Crude Oil
1953-07-15 Well Mode changed to Flowing
1974-06-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-06-20 Perforation Treatment Performed - Open-Hole Completion
1982-06-22 Perforation Treatment Performed - Cement Squeeze
1982-07-17 Perforation Treatment Performed - Jet Perforation
1982-07-17 Well Fluid changed to Crude Oil
1982-07-17 Well Mode changed to Gas Lift
1982-07-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-08-12 Well Log Performed
1985-01-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-01-26 Perforation Treatment Performed - Cement Squeeze
1985-01-30 Perforation Treatment Performed - Jet Perforation
1985-01-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-07-15 Perforation Treatment Performed - Cement Squeeze
1986-07-23 Perforation Treatment Performed - Jet Perforation
1986-07-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-07-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-07-30 Perforation Treatment Performed - Jet Perforation
1986-07-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-10-05 Perforation Treatment Performed - Cement Squeeze
1988-10-07 Perforation Treatment Performed - Jet Perforation
1988-10-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-09-19 Perforation Treatment Performed - Jet Perforation
1989-09-19 Well Log Performed
1989-09-20 Well Log Performed
1989-09-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-09-27 Perforation Treatment Performed - Jet Perforation
1989-09-27 Well Log Performed
1989-09-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-04-08 Perforation Treatment Performed - Jet Perforation
1997-04-08 Well Log Performed
1997-04-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-04-13 Perforation Treatment Performed - Jet Perforation
1998-04-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-08-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-08-31 Perforation Treatment Performed - Jet Perforation
2000-09-01 Well Fluid changed to Crude Oil
2000-09-01 Well Mode changed to Suspended
2004-10-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-10-02 Plug Back Performed
2004-10-02 Well Log Performed
2004-10-05 Well Log Performed
2004-10-06 Perforation Treatment Performed - Cement Squeeze
2004-10-06 Perforation Treatment Performed - Jet Perforation
2004-10-06 Well Log Performed
2004-10-07 Perforation Treatment Performed - Cement Squeeze
2004-10-07 Perforation Treatment Performed - Jet Perforation
2004-10-07 Well Log Performed
2004-10-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-10-12 Well Abandoned
2004-10-12 Well Fluid changed to Crude Oil
2004-10-12 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-07-13 Open Hole/Barefoot Completion 2195.20 2203.70 0
1985-01-31 Acid Treatment 2202.00 2203.50 0
1986-07-15 Cement Squeeze 2202.00 2203.50 0
1986-07-23 Perforation 2203.50 2205.00 13
1986-07-24 Acid Treatment 2203.50 2205.00 0
1986-07-29 Acid Treatment 2203.50 2205.00 0
1986-07-30 Perforation 2203.50 2205.00 13
1986-07-31 Acid Treatment 2203.50 2205.00 0
1988-10-05 Cement Squeeze 2203.50 2205.00 0
1988-10-07 Perforation 2205.50 2206.50 13
1988-10-08 Acid Treatment 2205.50 2206.50 0
1974-06-08 Acid Treatment 2195.20 2203.70 0
1989-09-19 Perforation 2207.50 2208.50 13
1989-09-26 Acid Treatment 2207.50 2208.50 0
1989-09-27 Perforation 2197.00 2199.00 13
1989-09-28 Acid Treatment 2197.00 2199.00 0
1997-04-08 Perforation 2201.00 2202.00 13
1997-04-09 Acid Treatment 2201.00 2202.00 0
1998-04-13 Perforation 2188.00 2189.50 17
1998-04-14 Acid Treatment 2188.00 2189.50 0
1999-08-31 Perforation 2180.00 2182.50 17
1999-08-31 Acid Treatment 2180.00 2182.50 0
1982-06-20 Open Hole/Barefoot Completion 2195.20 2243.70 0
2004-10-02 Packing Device Capped w/Cement 2045.00 2170.00 0
2004-10-06 Perforation 1485.00 1485.50 12
2004-10-06 Cement Squeeze 1485.00 1485.50 0
2004-10-06 Perforation 916.00 916.50 12
2004-10-06 Cement Squeeze 916.00 916.50 0
2004-10-07 Perforation 359.00 359.50 12
2004-10-07 Cement Squeeze 359.00 359.50 0
2004-10-08 Packing Device Capped w/Cement 349.00 357.00 0
1982-06-22 Cement Squeeze 2195.20 2243.70 0
1982-07-17 Perforation 2197.00 2199.00 13
1982-07-21 Acid Treatment 2197.00 2199.00 0
1985-01-25 Acid Treatment 2197.00 2199.00 0
1985-01-26 Cement Squeeze 2197.00 2199.00 0
1985-01-30 Perforation 2202.00 2203.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 324 0.0 0.0 0.0
1970 6769 0.0 0.0 0.0
1971 6967 0.0 0.0 0.0
1972 6593 0.0 0.0 0.0
1973 7977 0.0 0.0 0.0
1974 8219 0.0 0.0 0.0
1975 4479 0.0 0.0 0.0
1976 5815 0.0 0.0 0.0
1977 5461 0.0 0.0 0.0
1978 5870 0.0 0.0 0.0
1979 8151 0.0 0.0 0.0
1980 7023 0.0 0.0 0.0
1981 7924 0.0 0.0 0.0
1982 6244 0.0 0.0 0.0
1983 6178 0.0 0.0 0.0
1984 7458 0.0 0.0 0.0
1985 4827 0.0 0.0 0.0
1986 6810 0.0 0.0 0.0
1987 7789 0.0 0.0 0.0
1988 7213 0.0 0.0 0.0
1989 3294 0.0 0.0 0.0
1990 3518 0.0 0.0 0.0
1991 5876 0.0 0.0 0.0
1992 6671 0.0 0.0 0.0
1993 4356 0.0 0.0 0.0
1994 8301 0.0 0.0 0.0
1995 8697 0.0 0.0 0.0
1996 5362 0.0 0.0 0.0
1997 1838 0.0 0.0 0.0
1998 6569 0.0 0.0 0.0
1999 5659 0.0 0.0 0.0

For data sources see[5]

References