If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0464200216000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.942043,"lon":-112.791307,"icon":""}]} |
Location: 00/16-02-046-20W4/0 | |
Location Alias: 00/16-02-46-20 W4M | |
Location Alias 2: 00/16-02-046-20 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 046 | |
Meridian: 4 | |
Range: 20 | |
Section: 02 | |
County/Municipality: Camrose County | |
Well Name: RANCHMEN'S BATTLE 16-2-46-20 | |
Operator Name: ConocoPhillips Canada Resources Corp. | |
License Number: 0077983 | |
License Date: 1979-09-12 | |
License Status: RecCertified | |
Spud Date: 1979-09-13 | |
Final Drill Date: 1979-09-18 | |
Well Total Depth: 1005.00 m | |
Surface Hole Latitude: 52.942043 | |
Surface Hole Longitude: -112.791307 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1979-09-12 | Obtained License |
1979-09-18 | Finished Drilling |
1979-09-18 | Production Casing Operation Performed |
1979-09-18 | Well Mode changed to Drilled and Cased |
1979-09-27 | Perforation Treatment Performed - Jet Perforation |
1979-09-29 | Well Began Production |
1979-09-29 | Well Fluid changed to Crude Oil |
1979-09-29 | Well Mode changed to Pumping |
1982-05-16 | Perforation Treatment Performed - Chemical Squeeze |
1987-07-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1987-07-08 | Plug Back Performed |
1987-07-08 | Well Abandoned |
1987-07-08 | Well Fluid changed to Crude Oil |
1987-07-08 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1979-09-27 | Perforation | 977.00 | 978.00 | 10 |
1982-05-16 | Chemical Squeeze | 977.00 | 978.00 | 0 |
1987-07-08 | Packing Device Capped w/Cement | 966.00 | 974.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1979 | 1848 | 0.0 | 0.0 | 0.0 |
1980 | 7195 | 0.0 | 0.0 | 0.0 |
1981 | 5206 | 0.0 | 0.0 | 0.0 |
1982 | 4482 | 0.0 | 0.0 | 0.0 |
1983 | 6063 | 0.0 | 0.0 | 0.0 |
1984 | 8574 | 0.0 | 0.0 | 0.0 |
1985 | 4302 | 0.0 | 0.0 | 0.0 |
1986 | 923 | 0.0 | 0.0 | 0.0 |
1987 | 164 | 0.0 | 0.0 | 0.0 |
For data sources see[5]