If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0464122110023 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.983612,"lon":-111.68019,"icon":""}]} |
Location: 02/10-21-046-12W4/3 | |
Location Alias: 02/10-21-46-12 W4M | |
Location Alias 2: 02/10-21-046-12 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 046 | |
Meridian: 4 | |
Range: 12 | |
Section: 21 | |
County/Municipality: Beaver County | |
Well Name: PINE CLIFF KILLAMN 10-21-46-12 | |
Operator Name: Pine Cliff Energy Ltd. | |
License Number: 0058311 | |
License Date: 1976-05-21 | |
License Status: Suspension | |
Spud Date: 1976-07-25 | |
Final Drill Date: 1976-07-26 | |
Well Total Depth: 815.30 m | |
Surface Hole Latitude: 52.983612 | |
Surface Hole Longitude: -111.680190 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1976-05-21 | Obtained License |
1976-07-26 | Finished Drilling |
1976-07-26 | Well Mode changed to Drilled and Cased |
1976-07-27 | Drill Stem Test Performed |
1976-07-28 | Production Casing Operation Performed |
1976-08-13 | Perforation Treatment Performed - Jet Perforation |
1982-07-11 | Perforation Treatment Performed - Jet Perforation |
1988-04-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1988-04-19 | Plug Back Performed |
1988-04-19 | Well Log Performed |
1988-04-20 | Perforation Treatment Performed - Jet Perforation |
1988-05-01 | Well Began Production |
1988-05-01 | Well Fluid changed to Gas |
1988-05-01 | Well Mode changed to Flowing |
1999-03-01 | Well Fluid changed to Gas |
1999-03-01 | Well Mode changed to Suspended |
1999-08-02 | Well Fluid changed to Gas |
1999-08-02 | Well Mode changed to Flowing |
2000-01-01 | Well Fluid changed to Gas |
2000-01-01 | Well Mode changed to Suspended |
2000-09-01 | Well Fluid changed to Gas |
2000-09-01 | Well Mode changed to Flowing |
2001-01-01 | Well Fluid changed to Gas |
2001-01-01 | Well Mode changed to Suspended |
2001-05-14 | Well Fluid changed to Gas |
2001-05-14 | Well Mode changed to Flowing |
2001-08-01 | Well Fluid changed to Gas |
2001-08-01 | Well Mode changed to Suspended |
2008-12-03 | Well Log Performed |
2008-12-05 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1976-08-13 | Perforation | 749.80 | 751.60 | 13 |
1982-07-11 | Perforation | 765.60 | 766.20 | 13 |
1988-04-19 | Packing Device Capped w/Cement | 739.50 | 747.50 | 0 |
1988-04-20 | Perforation | 702.90 | 704.70 | 13 |
1988-04-20 | Perforation | 710.80 | 712.60 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1988 | 3350 | 0.0 | 0.0 | 0.0 |
1989 | 6418 | 0.0 | 0.0 | 0.0 |
1990 | 5431 | 0.0 | 0.0 | 0.0 |
1991 | 7483 | 0.0 | 0.0 | 0.0 |
1992 | 8779 | 0.0 | 0.0 | 0.0 |
1993 | 8686 | 0.0 | 0.0 | 0.0 |
1994 | 6826 | 0.0 | 0.0 | 0.0 |
1995 | 3145 | 0.0 | 0.0 | 0.0 |
1996 | 3048 | 0.0 | 0.0 | 0.0 |
1997 | 3003 | 0.0 | 0.0 | 0.0 |
1999 | 2184 | 0.0 | 0.0 | 0.0 |
2000 | 1464 | 0.0 | 0.0 | 0.0 |
2001 | 744 | 0.0 | 0.0 | 0.0 |
For data sources see[5]