X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0464121412000

Well Details

Well ID: 0464121412000
Loading map...
Location: 00/12-14-046-12W4/0
Location Alias: 00/12-14-46-12 W4M
Location Alias 2: 00/12-14-046-12 W4/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 4
Range: 12
Section: 14
County/Municipality: Beaver County
Well Name: VENTURION OIL KILLAMN 12-14-46-12
Operator Name: Venturion Oil Limited
License Number: 0258596
License Date: 2001-08-15
License Status: Suspension
Spud Date: 2001-08-25
Final Drill Date: 2001-08-26
Well Total Depth: 888.00 m
Surface Hole Latitude: 52.967293
Surface Hole Longitude: -111.643815

For data sources see[1][2]

Well History

Date Event
2001-08-15 Obtained License
2001-08-25 Surface Casing Operation Performed
2001-08-26 Finished Drilling
2001-08-26 Well Log Performed
2001-08-28 Drill Stem Test Performed
2001-08-28 Production Casing Operation Performed
2001-08-28 Rig Released
2001-08-28 Well Mode changed to Drilled and Cased
2001-09-24 Perforation Treatment Performed - Jet Perforation
2001-09-27 Perforation Treatment Performed - Jet Perforation
2001-09-27 Well Log Performed
2001-10-11 Well Began Production
2001-10-11 Well Fluid changed to Gas
2001-10-11 Well Mode changed to Pumping
2002-03-01 Well Fluid changed to Gas
2002-03-01 Well Mode changed to Suspended
2009-12-16 Perforation Treatment Performed - Jet Perforation
2009-12-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-12-20 Plug Back Performed
2009-12-20 Well Fluid changed to Gas
2009-12-20 Well Mode changed to Abandoned Zone
2010-02-04 Well Fluid changed to Gas
2010-02-04 Well Mode changed to Pumping
2018-08-25 Well Fluid changed to Gas
2018-08-25 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-09-24 Perforation 810.00 813.00 14
2009-12-20 Packing Device Capped w/Cement 834.00 842.00 0
2009-12-20 Packing Device Capped w/Cement 794.00 802.00 0
2001-09-27 Perforation 807.00 810.00 14
2001-09-27 Perforation 818.00 820.00 14
2009-12-16 Perforation 860.00 862.00 17
2009-12-16 Perforation 849.00 853.00 17
2009-12-16 Perforation 761.00 766.00 17
2009-12-16 Perforation 756.00 761.00 17
2009-12-16 Perforation 745.00 748.00 17
2009-12-16 Perforation 738.50 742.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 283 0.0 0.0 0.0
2002 5 0.0 0.0 0.0
2010 7640 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 7694 0.0 0.0 0.0
2013 7697 0.0 0.0 0.0
2014 6399 0.0 0.0 0.0
2015 7295 0.0 0.0 0.0
2016 1811 0.0 0.0 0.0

For data sources see[5]

References