If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0464103401A00 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.004119,"lon":-111.360026,"icon":""}]} |
Location: A0/01-34-046-10W4/0 | |
Location Alias: A0/01-34-46-10 W4M | |
Location Alias 2: A0/01-34-046-10 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 046 | |
Meridian: 4 | |
Range: 10 | |
Section: 34 | |
County/Municipality: Municipal District of Wainwright No. 61 | |
Well Name: PINE CLIFF VIK-KINS 1-34-46-10 | |
Operator Name: Cardinal Energy Ltd. | |
License Number: 0133645 | |
License Date: 1988-05-04 | |
License Status: Issued | |
Spud Date: 1988-05-27 | |
Final Drill Date: 1988-05-29 | |
Well Total Depth: 760.00 m | |
Surface Hole Latitude: 53.004119 | |
Surface Hole Longitude: -111.360026 |
Date | Event |
---|---|
1988-05-04 | Obtained License |
1988-05-28 | Surface Casing Operation Performed |
1988-05-29 | Finished Drilling |
1988-05-29 | Well Log Performed |
1988-05-30 | Production Casing Operation Performed |
1988-05-30 | Rig Released |
1988-06-01 | Perforation Treatment Performed - Jet Perforation |
1988-06-01 | Well Log Performed |
1988-06-01 | Well Mode changed to Drilled and Cased |
1989-04-23 | Well Began Production |
1989-04-23 | Well Fluid changed to Crude Oil |
1989-04-23 | Well Mode changed to Flowing |
1990-02-06 | Perforation Treatment Performed - Jet Perforation |
1990-02-06 | Well Log Performed |
1990-02-07 | Perforation Treatment Performed - Fractured |
1990-02-09 | Well Fluid changed to Crude Oil |
1990-02-09 | Well Mode changed to Pumping |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1988-06-01 | Perforation | 719.00 | 720.00 | 13 |
1990-02-06 | Perforation | 717.00 | 720.50 | 13 |
1990-02-07 | Fracture | 717.00 | 720.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1989 | 267 | 0.0 | 0.0 | 0.0 |
1990 | 3473 | 0.0 | 0.0 | 0.0 |
1991 | 6765 | 0.0 | 0.0 | 0.0 |
1992 | 8273 | 0.0 | 0.0 | 0.0 |
1993 | 8601 | 0.0 | 0.0 | 0.0 |
1994 | 8689 | 0.0 | 0.0 | 0.0 |
1995 | 8618 | 0.0 | 0.0 | 0.0 |
1996 | 8766 | 0.0 | 0.0 | 0.0 |
1997 | 8668 | 0.0 | 0.0 | 0.0 |
1998 | 8685 | 0.0 | 0.0 | 0.0 |
1999 | 8759 | 0.0 | 0.0 | 0.0 |
2000 | 8754 | 0.0 | 0.0 | 0.0 |
2001 | 8664 | 0.0 | 0.0 | 0.0 |
2002 | 8704 | 0.0 | 0.0 | 0.0 |
2003 | 8678 | 0.0 | 0.0 | 0.0 |
2004 | 8749 | 0.0 | 0.0 | 0.0 |
2005 | 8593 | 0.0 | 0.0 | 0.0 |
2006 | 8752 | 0.0 | 0.0 | 0.0 |
2007 | 8527 | 0.0 | 0.0 | 0.0 |
2008 | 8235 | 0.0 | 0.0 | 0.0 |
2009 | 8640 | 0.0 | 0.0 | 0.0 |
2010 | 8657 | 0.0 | 0.0 | 0.0 |
2011 | 8729 | 0.0 | 0.0 | 0.0 |
2012 | 8774 | 0.0 | 0.0 | 0.0 |
2013 | 8596 | 0.0 | 0.0 | 0.0 |
2014 | 8745 | 0.0 | 0.0 | 0.0 |
2015 | 8374 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8752 | 0.0 | 0.0 | 0.0 |
2018 | 8679 | 0.0 | 0.0 | 0.0 |
2019 | 8743 | 0.0 | 0.0 | 0.0 |
2020 | 2167 | 0.0 | 0.0 | 0.0 |
For data sources see[5]