X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0464103115003

Well Details

Well ID: 0464103115003
Loading map...
Location: 00/15-31-046-10W4/3
Location Alias: 00/15-31-46-10 W4M
Location Alias 2: 00/15-31-046-10 W4/03
Country: Canada
Province: Alberta
Township: 046
Meridian: 4
Range: 10
Section: 31
County/Municipality: Beaver County
Well Name: PINE CLIFF VIK-KINS 15-31-46-10
Operator Name: Pine Cliff Energy Ltd.
License Number: 0133589
License Date: 1988-05-02
License Status: Amended
Spud Date: 1988-06-13
Final Drill Date: 1988-06-16
Well Total Depth: 860.00 m
Surface Hole Latitude: 53.013917
Surface Hole Longitude: -111.441557

For data sources see[1][2]

Well History

Date Event
1988-05-02 Obtained License
1988-06-14 Surface Casing Operation Performed
1988-06-16 Finished Drilling
1988-06-16 Well Log Performed
1988-06-16 Well Mode changed to Drilled and Cased
1988-06-17 Drill Stem Test Performed
1988-06-18 Production Casing Operation Performed
1988-06-18 Rig Released
2003-11-12 Perforation Treatment Performed - Jet Perforation
2003-11-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-11-14 Perforation Treatment Performed - Jet Perforation
2003-11-14 Plug Back Performed
2003-11-14 Well Log Performed
2011-08-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-08-09 Perforation Treatment Performed - Jet Perforation
2011-08-09 Plug Back Performed
2011-08-09 Well Log Performed
2011-10-24 Well Began Production
2011-10-24 Well Fluid changed to Gas
2011-10-24 Well Mode changed to Flowing
2013-11-01 Well Fluid changed to Gas
2013-11-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-11-12 Perforation 751.50 755.00 20
2003-11-14 Packing Device Capped w/Cement 742.00 750.00 0
2003-11-14 Perforation 733.50 734.50 20
2011-08-09 Packing Device Capped w/Cement 720.00 728.00 0
2011-08-09 Perforation 652.50 654.50 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1646 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8547 0.0 0.0 0.0
2014 8736 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References