X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0464102713022

Well Details

Well ID: 0464102713022
Loading map...
Location: 02/13-27-046-10W4/2
Location Alias: 02/13-27-46-10 W4M
Location Alias 2: 02/13-27-046-10 W4/02
Country: Canada
Province: Alberta
Township: 046
Meridian: 4
Range: 10
Section: 27
County/Municipality: Municipal District of Wainwright No. 61
Well Name: PINE CLIFF VIK-KINS 13-27-46-10
Operator Name: Cardinal Energy Ltd.
License Number: 0133455
License Date: 1988-04-19
License Status: Suspension
Spud Date: 1988-04-25
Final Drill Date: 1988-04-27
Well Total Depth: 823.00 m
Surface Hole Latitude: 53.000499
Surface Hole Longitude: -111.377949

For data sources see[1][2]

Well History

Date Event
1988-04-19 Obtained License
1988-04-26 Surface Casing Operation Performed
1988-04-27 Finished Drilling
1988-04-27 Production Casing Operation Performed
1988-04-27 Rig Released
1988-04-27 Well Log Performed
1988-04-27 Well Mode changed to Drilled and Cased
1988-05-10 Well Log Performed
1988-05-23 Perforation Treatment Performed - Jet Perforation
1988-05-23 Well Log Performed
1988-05-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2017-11-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-11-23 Perforation Treatment Performed - Jet Perforation
2017-11-23 Plug Back Performed
2017-12-07 Perforation Treatment Performed - Fractured
2017-12-20 Well Began Production
2017-12-20 Well Fluid changed to Water
2017-12-20 Well Type changed to Source
2020-02-01 Well Fluid changed to Water
2020-02-01 Well Mode changed to Suspended
2020-02-01 Well Type changed to Source

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-05-23 Perforation 797.00 801.00 13
1988-05-23 Perforation 803.00 806.00 13
1988-05-24 Acid Treatment 797.00 806.00 0
2017-11-23 Packing Device Capped w/Cement 783.80 791.80 0
2017-11-23 Perforation 675.00 693.00 17
2017-12-07 Fracture 675.00 693.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 275 0.0 0.0 0.0
2018 3146 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-11-23 No Incident Encountered 0.00 0.00
2017-12-07 No Incident Encountered 0.00 0.00

For data sources see[6]

References