X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0464060816B00

Well Details

Well ID: 0464060816B00
Loading map...
Location: B0/16-08-046-06W4/0
Location Alias: B0/16-08-46-06 W4M
Location Alias 2: B0/16-08-046-06 W4/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 4
Range: 06
Section: 08
County/Municipality: Municipal District of Wainwright No. 61
Well Name: PRED B0 ET AL WAINWR 16-8-46-6
Operator Name: Cardinal Energy Ltd.
License Number: 0067201
License Date: 1977-12-02
License Status: Abandoned
Spud Date: 1978-01-03
Final Drill Date: 1978-01-05
Well Total Depth: 685.80 m
Surface Hole Latitude: 52.957041
Surface Hole Longitude: -110.830551

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-12-02 Obtained License
1978-01-05 Finished Drilling
1978-01-05 Well Mode changed to Drilled and Cased
1978-01-06 Production Casing Operation Performed
1978-01-16 Perforation Treatment Performed - Jet Perforation
1978-01-17 Perforation Treatment Performed - Fractured
1978-01-25 Well Began Production
1978-01-25 Well Fluid changed to Crude Oil
1978-01-25 Well Mode changed to Pumping
1984-11-29 Well Log Performed
1984-11-30 Well Log Performed
1985-02-03 Well Began Injection
1985-02-03 Well Fluid changed to Water
1985-02-03 Well Type changed to Injection
2007-04-01 Well Fluid changed to Water
2007-04-01 Well Mode changed to Suspended
2007-04-01 Well Type changed to Injection
2009-11-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-11-14 Plug Back Performed
2009-11-14 Well Fluid changed to Water
2009-11-14 Well Mode changed to Abandoned Zone
2009-11-14 Well Type changed to Injection
2016-06-24 Well Abandoned
2016-06-24 Well Fluid changed to Water
2016-06-24 Well Mode changed to Abandoned
2016-06-24 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-01-16 Perforation 652.90 654.10 13
1978-01-16 Perforation 654.70 655.90 13
1978-01-17 Fracture 652.90 655.90 0
2009-11-14 Packing Device Capped w/Cement 636.00 644.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 6281 0.0 0.0 0.0
1979 8344 0.0 0.0 0.0
1980 7778 0.0 0.0 0.0
1981 8717 0.0 0.0 0.0
1982 8671 0.0 0.0 0.0
1983 8607 0.0 0.0 0.0
1984 6377 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0

For data sources see[5]

References