X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0464060808000

Well Details

Well ID: 0464060808000
Loading map...
Location: 00/08-08-046-06W4/0
Location Alias: 00/08-08-46-06 W4M
Location Alias 2: 00/08-08-046-06 W4/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 4
Range: 06
Section: 08
County/Municipality: Municipal District of Wainwright No. 61
Well Name: PRED ET AL WAINWR 8-8-46-6
Operator Name: Cardinal Energy Ltd.
License Number: 0065672
License Date: 1977-09-12
License Status: Suspension
Spud Date: 1977-09-19
Final Drill Date: 1977-09-21
Well Total Depth: 687.30 m
Surface Hole Latitude: 52.949657
Surface Hole Longitude: -110.830538

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-09-12 Obtained License
1977-09-21 Finished Drilling
1977-09-21 Production Casing Operation Performed
1977-09-22 Well Mode changed to Drilled and Cased
1977-09-23 Perforation Treatment Performed - Jet Perforation
1977-10-03 Well Began Production
1977-10-03 Well Fluid changed to Crude Oil
1977-10-03 Well Mode changed to Pumping
1977-11-30 Perforation Treatment Performed - Fractured
1977-11-30 Perforation Treatment Performed - Jet Perforation
1981-10-01 Perforation Treatment Performed - Jet Perforation
1981-10-16 Well Began Injection
1981-10-16 Well Fluid changed to Water
1981-10-16 Well Type changed to Injection
2007-04-01 Well Fluid changed to Water
2007-04-01 Well Mode changed to Suspended
2007-04-01 Well Type changed to Injection
2009-11-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-11-15 Plug Back Performed
2009-11-15 Well Fluid changed to Water
2009-11-15 Well Mode changed to Abandoned Zone
2009-11-15 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-09-23 Perforation 643.70 644.70 13
1977-11-30 Perforation 644.70 646.20 13
1977-11-30 Perforation 650.10 651.70 13
1977-11-30 Fracture 643.70 651.70 0
1981-10-01 Perforation 649.20 652.20 13
2009-11-15 Packing Device Capped w/Cement 621.90 629.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 768 0.0 0.0 0.0
1978 7536 0.0 0.0 0.0
1979 8412 0.0 0.0 0.0
1980 7043 0.0 0.0 0.0
1981 6458 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0

For data sources see[5]

References