X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0464011010002

Well Details

Well ID: 0464011010002
Loading map...
Location: 00/10-10-046-01W4/2
Location Alias: 00/10-10-46-01 W4M
Location Alias 2: 00/10-10-046-01 W4/02
Country: Canada
Province: Alberta
Township: 046
Meridian: 4
Range: 01
Section: 10
County/Municipality: County of Vermilion River
Well Name: ANDERSON DINA 10-10-46-1
Operator Name: Devon Canada Corporation
License Number: 0063892
License Date: 1977-05-18
License Status: RecCertified
Spud Date: 1977-05-24
Final Drill Date: 1977-05-29
Well Total Depth: 649.20 m
Surface Hole Latitude: 52.954765
Surface Hole Longitude: -110.061635

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-05-18 Obtained License
1977-05-29 Drill Stem Test Performed
1977-05-29 Finished Drilling
1977-05-30 Drill Stem Test Performed
1977-05-31 Drill Stem Test Performed
1977-05-31 Production Casing Operation Performed
1977-06-24 Perforation Treatment Performed - Jet Perforation
1977-06-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-06-26 Perforation Treatment Performed - Fractured
1977-08-09 Perforation Treatment Performed - Jet Perforation
1977-08-16 Well Mode changed to Drilled and Cased
2001-05-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-05-25 Plug Back Performed
2001-05-25 Well Mode changed to Abandoned Zone
2001-05-29 Perforation Treatment Performed - Jet Perforation
2001-07-08 Perforation Treatment Performed - Cement Plug
2001-07-08 Perforation Treatment Performed - Remedial Casing
2001-07-09 Well Abandoned
2001-07-09 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-06-24 Perforation 499.30 503.50 7
1977-06-25 Acid Treatment 499.30 503.50 0
1977-06-26 Fracture 499.30 503.50 0
1977-08-09 Perforation 593.10 594.70 13
2001-05-25 Packing Device Capped w/Cement 396.00 581.70 0
2001-05-29 Perforation 230.00 231.00 13
2001-07-08 Remedial Casing Cementing 230.00 231.00 0
2001-07-08 Cement Plug 194.00 231.00 0

For data sources see[4]



References