X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455151108004

Well Details

Well ID: 0455151108004
Loading map...
Location: 00/08-11-045-15W5/4
Location Alias: 00/08-11-45-15 W5M
Location Alias 2: 00/08-11-045-15 W5/04
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 15
Section: 11
County/Municipality: Yellowhead County
Well Name: FAIRBORNE ET AL COLUMBIA 8-11-45-15
Operator Name: Tourmaline Oil Corp.
License Number: 0334975
License Date: 2005-07-21
License Status: Suspension
Spud Date: 2005-08-22
Final Drill Date: 2005-09-03
Well Total Depth: 2100.00 m
Surface Hole Latitude: 52.861134
Surface Hole Longitude: -116.061248

For data sources see[1][2]

Well History

Date Event
2005-07-21 Obtained License
2005-08-23 Surface Casing Operation Performed
2005-08-31 Direction Drilling Operation Performed - Deviate
2005-09-03 Finished Drilling
2005-09-03 Well Mode changed to Drilled and Cased
2005-09-04 Well Log Performed
2005-09-05 Production Casing Operation Performed
2005-09-06 Rig Released
2005-09-21 Well Log Performed
2005-09-22 Perforation Treatment Performed - Jet Perforation
2005-09-22 Well Log Performed
2005-09-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-09-25 Perforation Treatment Performed - Jet Perforation
2005-09-25 Plug Back Performed
2005-09-25 Well Log Performed
2005-09-27 Perforation Treatment Performed - Fractured
2005-09-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-09-29 Plug Back Performed
2005-09-29 Well Log Performed
2005-09-30 Perforation Treatment Performed - Jet Perforation
2005-10-03 Perforation Treatment Performed - Fractured
2007-11-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-11-26 Perforation Treatment Performed - Jet Perforation
2007-11-26 Plug Back Performed
2007-11-26 Well Log Performed
2007-11-28 Perforation Treatment Performed - Fractured
2019-07-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2005-08-31 1650.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-09-22 Perforation 1984.00 1990.00 17
2007-11-26 Perforation 1817.00 1820.00 17
2007-11-28 Fracture 1817.00 1820.00 0
2019-07-19 Packing Device Capped w/Cement 1812.00 1820.00 0
2005-09-25 Packing Device Capped w/Cement 1972.00 1980.00 0
2005-09-25 Perforation 1923.00 1925.50 17
2005-09-27 Fracture 1923.00 1925.50 0
2005-09-29 Packing Device Capped w/Cement 1915.00 1920.00 0
2005-09-30 Perforation 1900.00 1903.00 17
2005-09-30 Perforation 1892.00 1898.00 17
2005-10-03 Fracture 1892.00 1903.00 0
2007-11-26 Packing Device Capped w/Cement 1873.00 1883.00 0

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-07-18 No Incident Encountered 0.00 0.00

For data sources see[6]

References