X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455150103000

Well Details

Well ID: 0455150103000
Loading map...
Location: 00/03-01-045-15W5/0
Location Alias: 00/03-01-45-15 W5M
Location Alias 2: 00/03-01-045-15 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 15
Section: 01
County/Municipality: Yellowhead County
Well Name: FAIRBORNE ET AL BRAZR 3-1-45-15
Operator Name: Tourmaline Oil Corp.
License Number: 0335222
License Date: 2005-07-25
License Status: Suspension
Spud Date: 2005-09-08
Final Drill Date: 2005-09-20
Well Total Depth: 2120.00 m
Surface Hole Latitude: 52.846359
Surface Hole Longitude: -116.050104

For data sources see[1][2]

Well History

Date Event
2005-07-25 Obtained License
2005-09-09 Surface Casing Operation Performed
2005-09-19 Well Log Performed
2005-09-20 Finished Drilling
2005-09-20 Well Mode changed to Drilled and Cased
2005-09-21 Production Casing Operation Performed
2005-09-21 Rig Released
2005-10-11 Well Log Performed
2005-10-12 Perforation Treatment Performed - Jet Perforation
2005-10-12 Well Log Performed
2005-10-14 Perforation Treatment Performed - Fractured
2005-11-14 Well Began Production
2005-11-14 Well Fluid changed to Crude Oil
2005-11-14 Well Mode changed to Pumping
2008-06-17 Well Log Performed
2008-06-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-06-18 Perforation Treatment Performed - Jet Perforation
2008-06-18 Plug Back Performed
2008-06-18 Well Log Performed
2008-06-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-06-26 Plug Back Performed
2008-06-26 Well Log Performed
2013-08-01 Well Fluid changed to Crude Oil
2013-08-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-10-12 Perforation 1963.00 1965.00 17
2005-10-12 Perforation 1967.00 1970.00 17
2005-10-14 Fracture 1963.00 1970.00 0
2008-06-18 Packing Device Capped w/Cement 1943.00 1951.00 0
2008-06-18 Perforation 1798.00 1801.50 17
2008-06-26 Packing Device Capped w/Cement 1782.00 1790.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 622 0.0 0.0 0.0
2006 8036 0.0 0.0 0.0
2007 7854 0.0 0.0 0.0
2008 649 0.0 0.0 0.0

For data sources see[5]

References