If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0455123613000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.914973,"lon":-115.614409,"icon":""}]} |
Location: 00/13-36-045-12W5/0 | |
Location Alias: 00/13-36-45-12 W5M | |
Location Alias 2: 00/13-36-045-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 045 | |
Meridian: 5 | |
Range: 12 | |
Section: 36 | |
County/Municipality: Yellowhead County | |
Well Name: RIDGEBACK PEMBINA 13-36-45-12 | |
Operator Name: Ridgeback Resources Inc. | |
License Number: 0439779 | |
License Date: 2011-11-28 | |
License Status: Issued | |
Spud Date: 2012-01-04 | |
Final Drill Date: 2012-01-15 | |
Well Total Depth: 3777.00 m | |
Surface Hole Latitude: 52.914973 | |
Surface Hole Longitude: -115.614409 |
Date | Event |
---|---|
2011-11-28 | Obtained License |
2012-01-05 | Surface Casing Operation Performed |
2012-01-06 | Well Log Performed |
2012-01-07 | Direction Drilling Operation Performed - Horizontal |
2012-01-09 | Well Log Performed |
2012-01-15 | Finished Drilling |
2012-01-15 | Well Mode changed to Drilled and Cased |
2012-01-18 | Perforation Treatment Performed - Open-Hole Completion |
2012-01-18 | Production Casing Operation Performed |
2012-01-18 | Rig Released |
2012-01-24 | Well Log Performed |
2012-01-30 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-01-31 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-02-01 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-02-02 | Well Began Production |
2012-02-02 | Well Fluid changed to Crude Oil |
2012-02-02 | Well Mode changed to Flowing |
2012-02-04 | Well Log Performed |
2012-03-21 | Well Fluid changed to Crude Oil |
2012-03-21 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-01-04 | Chinook Drilling Inc. | 9 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-01-07 | 1769.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-01-18 | Open Hole/Barefoot Completion | 3772.00 | 3777.00 | 0 |
2012-01-31 | Multi-Stage Fracture | 3153.90 | 3154.00 | 0 |
2012-01-31 | Multi-Stage Fracture | 3080.80 | 3080.90 | 0 |
2012-01-31 | Multi-Stage Fracture | 3007.70 | 3007.80 | 0 |
2012-01-31 | Multi-Stage Fracture | 2933.90 | 2934.00 | 0 |
2012-01-31 | Multi-Stage Fracture | 2860.40 | 2860.50 | 0 |
2012-01-31 | Multi-Stage Fracture | 2786.70 | 2786.80 | 0 |
2012-02-01 | Multi-Stage Fracture | 2713.00 | 2713.10 | 0 |
2012-02-01 | Multi-Stage Fracture | 2639.90 | 2640.00 | 0 |
2012-02-01 | Multi-Stage Fracture | 2566.70 | 2566.80 | 0 |
2012-02-01 | Multi-Stage Fracture | 2493.50 | 2493.60 | 0 |
2012-01-30 | Multi-Stage Fracture | 3749.00 | 3749.10 | 0 |
2012-02-01 | Multi-Stage Fracture | 2419.90 | 2420.00 | 0 |
2012-02-01 | Multi-Stage Fracture | 2346.60 | 2346.70 | 0 |
2012-01-30 | Multi-Stage Fracture | 3679.80 | 3679.90 | 0 |
2012-01-30 | Multi-Stage Fracture | 3606.00 | 3606.10 | 0 |
2012-01-30 | Multi-Stage Fracture | 3521.80 | 3521.90 | 0 |
2012-01-31 | Multi-Stage Fracture | 3448.50 | 3448.60 | 0 |
2012-01-31 | Multi-Stage Fracture | 3374.80 | 3374.90 | 0 |
2012-01-31 | Multi-Stage Fracture | 3301.00 | 3301.10 | 0 |
2012-01-31 | Multi-Stage Fracture | 3227.40 | 3227.50 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 6709 | 0.0 | 0.0 | 0.0 |
2013 | 7760 | 0.0 | 0.0 | 0.0 |
2014 | 8401 | 0.0 | 0.0 | 0.0 |
2015 | 8140 | 0.0 | 0.0 | 0.0 |
2016 | 8715 | 0.0 | 0.0 | 0.0 |
2017 | 8534 | 0.0 | 0.0 | 0.0 |
2018 | 8223 | 0.0 | 0.0 | 0.0 |
2019 | 8669 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[7]