If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0455122613000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.91478,"lon":-115.614721,"icon":""}]} |
Location: 00/13-26-045-12W5/0 | |
Location Alias: 00/13-26-45-12 W5M | |
Location Alias 2: 00/13-26-045-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 045 | |
Meridian: 5 | |
Range: 12 | |
Section: 26 | |
County/Municipality: Yellowhead County | |
Well Name: RIDGEBACK PEMBINA 13-26-45-12 | |
Operator Name: Ridgeback Resources Inc. | |
License Number: 0446162 | |
License Date: 2012-05-29 | |
License Status: Issued | |
Spud Date: 2012-07-03 | |
Final Drill Date: 2012-07-19 | |
Well Total Depth: 3873.50 m | |
Surface Hole Latitude: 52.914780 | |
Surface Hole Longitude: -115.614721 |
Date | Event |
---|---|
2012-05-29 | Obtained License |
2012-07-05 | Surface Casing Operation Performed |
2012-07-05 | Well Log Performed |
2012-07-07 | Direction Drilling Operation Performed - Deviate |
2012-07-08 | Direction Drilling Operation Performed - Horizontal |
2012-07-08 | Well Log Performed |
2012-07-19 | Finished Drilling |
2012-07-19 | Well Log Performed |
2012-07-19 | Well Mode changed to Drilled and Cased |
2012-07-22 | Perforation Treatment Performed - Open-Hole Completion |
2012-07-22 | Production Casing Operation Performed |
2012-07-23 | Rig Released |
2012-08-06 | Well Log Performed |
2012-08-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-08-20 | Well Began Production |
2012-08-20 | Well Fluid changed to Crude Oil |
2012-08-20 | Well Mode changed to Flowing |
2012-08-21 | Well Log Performed |
2016-04-01 | Well Fluid changed to Crude Oil |
2016-04-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-07-03 | Chinook Drilling Inc. | 14 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-07-07 | 1741.00 | Deviate (5 - 79 degrees) |
2012-07-08 | 2339.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-07-22 | Open Hole/Barefoot Completion | 3868.50 | 3873.50 | 0 |
2012-08-18 | Multi-Stage Fracture | 3260.00 | 3260.10 | 0 |
2012-08-18 | Multi-Stage Fracture | 3186.20 | 3186.30 | 0 |
2012-08-18 | Multi-Stage Fracture | 3112.50 | 3112.60 | 0 |
2012-08-18 | Multi-Stage Fracture | 3038.30 | 3038.40 | 0 |
2012-08-18 | Multi-Stage Fracture | 2965.30 | 2965.40 | 0 |
2012-08-18 | Multi-Stage Fracture | 2891.70 | 2891.80 | 0 |
2012-08-18 | Multi-Stage Fracture | 2829.20 | 2829.30 | 0 |
2012-08-18 | Multi-Stage Fracture | 2754.80 | 2754.90 | 0 |
2012-08-18 | Multi-Stage Fracture | 2681.30 | 2681.40 | 0 |
2012-08-18 | Multi-Stage Fracture | 2606.90 | 2607.00 | 0 |
2012-08-18 | Multi-Stage Fracture | 3845.70 | 3845.80 | 0 |
2012-08-18 | Multi-Stage Fracture | 2533.00 | 2533.10 | 0 |
2012-08-18 | Multi-Stage Fracture | 2459.30 | 2459.40 | 0 |
2012-08-18 | Multi-Stage Fracture | 3776.50 | 3776.60 | 0 |
2012-08-18 | Multi-Stage Fracture | 3702.10 | 3702.20 | 0 |
2012-08-18 | Multi-Stage Fracture | 3628.20 | 3628.30 | 0 |
2012-08-18 | Multi-Stage Fracture | 3554.80 | 3554.90 | 0 |
2012-08-18 | Multi-Stage Fracture | 3481.80 | 3481.90 | 0 |
2012-08-18 | Multi-Stage Fracture | 3407.90 | 3408.00 | 0 |
2012-08-18 | Multi-Stage Fracture | 3334.50 | 3334.60 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 2735 | 0.0 | 0.0 | 0.0 |
2013 | 8474 | 0.0 | 0.0 | 0.0 |
2014 | 8619 | 0.0 | 0.0 | 0.0 |
2015 | 8102 | 0.0 | 0.0 | 0.0 |
2016 | 8514 | 0.0 | 0.0 | 0.0 |
2017 | 8728 | 0.0 | 0.0 | 0.0 |
2018 | 8741 | 0.0 | 0.0 | 0.0 |
2019 | 8667 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-07-23 | No Incident Encountered | 0.00 | 0.00 |
2012-08-23 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]