X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455121116000

Well Details

Well ID: 0455121116000
Loading map...
Location: 00/16-11-045-12W5/0
Location Alias: 00/16-11-45-12 W5M
Location Alias 2: 00/16-11-045-12 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 12
Section: 11
County/Municipality: Yellowhead County
Well Name: TORC HZ BRAZR 16-11-45-12
Operator Name: TORC Oil & Gas Ltd.
License Number: 0473062
License Date: 2014-12-12
License Status: Issued
Spud Date: 2015-01-25
Final Drill Date: 2015-02-07
Well Total Depth: 3803.00 m
Surface Hole Latitude: 52.855731
Surface Hole Longitude: -115.624091

For data sources see[1][2]

Well History

Date Event
2014-12-12 Obtained License
2014-12-19 Well Log Performed
2015-01-26 Surface Casing Operation Performed
2015-01-29 Direction Drilling Operation Performed - Deviate
2015-01-31 Intermediate Casing Operation Performed
2015-02-02 Direction Drilling Operation Performed - Horizontal
2015-02-04 Well Log Performed
2015-02-07 Finished Drilling
2015-02-07 Well Log Performed
2015-02-07 Well Mode changed to Drilled and Cased
2015-02-08 Well Log Performed
2015-02-09 Liner Casing Operation Performed
2015-02-10 Rig Released
2015-02-14 Well Log Performed
2015-02-21 Perforation Treatment Performed - Multi-Stage Fracture
2015-02-24 Perforation Treatment Performed - Multi-Stage Fracture
2015-02-25 Perforation Treatment Performed - Multi-Stage Fracture
2015-06-22 Well Began Production
2015-06-22 Well Fluid changed to Crude Oil
2015-06-22 Well Mode changed to Pumping
2017-06-01 Well Fluid changed to Crude Oil
2017-06-01 Well Mode changed to Flowing
2019-05-01 Well Fluid changed to Crude Oil
2019-05-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-01-25 Trinidad Drilling Ltd. 34E N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-01-29 1872.70 Deviate (5 - 79 degrees)
2015-02-02 2345.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-02-21 Multi-Stage Fracture 3775.40 3775.50 0
2015-02-24 Multi-Stage Fracture 3174.10 3174.20 0
2015-02-25 Multi-Stage Fracture 3132.20 3132.30 0
2015-02-25 Multi-Stage Fracture 3103.90 3104.00 0
2015-02-25 Multi-Stage Fracture 3034.90 3035.00 0
2015-02-25 Multi-Stage Fracture 2994.00 2994.10 0
2015-02-25 Multi-Stage Fracture 2952.10 2952.20 0
2015-02-25 Multi-Stage Fracture 2896.70 2896.80 0
2015-02-25 Multi-Stage Fracture 2841.30 2841.40 0
2015-02-25 Multi-Stage Fracture 2785.80 2785.90 0
2015-02-25 Multi-Stage Fracture 2743.90 2744.00 0
2015-02-24 Multi-Stage Fracture 3586.40 3586.50 0
2015-02-25 Multi-Stage Fracture 2688.50 2688.60 0
2015-02-25 Multi-Stage Fracture 2634.10 2634.20 0
2015-02-25 Multi-Stage Fracture 2593.40 2593.50 0
2015-02-25 Multi-Stage Fracture 2470.10 2470.20 0
2015-02-24 Multi-Stage Fracture 3520.40 3520.50 0
2015-02-24 Multi-Stage Fracture 3451.80 3451.90 0
2015-02-24 Multi-Stage Fracture 3409.80 3409.90 0
2015-02-24 Multi-Stage Fracture 3367.90 3368.00 0
2015-02-24 Multi-Stage Fracture 3326.10 3326.20 0
2015-02-24 Multi-Stage Fracture 3284.20 3284.30 0
2015-02-24 Multi-Stage Fracture 3229.60 3229.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-02-21 2015-02-25 2,199 3,042 N/A
2 2015-02-24 2015-02-25 2,199 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 86.8544 N/A
DWP-962 Calfrac Bactericide/Biocide Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) 55566-30-8 100 0.0148 N/A
Water 7732-18-5 100 0.0205 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.0818 N/A
DWP-937 Calfrac Demulsifier Citrus terpenes 94266-47-4 100 0.0894 N/A
Isopropanol 67-63-0 100 0.0941 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0894 N/A
Triethylene glycol 112-27-6 100 0.0941 N/A
Water 7732-18-5 100 0.0902 N/A
DWP-621 Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.1029 N/A
2 30/50 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 4.1571 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 9.265 N/A
Nitrogen Calfrac Energizing Fluid Nitrogen 7727-37-9 100 0.4865 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-02-15 2015-02-24 Groundwater - Non-saline less than or equal to 150m deep 1152
2015-01-30 2015-02-24 Groundwater - Non-saline less than or equal to 150m deep 1223
2015-01-24 2015-02-25 Groundwater - Non-saline less than or equal to 150m deep 892
2015-02-15 2015-02-15 Surface Water - Runoff 238
2015-02-21 2015-02-21 Groundwater - Non-saline less than or equal to 150m deep 82

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 2933 0.0 0.0 0.0
2016 2767 0.0 0.0 0.0
2017 3697 0.0 0.0 0.0
2018 7199 0.0 0.0 0.0
2019 8226 0.0 0.0 0.0
2020 2054 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-02-10 No Incident Encountered 0.00 0.00
2015-03-01 No Incident Encountered 0.00 0.00

For data sources see[10]

References