X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455120101020

Well Details

Well ID: 0455120101020
Loading map...
Location: 02/01-01-045-12W5/0
Location Alias: 02/01-01-45-12 W5M
Location Alias 2: 02/01-01-045-12 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 12
Section: 01
County/Municipality: Yellowhead County
Well Name: WESTBRICK 102 HZ BRAZR 1-1-45-12
Operator Name: Westbrick Energy Ltd.
License Number: 0480521
License Date: 2016-09-28
License Status: Amended
Spud Date: 2017-01-11
Final Drill Date: 2017-01-21
Well Total Depth: 4702.00 m
Surface Hole Latitude: 52.866956
Surface Hole Longitude: -115.599474

For data sources see[1][2]

Well History

Date Event
2016-09-28 Obtained License
2017-01-12 Surface Casing Operation Performed
2017-01-16 Direction Drilling Operation Performed - Deviate
2017-01-17 Direction Drilling Operation Performed - Horizontal
2017-01-17 Intermediate Casing Operation Performed
2017-01-17 Well Log Performed
2017-01-21 Finished Drilling
2017-01-21 Well Log Performed
2017-01-21 Well Mode changed to Drilled and Cased
2017-01-23 Liner Casing Operation Performed
2017-01-23 Perforation Treatment Performed - Open-Hole Completion
2017-01-24 Rig Released
2017-02-19 Perforation Treatment Performed - Multi-Stage Fracture
2017-02-20 Perforation Treatment Performed - Multi-Stage Fracture
2017-03-20 Well Began Production
2017-03-20 Well Fluid changed to Gas
2017-03-20 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-01-11 Nabors Drilling Limited 8 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-01-16 2291.60 Deviate (5 - 79 degrees)
2017-01-17 2742.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-01-23 Open Hole/Barefoot Completion 4628.00 4702.00 0
2017-02-20 Multi-Stage Fracture 3970.60 3971.40 0
2017-02-20 Multi-Stage Fracture 3899.30 3900.10 0
2017-02-20 Multi-Stage Fracture 3817.30 3818.10 0
2017-02-20 Multi-Stage Fracture 3748.20 3749.00 0
2017-02-20 Multi-Stage Fracture 3665.40 3666.30 0
2017-02-20 Multi-Stage Fracture 3593.60 3594.50 0
2017-02-20 Multi-Stage Fracture 3509.40 3510.30 0
2017-02-20 Multi-Stage Fracture 3439.20 3440.00 0
2017-02-20 Multi-Stage Fracture 3367.30 3368.10 0
2017-02-20 Multi-Stage Fracture 3282.60 3283.50 0
2017-02-19 Multi-Stage Fracture 4591.70 4591.80 0
2017-02-20 Multi-Stage Fracture 3210.80 3211.70 0
2017-02-20 Multi-Stage Fracture 3125.90 3126.70 0
2017-02-20 Multi-Stage Fracture 3054.50 3055.30 0
2017-02-20 Multi-Stage Fracture 2982.70 2983.50 0
2017-02-20 Multi-Stage Fracture 2897.50 2898.30 0
2017-02-20 Multi-Stage Fracture 2827.00 2827.80 0
2017-02-19 Multi-Stage Fracture 4516.60 4517.40 0
2017-02-19 Multi-Stage Fracture 4431.40 4432.30 0
2017-02-19 Multi-Stage Fracture 4363.70 4364.60 0
2017-02-19 Multi-Stage Fracture 4280.20 4281.20 0
2017-02-20 Multi-Stage Fracture 4208.70 4209.50 0
2017-02-20 Multi-Stage Fracture 4124.60 4125.50 0
2017-02-20 Multi-Stage Fracture 4054.20 4055.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-02-19 2017-02-20 2,632 5,573 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 84.9946 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 3.6448 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 8.952 N/A
SBExcel 20/40 Trican silica crystalline 14808-60-7 100 2.0839 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.01 N/A
2-mercaptoethanol 60-24-2 100 0.01 N/A
dibromoacetonitrile 3252-43-5 100 0.01 N/A
non-hazardous ingredients Not Available 100 0.01 N/A
sodium bromide 7647-15-6 100 0.01 N/A
GBO-1 Trican Breaker sodium perborate tetrahydrate 10486-00-7 100 0.0084 N/A
CC-8 Trican Clay Control choline chloride 67-48-1 100 0.1589 N/A
non-hazardous ingredients Not Available 100 0.1589 N/A
GNE-2 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0431 N/A
propylene glycol 57-55-6 100 0.0431 N/A
FR-18 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.087 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.087 N/A
non-hazardous ingredients Not Available 100 0.087 N/A
SI-14 Trican Scale Inhibitor methanol 67-56-1 100 0.0167 N/A
non-hazardous ingredients Not Available 100 0.0167 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-01-21 2017-02-22 Surface Water - Lake 5574

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 6414 0.0 0.0 0.0
2018 4895 0.0 0.0 0.0
2019 5303 0.0 0.0 0.0
2020 1920 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-01-24 No Incident Encountered 0.00 0.00
2017-03-03 No Incident Encountered 0.00 0.00

For data sources see[10]

References