If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0455113309000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.926898,"lon":-115.552155,"icon":""}]} |
Location: 00/09-33-045-11W5/0 | |
Location Alias: 00/09-33-45-11 W5M | |
Location Alias 2: 00/09-33-045-11 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 045 | |
Meridian: 5 | |
Range: 11 | |
Section: 33 | |
County/Municipality: Brazeau County | |
Well Name: RIDGEBACK PEMBINA 9-33-45-11 | |
Operator Name: Ridgeback Resources Inc. | |
License Number: 0449615 | |
License Date: 2012-10-30 | |
License Status: Issued | |
Spud Date: 2012-12-04 | |
Final Drill Date: 2012-12-15 | |
Well Total Depth: 3647.00 m | |
Surface Hole Latitude: 52.926898 | |
Surface Hole Longitude: -115.552155 |
Date | Event |
---|---|
2012-10-30 | Obtained License |
2012-12-04 | Lost Circulation Occurred |
2012-12-07 | Surface Casing Operation Performed |
2012-12-07 | Well Log Performed |
2012-12-08 | Direction Drilling Operation Performed - Deviate |
2012-12-10 | Direction Drilling Operation Performed - Horizontal |
2012-12-15 | Finished Drilling |
2012-12-15 | Well Log Performed |
2012-12-15 | Well Mode changed to Drilled and Cased |
2012-12-17 | Perforation Treatment Performed - Open-Hole Completion |
2012-12-17 | Production Casing Operation Performed |
2012-12-17 | Rig Released |
2013-01-02 | Well Log Performed |
2013-01-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-01-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-01-11 | Well Began Production |
2013-01-11 | Well Fluid changed to Crude Oil |
2013-01-11 | Well Mode changed to Flowing |
2013-04-02 | Well Fluid changed to Crude Oil |
2013-04-02 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-12-04 | Precision Drilling Corporation | 309 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-12-08 | 1666.00 | Deviate (5 - 79 degrees) |
2012-12-10 | 2197.40 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-12-17 | Open Hole/Barefoot Completion | 3643.00 | 3647.00 | 0 |
2013-01-10 | Multi-Stage Fracture | 3074.10 | 3074.20 | 0 |
2013-01-10 | Multi-Stage Fracture | 2997.30 | 2997.40 | 0 |
2013-01-10 | Multi-Stage Fracture | 2935.20 | 2935.30 | 0 |
2013-01-10 | Multi-Stage Fracture | 2859.80 | 2859.90 | 0 |
2013-01-10 | Multi-Stage Fracture | 2798.10 | 2798.20 | 0 |
2013-01-11 | Multi-Stage Fracture | 2726.10 | 2726.20 | 0 |
2013-01-11 | Multi-Stage Fracture | 2654.00 | 2654.10 | 0 |
2013-01-11 | Multi-Stage Fracture | 2593.80 | 2593.90 | 0 |
2013-01-11 | Multi-Stage Fracture | 2517.50 | 2517.60 | 0 |
2013-01-11 | Multi-Stage Fracture | 2455.10 | 2455.20 | 0 |
2013-01-10 | Multi-Stage Fracture | 3617.40 | 3617.50 | 0 |
2013-01-11 | Multi-Stage Fracture | 2393.10 | 2393.20 | 0 |
2013-01-11 | Multi-Stage Fracture | 2316.50 | 2316.60 | 0 |
2013-01-10 | Multi-Stage Fracture | 3548.50 | 3548.60 | 0 |
2013-01-10 | Multi-Stage Fracture | 3473.50 | 3473.60 | 0 |
2013-01-10 | Multi-Stage Fracture | 3413.20 | 3413.30 | 0 |
2013-01-10 | Multi-Stage Fracture | 3336.90 | 3337.00 | 0 |
2013-01-10 | Multi-Stage Fracture | 3274.60 | 3274.70 | 0 |
2013-01-10 | Multi-Stage Fracture | 3213.20 | 3213.30 | 0 |
2013-01-10 | Multi-Stage Fracture | 3136.40 | 3136.50 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-01-10 | 2013-01-11 | 2,037 | 2,575 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 86.5245 | N/A | |||
20/40 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 5.7196 | N/A | ||
30/50 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 8.3099 | N/A | ||
Tolcide PS75LT | Calfrac | Bactericide/Biocide | Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) | 55566-30-8 | 100 | 0.0128 | N/A | |
Water | 7732-18-5 | 100 | 0.0137 | N/A | ||||
DWP-913 | Calfrac | Clay Control | Non-Hazardous Ingredients | Trade Secret | 100 | 0.1959 | N/A | |
DWP-949 | Calfrac | Demulsifier | Ethoxylated alcohols | 8300 | 100 | 0.0913 | N/A | |
Ethoxylated phenolic resin | 8300 | 100 | 0.0941 | N/A | ||||
Isobutyl ketone | 8300 | 100 | 0.0913 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.1189 | N/A | ||||
Organic acid salts 1 | 8300 | 100 | 0.0913 | N/A | ||||
Organic acid salts 2 | 8300 | 100 | 0.0932 | N/A | ||||
Organic acid salts 3 | 8300 | 100 | 0.0941 | N/A | ||||
Nitrogen | Calfrac | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 0.0766 | N/A | |
DWP-621 | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0663 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2013-01-03 | 2013-01-05 | Surface Water - Runoff | 2630 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 6957 | 0.0 | 0.0 | 0.0 |
2014 | 8178 | 0.0 | 0.0 | 0.0 |
2015 | 8487 | 0.0 | 0.0 | 0.0 |
2016 | 8601 | 0.0 | 0.0 | 0.0 |
2017 | 8726 | 0.0 | 0.0 | 0.0 |
2018 | 8703 | 0.0 | 0.0 | 0.0 |
2019 | 8595 | 0.0 | 0.0 | 0.0 |
2020 | 2122 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-12-04 | Lost Circulation | 80.00 | 150.00 |
2013-01-20 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]