X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455112808000

Well Details

Well ID: 0455112808000
Loading map...
Location: 00/08-28-045-11W5/0
Location Alias: 00/08-28-45-11 W5M
Location Alias 2: 00/08-28-045-11 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 11
Section: 28
County/Municipality: Brazeau County
Well Name: RIDGEBACK PEMBINA 8-28-45-11
Operator Name: Ridgeback Resources Inc.
License Number: 0441562
License Date: 2011-12-16
License Status: Issued
Spud Date: 2012-02-22
Final Drill Date: 2012-03-04
Well Total Depth: 3643.00 m
Surface Hole Latitude: 52.905379
Surface Hole Longitude: -115.551483

For data sources see[1][2]

Well History

Date Event
2011-12-16 Obtained License
2012-02-17 Well Log Performed
2012-02-24 Surface Casing Operation Performed
2012-02-27 Direction Drilling Operation Performed - Horizontal
2012-02-28 Well Log Performed
2012-03-04 Finished Drilling
2012-03-04 Well Log Performed
2012-03-04 Well Mode changed to Drilled and Cased
2012-03-05 Well Log Performed
2012-03-06 Perforation Treatment Performed - Open-Hole Completion
2012-03-06 Production Casing Operation Performed
2012-03-07 Rig Released
2012-03-16 Well Log Performed
2012-03-21 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-22 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-23 Well Began Production
2012-03-23 Well Fluid changed to Crude Oil
2012-03-23 Well Mode changed to Flowing
2012-11-22 Well Fluid changed to Crude Oil
2012-11-22 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-02-22 Chinook Drilling Inc. 9 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-02-27 1727.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-03-06 Open Hole/Barefoot Completion 3642.00 3643.00 0
2012-03-21 Multi-Stage Fracture 3062.50 3062.60 0
2012-03-21 Multi-Stage Fracture 3001.40 3001.50 0
2012-03-21 Multi-Stage Fracture 2939.10 2939.20 0
2012-03-21 Multi-Stage Fracture 2864.70 2864.80 0
2012-03-22 Multi-Stage Fracture 2803.40 2803.50 0
2012-03-22 Multi-Stage Fracture 2729.80 2729.90 0
2012-03-22 Multi-Stage Fracture 2658.80 2658.90 0
2012-03-22 Multi-Stage Fracture 2601.70 2601.80 0
2012-03-22 Multi-Stage Fracture 2525.50 2525.60 0
2012-03-22 Multi-Stage Fracture 2466.30 2466.40 0
2012-03-21 Multi-Stage Fracture 3616.00 3616.10 0
2012-03-22 Multi-Stage Fracture 2392.10 2392.20 0
2012-03-22 Multi-Stage Fracture 2320.30 2320.40 0
2012-03-21 Multi-Stage Fracture 3547.70 3547.80 0
2012-03-21 Multi-Stage Fracture 3470.80 3470.90 0
2012-03-21 Multi-Stage Fracture 3401.70 3401.80 0
2012-03-21 Multi-Stage Fracture 3339.20 3339.30 0
2012-03-21 Multi-Stage Fracture 3277.20 3277.30 0
2012-03-21 Multi-Stage Fracture 3207.20 3207.30 0
2012-03-21 Multi-Stage Fracture 3137.20 3137.30 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 4293 0.0 0.0 0.0
2013 7530 0.0 0.0 0.0
2014 7956 0.0 0.0 0.0
2015 8344 0.0 0.0 0.0
2016 8668 0.0 0.0 0.0
2017 8663 0.0 0.0 0.0
2018 8688 0.0 0.0 0.0
2019 8613 0.0 0.0 0.0
2020 2158 0.0 0.0 0.0

For data sources see[7]

References