X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455110604000

Well Details

Well ID: 0455110604000
Loading map...
Location: 00/04-06-045-11W5/0
Location Alias: 00/04-06-45-11 W5M
Location Alias 2: 00/04-06-045-11 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 11
Section: 06
County/Municipality: Brazeau County
Well Name: WESTBRICK HZ BRAZR 4-6-45-11
Operator Name: Westbrick Energy Ltd.
License Number: 0479951
License Date: 2016-07-22
License Status: Amended
Spud Date: 2016-09-23
Final Drill Date: 2016-10-06
Well Total Depth: 5012.00 m
Surface Hole Latitude: 52.866697
Surface Hole Longitude: -115.586780

For data sources see[1][2]

Well History

Date Event
2016-07-22 Obtained License
2016-09-25 Surface Casing Operation Performed
2016-09-30 Direction Drilling Operation Performed - Deviate
2016-09-30 Direction Drilling Operation Performed - Horizontal
2016-09-30 Well Log Performed
2016-10-01 Intermediate Casing Operation Performed
2016-10-06 Finished Drilling
2016-10-06 Well Log Performed
2016-10-06 Well Mode changed to Drilled and Cased
2016-10-08 Production Casing Operation Performed
2016-10-09 Perforation Treatment Performed - Open-Hole Completion
2016-10-09 Rig Released
2016-11-01 Well Began Production
2016-11-01 Well Fluid changed to Gas
2016-11-01 Well Mode changed to Flowing
2016-11-02 Perforation Treatment Performed - Multi-Stage Fracture
2016-11-03 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-09-23 Nabors Drilling Limited 8 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-09-30 2321.80 Deviate (5 - 79 degrees)
2016-09-30 2715.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-10-09 Open Hole/Barefoot Completion 4929.00 5012.00 0
2016-11-02 Multi-Stage Fracture 4407.40 4407.60 0
2016-11-02 Multi-Stage Fracture 4338.90 4339.10 0
2016-11-02 Multi-Stage Fracture 4270.40 4270.60 0
2016-11-02 Multi-Stage Fracture 4202.00 4202.20 0
2016-11-02 Multi-Stage Fracture 4133.60 4133.80 0
2016-11-02 Multi-Stage Fracture 4065.70 4065.90 0
2016-11-02 Multi-Stage Fracture 3997.20 3997.40 0
2016-11-02 Multi-Stage Fracture 3928.70 3928.90 0
2016-11-02 Multi-Stage Fracture 3860.80 3860.90 0
2016-11-02 Multi-Stage Fracture 3792.20 3792.40 0
2016-11-02 Multi-Stage Fracture 4919.70 4919.90 0
2016-11-02 Multi-Stage Fracture 3723.90 3724.10 0
2016-11-02 Multi-Stage Fracture 3655.30 3655.50 0
2016-11-02 Multi-Stage Fracture 3586.70 3586.90 0
2016-11-03 Multi-Stage Fracture 3518.20 3518.40 0
2016-11-03 Multi-Stage Fracture 3449.70 3449.90 0
2016-11-03 Multi-Stage Fracture 3381.10 3381.30 0
2016-11-03 Multi-Stage Fracture 3312.50 3312.70 0
2016-11-03 Multi-Stage Fracture 3244.00 3244.20 0
2016-11-03 Multi-Stage Fracture 3175.60 3175.80 0
2016-11-03 Multi-Stage Fracture 3107.10 3107.30 0
2016-11-02 Multi-Stage Fracture 4871.80 4872.00 0
2016-11-03 Multi-Stage Fracture 3038.50 3038.70 0
2016-11-03 Multi-Stage Fracture 2970.10 2970.30 0
2016-11-03 Multi-Stage Fracture 2901.80 2902.00 0
2016-11-03 Multi-Stage Fracture 2833.20 2833.40 0
2016-11-02 Multi-Stage Fracture 4803.50 4803.70 0
2016-11-02 Multi-Stage Fracture 4748.30 4748.50 0
2016-11-02 Multi-Stage Fracture 4679.80 4680.00 0
2016-11-02 Multi-Stage Fracture 4611.60 4611.80 0
2016-11-02 Multi-Stage Fracture 4530.40 4530.60 0
2016-11-02 Multi-Stage Fracture 4475.60 4475.80 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-11-02 2016-11-03 2,633 8,352 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 86.6372 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 3.329 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 8.062 N/A
SBExcel 20/40 Trican silica crystalline 14808-60-7 100 1.6993 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0102 N/A
2-mercaptoethanol 60-24-2 100 0.0102 N/A
dibromoacetonitrile 3252-43-5 100 0.0102 N/A
non-hazardous ingredients Not Available 100 0.0102 N/A
sodium bromide 7647-15-6 100 0.0102 N/A
GBO-1 Trican Breaker sodium perborate tetrahydrate 10486-00-7 100 0.0086 N/A
CC-8 Trican Clay Control choline chloride 67-48-1 100 0.162 N/A
non-hazardous ingredients Not Available 100 0.162 N/A
GNE-2 Trican Demulsifier non-hazardous ingredients Not Available 100 0.044 N/A
propylene glycol 57-55-6 100 0.044 N/A
GFR-5D Trican Friction Reducer anionic polyacrylamide Not Available 100 0.0302 N/A
SI-14 Trican Scale Inhibitor methanol 67-56-1 100 0.017 N/A
non-hazardous ingredients Not Available 100 0.017 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-10-06 2016-10-07 Surface Water - Lake 4998
2016-10-14 2016-10-15 Surface Water - Lake 5477

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 1464 0.0 0.0 0.0
2017 6600 0.0 0.0 0.0
2018 4727 0.0 0.0 0.0
2019 4559 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-10-06 No Incident Encountered 0.00 0.00
2016-11-08 No Incident Encountered 0.00 0.00

For data sources see[10]

References