X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455102404000

Well Details

Well ID: 0455102404000
Loading map...
Location: 00/04-24-045-10W5/0
Location Alias: 00/04-24-45-10 W5M
Location Alias 2: 00/04-24-045-10 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 10
Section: 24
County/Municipality: Brazeau County
Well Name: CVE PEMBINA 4-24-45-10
Operator Name: Cenovus Energy Inc.
License Number: 0449967
License Date: 2012-11-09
License Status: Issued
Spud Date: 2012-12-15
Final Drill Date: 2013-01-07
Well Total Depth: 5067.00 m
Surface Hole Latitude: 52.889248
Surface Hole Longitude: -115.284045

For data sources see[1][2]

Well History

Date Event
2012-11-09 Obtained License
2012-12-17 Surface Casing Operation Performed
2012-12-21 Direction Drilling Operation Performed - Deviate
2012-12-23 Direction Drilling Operation Performed - Horizontal
2012-12-24 Intermediate Casing Operation Performed
2012-12-24 Well Log Performed
2012-12-28 Well Log Performed
2013-01-07 Finished Drilling
2013-01-07 Well Log Performed
2013-01-07 Well Mode changed to Drilled and Cased
2013-01-09 Liner Casing Operation Performed
2013-01-09 Perforation Treatment Performed - Open-Hole Completion
2013-01-11 Rig Released
2013-02-15 Perforation Treatment Performed - Multi-Stage Fracture
2013-04-02 Well Began Production
2013-04-02 Well Fluid changed to Gas
2013-04-02 Well Mode changed to Flowing
2017-09-21 Well Fluid changed to Gas
2017-09-21 Well Mode changed to Pumping
2017-10-03 Well Log Performed

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-12-15 Precision Drilling Corporation 391 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-12-21 2000.10 Deviate (5 - 79 degrees)
2012-12-23 2385.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-01-09 Open Hole/Barefoot Completion 5060.00 5067.00 0
2013-02-15 Multi-Stage Fracture 4002.70 4003.20 0
2013-02-15 Multi-Stage Fracture 3882.50 3883.00 0
2013-02-15 Multi-Stage Fracture 3747.70 3748.20 0
2013-02-15 Multi-Stage Fracture 3626.90 3627.40 0
2013-02-15 Multi-Stage Fracture 3493.00 3493.50 0
2013-02-15 Multi-Stage Fracture 3358.00 3358.50 0
2013-02-15 Multi-Stage Fracture 3236.10 3236.60 0
2013-02-15 Multi-Stage Fracture 3100.30 3100.80 0
2013-02-15 Multi-Stage Fracture 2979.80 2980.30 0
2013-02-15 Multi-Stage Fracture 2844.80 2845.20 0
2013-02-15 Multi-Stage Fracture 5035.60 5036.70 0
2013-02-15 Multi-Stage Fracture 2723.80 2724.30 0
2013-02-15 Multi-Stage Fracture 2588.70 2589.20 0
2013-02-15 Multi-Stage Fracture 2467.20 2467.70 0
2013-02-15 Multi-Stage Fracture 4912.90 4913.40 0
2013-02-15 Multi-Stage Fracture 4777.20 4777.70 0
2013-02-15 Multi-Stage Fracture 4644.50 4645.00 0
2013-02-15 Multi-Stage Fracture 4524.40 4524.90 0
2013-02-15 Multi-Stage Fracture 4392.10 4392.60 0
2013-02-15 Multi-Stage Fracture 4271.70 4272.20 0
2013-02-15 Multi-Stage Fracture 4137.40 4137.90 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-02-15 2013-02-15 2,305 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water (Including Mix Water Supplied by Client)* Not Available 100 74.9548 N/A
YF125FLEX; N002 Schlumberger Crystalline silica 14808-60-7 100 19.6251 N/A
YF125FLEX; N002 Schlumberger Energizing Fluid 2-methyl-2h-isothiazol-3-one 2682-20-4 100 0 N/A
5-chloro-2-methyl-2h-isothiazolol-3-one 26172-55-4 100 0.0001 N/A
Cristobalite 14464-46-1 100 0 N/A
Diammonium peroxidisulphate 7727-54-0 100 0.0145 N/A
Diatomaceous earth; calcined 91053-39-3 100 0.0014 N/A
Dicoco dimethyl quaternary ammonium chloride 61789-77-3 100 0.0003 N/A
Glycerol 56-81-5 100 0.0196 N/A
Guar gum 9000-30-0 100 0.1428 N/A
Magnesium chloride 7786-30-3 100 0.0001 N/A
Magnesium nitrate 10377-60-3 100 0.0002 N/A
Magnesium silicate hydrate (talc) 14807-96-6 100 0.0001 N/A
Nitrogen; liquid form 7727-37-9 100 5.0652 N/A
Non-crystalline silica 7631-86-9 100 0.0003 N/A
Polyethylene glycol monohexyl ether 31726-34-8 100 0.0088 N/A
Potassium borate 1332-77-0 100 0.0601 N/A
Potassium hydroxide 1310-58-3 100 0.0222 N/A
Propan-2-ol 67-63-0 100 0 N/A
Tetramethylammonium chloride 75-57-0 100 0.0783 N/A
Vinylidene chloride/methylacrylate copolymer 25038-72-6 100 0.0059 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-02-25 2013-03-07 Surface Water - River 3235

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 6383 0.0 0.0 0.0
2014 8219 0.0 0.0 0.0
2015 8690 0.0 0.0 0.0
2016 8578 0.0 0.0 0.0
2017 8728 0.0 0.0 0.0
2018 8611 0.0 0.0 0.0
2019 8679 0.0 0.0 0.0
2020 2094 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-01-11 No Incident Encountered 0.00 0.00
2013-03-12 No Incident Encountered 0.00 0.00

For data sources see[10]

References