X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455100614000

Well Details

Well ID: 0455100614000
Loading map...
Location: 00/14-06-045-10W5/0
Location Alias: 00/14-06-45-10 W5M
Location Alias 2: 00/14-06-045-10 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 10
Section: 06
County/Municipality: O'Chiese 203
Well Name: BELLATRIX HZ PEMBINA 14-6-45-10
Operator Name: Bellatrix Exploration Ltd.
License Number: 0445852
License Date: 2012-05-14
License Status: Issued
Spud Date: 2012-08-02
Final Drill Date: 2012-08-17
Well Total Depth: 3341.50 m
Surface Hole Latitude: 52.844036
Surface Hole Longitude: -115.445686

For data sources see[1][2]

Well History

Date Event
2012-05-14 Obtained License
2012-08-05 Surface Casing Operation Performed
2012-08-08 Direction Drilling Operation Performed - Deviate
2012-08-12 Intermediate Casing Operation Performed
2012-08-13 Well Log Performed
2012-08-14 Direction Drilling Operation Performed - Horizontal
2012-08-17 Finished Drilling
2012-08-17 Well Mode changed to Drilled and Cased
2012-08-19 Liner Casing Operation Performed
2012-08-20 Rig Released
2012-08-29 Perforation Treatment Performed - Multi-Stage Fracture
2012-09-17 Well Began Production
2012-09-17 Well Fluid changed to Crude Oil
2012-09-17 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-08-03 Chinook Drilling Inc. 7 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-08-08 1662.00 Deviate (5 - 79 degrees)
2012-08-14 2215.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-08-29 Multi-Stage Fracture 3313.20 3313.30 0
2012-08-29 Multi-Stage Fracture 2600.60 2600.70 0
2012-08-29 Multi-Stage Fracture 2528.70 2528.80 0
2012-08-29 Multi-Stage Fracture 2443.80 2443.90 0
2012-08-29 Multi-Stage Fracture 2371.70 2371.80 0
2012-08-29 Multi-Stage Fracture 2300.60 2300.70 0
2012-08-29 Multi-Stage Fracture 2216.80 2216.90 0
2012-08-29 Multi-Stage Fracture 3234.10 3234.20 0
2012-08-29 Multi-Stage Fracture 3161.50 3161.60 0
2012-08-29 Multi-Stage Fracture 3075.40 3075.50 0
2012-08-29 Multi-Stage Fracture 3002.80 3002.90 0
2012-08-29 Multi-Stage Fracture 2930.20 2930.30 0
2012-08-29 Multi-Stage Fracture 2844.20 2844.30 0
2012-08-29 Multi-Stage Fracture 2771.40 2771.50 0
2012-08-29 Multi-Stage Fracture 2685.30 2685.40 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 2441 0.0 0.0 0.0
2013 8733 0.0 0.0 0.0
2014 8601 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8529 0.0 0.0 0.0
2019 8525 0.0 0.0 0.0
2020 2123 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-20 No Incident Encountered 0.00 0.00
2012-08-29 No Incident Encountered 0.00 0.00

For data sources see[8]

References