X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455093402000

Well Details

Well ID: 0455093402000
Loading map...
Location: 00/02-34-045-09W5/0
Location Alias: 00/02-34-45-09 W5M
Location Alias 2: 00/02-34-045-09 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 09
Section: 34
County/Municipality: Clearwater County
Well Name: COPOL ET AL 100 HZ PEMBINA 2-34-45-9
Operator Name: Bellatrix Exploration Ltd.
License Number: 0438022
License Date: 2011-10-26
License Status: Issued
Spud Date: 2011-11-04
Final Drill Date: 2011-11-15
Well Total Depth: 3135.00 m
Surface Hole Latitude: 52.927246
Surface Hole Longitude: -115.212727

For data sources see[1][2]

Well History

Date Event
2011-10-26 Obtained License
2011-11-05 Surface Casing Operation Performed
2011-11-09 Direction Drilling Operation Performed - Horizontal
2011-11-10 Well Log Performed
2011-11-12 Intermediate Casing Operation Performed
2011-11-12 Well Log Performed
2011-11-13 Lost Circulation Occurred
2011-11-15 Finished Drilling
2011-11-15 Well Log Performed
2011-11-15 Well Mode changed to Drilled and Cased
2011-11-16 Liner Casing Operation Performed
2011-11-16 Perforation Treatment Performed - Open-Hole Completion
2011-11-17 Rig Released
2011-12-03 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-04 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-04 Well Fluid changed to Gas
2011-12-04 Well Mode changed to Testing
2011-12-08 Well Fluid changed to Gas
2011-12-08 Well Mode changed to Test Completed
2012-01-25 Well Began Production
2012-01-25 Well Fluid changed to Gas
2012-01-25 Well Mode changed to Flowing
2014-04-08 Well Fluid changed to Gas
2014-04-08 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-11-09 1859.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-11-16 Open Hole/Barefoot Completion 3130.00 3135.00 0
2011-12-03 Multi-Stage Fracture 3106.30 3107.30 0
2011-12-03 Multi-Stage Fracture 3105.80 3106.30 0
2011-12-03 Multi-Stage Fracture 2982.40 2982.90 0
2011-12-03 Multi-Stage Fracture 2846.60 2847.10 0
2011-12-03 Multi-Stage Fracture 2725.60 2726.10 0
2011-12-03 Multi-Stage Fracture 2591.00 2591.50 0
2011-12-04 Multi-Stage Fracture 2455.30 2455.80 0
2011-12-04 Multi-Stage Fracture 2339.00 2339.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 41 0.0 0.0 0.0
2012 8057 0.0 0.0 0.0
2013 6171 0.0 0.0 0.0
2014 7075 0.0 0.0 0.0
2015 6551 0.0 0.0 0.0
2016 8424 0.0 0.0 0.0
2017 8736 0.0 0.0 0.0
2018 7847 0.0 0.0 0.0
2019 6931 0.0 0.0 0.0
2020 2112 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2011-11-13 Lost Circulation 2585.00 2643.00

For data sources see[7]

References