X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455092906000

Well Details

Well ID: 0455092906000
Loading map...
Location: 00/06-29-045-09W5/0
Location Alias: 00/06-29-45-09 W5M
Location Alias 2: 00/06-29-045-09 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 09
Section: 29
County/Municipality: Brazeau County
Well Name: CVE PEMBINA 6-29-45-9
Operator Name: Cenovus Energy Inc.
License Number: 0060868
License Date: 1976-10-28
License Status: Suspension
Spud Date: 1976-11-07
Final Drill Date: 1976-12-01
Well Total Depth: 2493.00 m
Surface Hole Latitude: 52.906124
Surface Hole Longitude: -115.275895

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-10-28 Obtained License
1976-11-08 Lost Circulation Occurred
1976-12-01 Finished Drilling
1976-12-01 Well Mode changed to Drilled and Cased
1976-12-03 Drill Stem Test Performed
1976-12-05 Production Casing Operation Performed
1976-12-18 Perforation Treatment Performed - Jet Perforation
1976-12-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-12-29 Perforation Treatment Performed - Cement Squeeze
1977-01-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-01-03 Perforation Treatment Performed - Jet Perforation
1977-01-04 Perforation Treatment Performed - Fractured
1977-01-06 Well Began Production
1977-01-06 Well Fluid changed to Crude Oil
1977-01-06 Well Mode changed to Pumping
1977-03-11 Well Fluid changed to Crude Oil
1977-03-11 Well Mode changed to Suspended
1984-11-03 Well Fluid changed to Crude Oil
1984-11-03 Well Mode changed to Pumping
1986-01-01 Well Fluid changed to Crude Oil
1986-01-01 Well Mode changed to Suspended
1986-01-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-01-19 Perforation Treatment Performed - Jet Perforation
1986-01-19 Plug Back Performed
1986-01-19 Well Fluid changed to Crude Oil
1986-01-19 Well Mode changed to Abandoned Zone
1986-01-20 Perforation Treatment Performed - Remedial Casing
1986-01-21 Perforation Treatment Performed - Jet Perforation
1986-01-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-01-24 Perforation Treatment Performed - Fractured
1990-02-20 Perforation Treatment Performed - Cement Squeeze
1990-02-20 Plug Back Performed
1990-02-22 Perforation Treatment Performed - Jet Perforation
1990-02-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-02-25 Well Fluid changed to Crude Oil
1990-02-25 Well Mode changed to Pumping
1998-04-01 Well Fluid changed to Crude Oil
1998-04-01 Well Mode changed to Suspended
2000-03-21 Perforation Treatment Performed - Cement Squeeze
2000-03-21 Plug Back Performed
2000-03-21 Production Casing Operation Performed
2000-03-21 Well Fluid changed to Crude Oil
2000-03-21 Well Mode changed to Abandoned Zone
2000-03-23 Perforation Treatment Performed - Fractured
2000-03-23 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-12-18 Perforation 2014.70 2020.80 13
1986-01-19 Packing Device Capped w/Cement 1793.00 1800.00 0
1986-01-19 Perforation 1237.00 1237.60 13
1986-01-20 Remedial Casing Cementing 1237.00 1237.60 0
1986-01-21 Perforation 1224.00 1226.50 13
1986-01-22 Acid Treatment 1224.00 1226.50 0
1986-01-24 Fracture 1224.00 1226.50 0
1990-02-20 Cement Squeeze 1224.00 1226.50 0
1990-02-22 Perforation 1810.50 1813.60 7
1990-02-22 Perforation 1815.40 1816.60 7
1990-02-22 Perforation 1817.20 1818.40 7
1976-12-21 Acid Treatment 2014.70 2020.80 0
1990-02-22 Perforation 1819.00 1820.90 7
1990-02-23 Acid Treatment 1810.50 1820.90 0
2000-03-21 Cement Squeeze 1810.50 1820.90 0
2000-03-23 Perforation 2331.00 2334.00 13
2000-03-23 Fracture 2331.00 2334.00 0
1976-12-29 Cement Squeeze 2014.70 2020.80 0
1977-01-03 Perforation 1810.50 1813.60 7
1977-01-03 Perforation 1815.40 1816.60 7
1977-01-03 Perforation 1817.20 1818.40 7
1977-01-03 Perforation 1819.00 1820.90 7
1977-01-03 Acid Treatment 1810.50 1820.90 0
1977-01-04 Fracture 1810.50 1820.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 604 0.0 0.0 0.0
1984 1384 0.0 0.0 0.0
1985 7079 0.0 0.0 0.0
1990 2555 0.0 0.0 0.0
1991 4368 0.0 0.0 0.0
1992 1320 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1976-11-08 Lost Circulation 40.20 260.60

For data sources see[6]

References