X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455091113000

Well Details

Well ID: 0455091113000
Loading map...
Location: 00/13-11-045-09W5/0
Location Alias: 00/13-11-45-09 W5M
Location Alias 2: 00/13-11-045-09 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 09
Section: 11
County/Municipality: Brazeau County
Well Name: COPOL ET AL 100 HZ WILLGR 13-11-45-9
Operator Name: Bellatrix Exploration Ltd.
License Number: 0441522
License Date: 2011-12-16
License Status: Suspension
Spud Date: 2012-02-05
Final Drill Date: 2012-02-18
Well Total Depth: 3522.00 m
Surface Hole Latitude: 52.858554
Surface Hole Longitude: -115.202984

For data sources see[1][2]

Well History

Date Event
2011-02-09 Well Log Performed
2011-12-16 Obtained License
2012-02-06 Surface Casing Operation Performed
2012-02-09 Well Log Performed
2012-02-10 Direction Drilling Operation Performed - Horizontal
2012-02-12 Well Log Performed
2012-02-14 Intermediate Casing Operation Performed
2012-02-14 Well Log Performed
2012-02-18 Finished Drilling
2012-02-18 Well Log Performed
2012-02-18 Well Mode changed to Drilled and Cased
2012-02-19 Liner Casing Operation Performed
2012-02-19 Perforation Treatment Performed - Open-Hole Completion
2012-02-20 Rig Released
2012-02-20 Well Log Performed
2012-03-09 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-10 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-11 Well Fluid changed to Gas
2012-03-11 Well Mode changed to Testing
2012-03-15 Well Fluid changed to Gas
2012-03-15 Well Mode changed to Test Completed
2012-04-02 Well Began Production
2012-04-02 Well Fluid changed to Gas
2012-04-02 Well Mode changed to Flowing
2015-01-01 Well Fluid changed to Gas
2015-01-01 Well Mode changed to Pumping
2018-11-19 Well Fluid changed to Gas
2018-11-19 Well Mode changed to Suspended

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-02-05 Precision Drilling Corporation 106 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-02-10 1980.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-19 Open Hole/Barefoot Completion 3519.00 3522.00 0
2012-03-10 Multi-Stage Fracture 2688.20 2688.70 0
2012-03-10 Multi-Stage Fracture 2544.60 2545.10 0
2012-03-09 Multi-Stage Fracture 3472.90 3473.40 0
2012-03-09 Multi-Stage Fracture 3374.80 3375.20 0
2012-03-09 Multi-Stage Fracture 3287.70 3288.20 0
2012-03-09 Multi-Stage Fracture 3189.40 3189.90 0
2012-03-09 Multi-Stage Fracture 3103.20 3103.70 0
2012-03-09 Multi-Stage Fracture 3005.30 3005.80 0
2012-03-10 Multi-Stage Fracture 2907.50 2908.00 0
2012-03-10 Multi-Stage Fracture 2820.60 2821.10 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 5888 0.0 0.0 0.0
2013 5533 0.0 0.0 0.0
2014 120 0.0 0.0 0.0
2015 8426 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8434 0.0 0.0 0.0
2018 7200 0.0 0.0 0.0

For data sources see[7]

References