X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455072904000

Well Details

Well ID: 0455072904000
Loading map...
Location: 00/04-29-045-07W5/0
Location Alias: 00/04-29-45-07 W5M
Location Alias 2: 00/04-29-045-07 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 07
Section: 29
County/Municipality: County of Wetaskiwin No. 10
Well Name: TAC HZ PEMBINA 4-29-45-7
Operator Name: Tamarack Acquisition Corp.
License Number: 0477071
License Date: 2015-10-05
License Status: Issued
Spud Date: 2016-08-14
Final Drill Date: 2016-08-27
Well Total Depth: 4259.00 m
Surface Hole Latitude: 52.924658
Surface Hole Longitude: -114.995087

For data sources see[1][2]

Well History

Date Event
2015-10-05 Obtained License
2016-08-14 Surface Casing Operation Performed
2016-08-17 Direction Drilling Operation Performed - Deviate
2016-08-17 Direction Drilling Operation Performed - Horizontal
2016-08-27 Finished Drilling
2016-08-27 Well Log Performed
2016-08-27 Well Mode changed to Drilled and Cased
2016-08-28 Production Casing Operation Performed
2016-08-29 Rig Released
2016-09-07 Perforation Treatment Performed - Multi-Stage Fracture
2016-09-08 Perforation Treatment Performed - Multi-Stage Fracture
2016-09-08 Well Began Production
2016-09-08 Well Fluid changed to Crude Oil
2016-09-08 Well Mode changed to Flowing
2016-09-21 Well Fluid changed to Crude Oil
2016-09-21 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-08-14 Excalibur Drilling Ltd. 6 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-08-17 1326.50 Deviate (5 - 79 degrees)
2016-08-17 1787.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-09-07 Multi-Stage Fracture 4206.50 4208.40 0
2016-09-07 Multi-Stage Fracture 3665.30 3667.20 0
2016-09-07 Multi-Stage Fracture 3605.20 3607.10 0
2016-09-07 Multi-Stage Fracture 3545.10 3546.90 0
2016-09-07 Multi-Stage Fracture 3484.90 3486.80 0
2016-09-07 Multi-Stage Fracture 3424.80 3426.70 0
2016-09-07 Multi-Stage Fracture 3364.60 3366.50 0
2016-09-07 Multi-Stage Fracture 3304.50 3306.40 0
2016-09-07 Multi-Stage Fracture 3244.30 3246.20 0
2016-09-07 Multi-Stage Fracture 3184.20 3186.10 0
2016-09-07 Multi-Stage Fracture 3124.10 3125.90 0
2016-09-07 Multi-Stage Fracture 4146.40 4148.30 0
2016-09-07 Multi-Stage Fracture 3063.90 3065.80 0
2016-09-07 Multi-Stage Fracture 3010.20 3012.10 0
2016-09-07 Multi-Stage Fracture 2947.10 2949.00 0
2016-09-08 Multi-Stage Fracture 2896.00 2897.90 0
2016-09-08 Multi-Stage Fracture 2832.90 2834.80 0
2016-09-08 Multi-Stage Fracture 2781.40 2783.20 0
2016-09-08 Multi-Stage Fracture 2718.20 2720.10 0
2016-09-08 Multi-Stage Fracture 2655.00 2656.90 0
2016-09-08 Multi-Stage Fracture 2603.80 2605.70 0
2016-09-08 Multi-Stage Fracture 2543.70 2545.60 0
2016-09-07 Multi-Stage Fracture 4086.30 4088.20 0
2016-09-08 Multi-Stage Fracture 2483.60 2485.50 0
2016-09-08 Multi-Stage Fracture 2423.50 2425.40 0
2016-09-08 Multi-Stage Fracture 2363.30 2365.20 0
2016-09-08 Multi-Stage Fracture 2303.20 2305.10 0
2016-09-08 Multi-Stage Fracture 2243.00 2244.90 0
2016-09-08 Multi-Stage Fracture 2182.90 2184.70 0
2016-09-08 Multi-Stage Fracture 2122.70 2124.50 0
2016-09-08 Multi-Stage Fracture 2062.50 2064.40 0
2016-09-07 Multi-Stage Fracture 4026.20 4028.10 0
2016-09-07 Multi-Stage Fracture 3966.10 3968.00 0
2016-09-07 Multi-Stage Fracture 3906.00 3907.80 0
2016-09-07 Multi-Stage Fracture 3845.80 3847.70 0
2016-09-07 Multi-Stage Fracture 3785.60 3787.50 0
2016-09-07 Multi-Stage Fracture 3725.50 3727.40 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-09-07 2016-09-08 1,673 4,797 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 85.5964 N/A
Sand - Tier 2 (20/40) Trican silica crystalline 14808-60-7 100 9.9893 N/A
Sand - Tier 2 (30/50) Trican silica crystalline 14808-60-7 100 4.1237 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0206 N/A
2-mercaptoethanol 60-24-2 100 0.0206 N/A
dibromoacetonitrile 3252-43-5 100 0.0206 N/A
non-hazardous ingredients Not Available 100 0.0206 N/A
sodium bromide 7647-15-6 100 0.0206 N/A
CC-8 Trican Clay Control choline chloride 67-48-1 100 0.1583 N/A
non-hazardous ingredients Not Available 100 0.1582 N/A
DF-1 Trican Defoamer non-hazardous ingredients Not Available 100 0.0042 N/A
GFR-5D Trican Friction Reducer anionic polyacrylamide Not Available 100 0.0238 N/A
SI-14 Trican Scale Inhibitor methanol 67-56-1 100 0.0225 N/A
non-hazardous ingredients Not Available 100 0.0225 N/A
S-17W Trican Surfactant ethylene/propylene oxide polymer Not Available 100 0.0084 N/A
methanol 67-56-1 100 0.0084 N/A
water Not Available 100 0.0084 N/A
SS-7 Trican Surfactant aliphatic alcohol 9338 100 0.0523 N/A
aminofunctional polymer 9338 100 0.0523 N/A
distillates (petroleum). sweet medium 64741-86-2 100 0.0523 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-08-29 2016-09-02 Surface Water - River 4989

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 2352 0.0 0.0 0.0
2017 8588 0.0 0.0 0.0
2018 8593 0.0 0.0 0.0
2019 7033 0.0 0.0 0.0
2020 2041 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-08-28 No Incident Encountered 0.00 0.00
2016-09-20 No Incident Encountered 0.00 0.00

For data sources see[10]

References