X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455072512000

Well Details

Well ID: 0455072512000
Loading map...
Location: 00/12-25-045-07W5/0
Location Alias: 00/12-25-45-07 W5M
Location Alias 2: 00/12-25-045-07 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 07
Section: 25
County/Municipality: County of Wetaskiwin No. 10
Well Name: CANSEABID ET AL PEM 12-25-45-7
Operator Name: Imperial Oil Resources Limited
License Number: 0003064
License Date: 1951-06-20
License Status: RecExempt
Spud Date: 1951-07-24
Final Drill Date: 1952-01-24
Well Total Depth: 3096.20 m
Surface Hole Latitude: 52.911277
Surface Hole Longitude: -114.892489

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-06-20 Obtained License
1951-08-18 Drill Stem Test Performed
1951-11-10 Drill Stem Test Performed
1952-01-24 Finished Drilling
1952-01-31 Production Casing Operation Performed
1952-02-04 Drill Stem Test Performed
1952-02-04 Perforation Treatment Performed - Bullet Perforation
1952-02-05 Perforation Treatment Performed - Cement Squeeze
1952-02-06 Perforation Treatment Performed - Bullet Perforation
1952-02-07 Drill Stem Test Performed
1952-02-08 Perforation Treatment Performed - Cement Squeeze
1952-02-09 Drill Stem Test Performed
1952-02-09 Perforation Treatment Performed - Bullet Perforation
1952-02-09 Perforation Treatment Performed - Cement Squeeze
1952-02-11 Drill Stem Test Performed
1952-02-11 Perforation Treatment Performed - Bullet Perforation
1952-02-11 Perforation Treatment Performed - Cement Squeeze
1952-02-12 Perforation Treatment Performed - Bullet Perforation
1952-02-13 Perforation Treatment Performed - Cement Squeeze
1952-02-14 Perforation Treatment Performed - Bullet Perforation
1952-02-16 Perforation Treatment Performed - Bullet Perforation
1952-02-16 Perforation Treatment Performed - Cement Squeeze
1952-02-17 Drill Stem Test Performed
1952-02-17 Perforation Treatment Performed - Cement Plug
1952-02-18 Drill Stem Test Performed
1952-02-18 Perforation Treatment Performed - Bullet Perforation
1952-02-20 Perforation Treatment Performed - Acid Wash - No Pressure
1952-02-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1952-02-20 Perforation Treatment Performed - Bullet Perforation
1952-02-23 Perforation Treatment Performed - Cement Plug
1952-03-18 Well Abandoned
1952-03-18 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-02-04 Bullet Perforation 2226.30 2226.60 13
1952-02-13 Cement Squeeze 2219.90 2221.10 0
1952-02-14 Bullet Perforation 2222.00 2223.80 13
1952-02-16 Cement Squeeze 2222.00 2223.80 0
1952-02-16 Bullet Perforation 2224.40 2225.60 13
1952-02-16 Bullet Perforation 2226.90 2228.10 13
1952-02-17 Cement Plug 2208.30 2229.30 0
1952-02-18 Bullet Perforation 2203.70 2204.60 13
1952-02-18 Bullet Perforation 2200.40 2201.60 13
1952-02-20 Packing Device Capped w/Cement 2197.60 2202.50 0
1952-02-20 Bullet Perforation 2194.60 2198.20 13
1952-02-05 Cement Squeeze 2226.30 2226.60 0
1952-02-20 Acid Wash 2194.60 2198.20 0
1952-02-23 Cement Plug 2087.90 2179.30 0
1952-02-06 Bullet Perforation 2213.50 2213.80 13
1952-02-08 Cement Squeeze 2213.50 2213.80 0
1952-02-09 Bullet Perforation 2213.80 2214.10 13
1952-02-09 Cement Squeeze 2213.80 2214.10 0
1952-02-11 Bullet Perforation 2226.00 2226.30 13
1952-02-11 Cement Squeeze 2226.00 2226.30 0
1952-02-12 Bullet Perforation 2219.90 2221.10 13

For data sources see[4]



References