If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0455063414002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.92804,"lon":-114.79274,"icon":""}]} |
Location: 00/14-34-045-06W5/2 | |
Location Alias: 00/14-34-45-06 W5M | |
Location Alias 2: 00/14-34-045-06 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 045 | |
Meridian: 5 | |
Range: 06 | |
Section: 34 | |
County/Municipality: County of Wetaskiwin No. 10 | |
Well Name: TAC PEMBINA 14-34-45-6 | |
Operator Name: Tamarack Acquisition Corp. | |
License Number: 0091128 | |
License Date: 1981-07-09 | |
License Status: Suspension | |
Spud Date: 1981-08-05 | |
Final Drill Date: 1981-08-16 | |
Well Total Depth: 1610.00 m | |
Surface Hole Latitude: 52.928040 | |
Surface Hole Longitude: -114.792740 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1981-07-09 | Obtained License |
1981-08-16 | Finished Drilling |
1981-08-16 | Well Mode changed to Drilled and Cased |
1981-08-18 | Production Casing Operation Performed |
1982-01-18 | Perforation Treatment Performed - Fractured |
1982-01-18 | Perforation Treatment Performed - Jet Perforation |
1982-06-04 | Perforation Treatment Performed - Jet Perforation |
1982-06-06 | Perforation Treatment Performed - Cement Squeeze |
1982-06-09 | Perforation Treatment Performed - Jet Perforation |
1982-06-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1982-06-15 | Perforation Treatment Performed - Fractured |
1982-07-15 | Perforation Treatment Performed - Cement Squeeze |
1982-07-19 | Perforation Treatment Performed - Jet Perforation |
1982-07-21 | Perforation Treatment Performed - Fractured |
1982-07-28 | Perforation Treatment Performed - Cement Squeeze |
2001-08-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-08-07 | Perforation Treatment Performed - Jet Perforation |
2001-08-07 | Plug Back Performed |
2001-08-07 | Well Log Performed |
2001-08-07 | Well Mode changed to Drilled and Cased |
2008-03-24 | Well Began Production |
2008-03-24 | Well Fluid changed to Crude Oil |
2008-03-24 | Well Mode changed to Flowing |
2011-04-04 | Perforation Treatment Performed - Jet Perforation |
2011-12-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-12-17 | Well Log Performed |
2013-04-01 | Well Fluid changed to Crude Oil |
2013-04-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1982-01-18 | Perforation | 1575.60 | 1578.50 | 7 |
1982-07-15 | Cement Squeeze | 1241.00 | 1250.00 | 0 |
1982-07-19 | Perforation | 1218.00 | 1221.50 | 7 |
1982-07-21 | Fracture | 1218.00 | 1221.50 | 0 |
1982-07-28 | Cement Squeeze | 1218.00 | 1221.50 | 0 |
2001-08-07 | Packing Device Capped w/Cement | 1556.70 | 1564.70 | 0 |
2001-08-07 | Perforation | 1240.00 | 1245.00 | 17 |
2001-08-07 | Perforation | 1248.00 | 1250.00 | 17 |
2011-04-04 | Perforation | 1240.10 | 1244.90 | 2 |
2011-12-17 | Packing Device Capped w/Cement | 1225.00 | 1233.00 | 0 |
1982-01-18 | Fracture | 1575.60 | 1578.50 | 0 |
1982-01-18 | Fracture | 1575.60 | 1578.50 | 0 |
1982-06-04 | Perforation | 1253.00 | 1255.00 | 13 |
1982-06-06 | Cement Squeeze | 1253.00 | 1255.00 | 0 |
1982-06-09 | Perforation | 1241.00 | 1245.00 | 7 |
1982-06-09 | Perforation | 1248.50 | 1250.00 | 7 |
1982-06-12 | Acid Treatment | 1241.00 | 1250.00 | 0 |
1982-06-15 | Fracture | 1241.00 | 1250.00 | 0 |
For data sources see[4]