X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455063405003

Well Details

Well ID: 0455063405003
Loading map...
Location: 00/05-34-045-06W5/3
Location Alias: 00/05-34-45-06 W5M
Location Alias 2: 00/05-34-045-06 W5/03
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 06
Section: 34
County/Municipality: County of Wetaskiwin No. 10
Well Name: TAC PEMBINA 5-34-45-6
Operator Name: Tamarack Acquisition Corp.
License Number: 0100815
License Date: 1983-03-01
License Status: Issued
Spud Date: 1983-03-10
Final Drill Date: 1983-03-26
Well Total Depth: 1904.00 m
Surface Hole Latitude: 52.920409
Surface Hole Longitude: -114.792993

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-03-01 Obtained License
1983-03-16 Drill Stem Test Performed
1983-03-23 Production Casing Operation Performed
1983-03-24 Perforation Treatment Performed - Open-Hole Completion
1983-03-26 Drill Stem Test Performed
1983-03-26 Finished Drilling
1983-03-26 Well Mode changed to Drilled and Cased
1983-03-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-06-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-06-06 Perforation Treatment Performed - Jet Perforation
1983-06-07 Perforation Treatment Performed - Fractured
1983-06-12 Perforation Treatment Performed - Jet Perforation
1983-06-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-06-14 Perforation Treatment Performed - Fractured
1994-02-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-02-27 Perforation Treatment Performed - Jet Perforation
1994-02-27 Plug Back Performed
1994-02-27 Well Log Performed
1994-03-12 Perforation Treatment Performed - Fractured
1994-03-22 Well Began Production
1994-03-22 Well Fluid changed to Crude Oil
1994-03-22 Well Mode changed to Pumping
2003-07-03 Well Fluid changed to Crude Oil
2003-07-03 Well Mode changed to Suspended
2004-04-19 Well Fluid changed to Crude Oil
2004-04-19 Well Mode changed to Pumping
2014-03-14 Well Fluid changed to Crude Oil
2014-03-14 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-03-24 Open Hole/Barefoot Completion 1867.00 1904.00 0
1994-02-27 Packing Device Capped w/Cement 1562.00 1570.00 0
1994-02-27 Perforation 1124.00 1129.00 13
1994-03-12 Fracture 1124.00 1129.00 0
1983-03-27 Packing Device Capped w/Cement 1842.00 1850.00 0
1983-06-06 Perforation 1579.00 1582.00 7
1983-06-06 Acid Treatment 1579.00 1582.00 0
1983-06-07 Fracture 1579.00 1582.00 0
1983-06-12 Perforation 1174.00 1181.00 7
1983-06-12 Perforation 1184.00 1185.00 7
1983-06-13 Acid Treatment 1174.00 1185.00 0
1983-06-14 Fracture 1174.00 1185.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 4935 0.0 0.0 0.0
1995 8326 0.0 0.0 0.0
1996 6407 0.0 0.0 0.0
1997 7628 0.0 0.0 0.0
1998 8543 0.0 0.0 0.0
1999 5279 0.0 0.0 0.0
2000 2266 0.0 0.0 0.0
2001 8671 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 4415 0.0 0.0 0.0
2004 6240 0.0 0.0 0.0
2005 8112 0.0 0.0 0.0
2006 8543 0.0 0.0 0.0
2007 8735 0.0 0.0 0.0
2008 8759 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8624 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 7656 0.0 0.0 0.0
2015 8615 0.0 0.0 0.0
2016 8567 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 6600 0.0 0.0 0.0
2019 8746 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References