X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455063215000

Well Details

Well ID: 0455063215000
Loading map...
Location: 00/15-32-045-06W5/0
Location Alias: 00/15-32-45-06 W5M
Location Alias 2: 00/15-32-045-06 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 06
Section: 32
County/Municipality: County of Wetaskiwin No. 10
Well Name: WHITECAP MINHIK 15-32-45-6
Operator Name: Whitecap Resources Inc.
License Number: 0434593
License Date: 2011-06-23
License Status: Issued
Spud Date: 2011-07-20
Final Drill Date: 2011-08-01
Well Total Depth: 3215.00 m
Surface Hole Latitude: 52.915989
Surface Hole Longitude: -114.826360

For data sources see[1][2]

Well History

Date Event
2011-04-26 Well Log Performed
2011-06-23 Obtained License
2011-07-21 Surface Casing Operation Performed
2011-07-22 Well Log Performed
2011-07-23 Direction Drilling Operation Performed - Horizontal
2011-07-26 Well Log Performed
2011-07-27 Intermediate Casing Operation Performed
2011-08-01 Finished Drilling
2011-08-01 Well Log Performed
2011-08-01 Well Mode changed to Drilled and Cased
2011-08-03 Liner Casing Operation Performed
2011-08-06 Rig Released
2011-08-08 Well Log Performed
2011-08-18 Perforation Treatment Performed - Multi-Stage Fracture
2011-08-18 Perforation Treatment Performed - Open-Hole Completion
2011-08-19 Perforation Treatment Performed - Multi-Stage Fracture
2011-08-21 Well Began Production
2011-08-21 Well Fluid changed to Crude Oil
2011-08-21 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-07-23 1119.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-08-18 Open Hole/Barefoot Completion 3199.00 3215.00 0
2011-08-19 Multi-Stage Fracture 2547.00 2547.10 0
2011-08-19 Multi-Stage Fracture 2461.90 2462.00 0
2011-08-19 Multi-Stage Fracture 2390.00 2390.10 0
2011-08-19 Multi-Stage Fracture 2318.20 2318.30 0
2011-08-19 Multi-Stage Fracture 2233.00 2233.10 0
2011-08-19 Multi-Stage Fracture 2161.20 2161.30 0
2011-08-19 Multi-Stage Fracture 2076.20 2076.30 0
2011-08-19 Multi-Stage Fracture 2004.30 2004.40 0
2011-08-19 Multi-Stage Fracture 1918.10 1918.20 0
2011-08-19 Multi-Stage Fracture 1847.30 1847.40 0
2011-08-18 Multi-Stage Fracture 3165.80 3165.90 0
2011-08-18 Multi-Stage Fracture 3076.40 3076.50 0
2011-08-18 Multi-Stage Fracture 3004.60 3004.70 0
2011-08-18 Multi-Stage Fracture 2932.70 2932.80 0
2011-08-18 Multi-Stage Fracture 2847.80 2847.90 0
2011-08-18 Multi-Stage Fracture 2776.30 2776.40 0
2011-08-18 Multi-Stage Fracture 2704.20 2704.30 0
2011-08-18 Multi-Stage Fracture 2618.80 2618.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 2409 0.0 0.0 0.0
2012 8718 0.0 0.0 0.0
2013 8568 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8639 0.0 0.0 0.0
2016 8567 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8717 0.0 0.0 0.0
2019 8724 0.0 0.0 0.0
2020 2132 0.0 0.0 0.0

For data sources see[6]

References