X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455063016020

Well Details

Well ID: 0455063016020
Loading map...
Location: 02/16-30-045-06W5/0
Location Alias: 02/16-30-45-06 W5M
Location Alias 2: 02/16-30-045-06 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 06
Section: 30
County/Municipality: County of Wetaskiwin No. 10
Well Name: TAC 02 HZ PEMBINA 16-30-45-6
Operator Name: Tamarack Acquisition Corp.
License Number: 0482070
License Date: 2016-12-20
License Status: Issued
Spud Date: 2017-01-03
Final Drill Date: 2017-01-13
Well Total Depth: 3654.00 m
Surface Hole Latitude: 52.909005
Surface Hole Longitude: -114.873881

For data sources see[1][2]

Well History

Date Event
2016-12-20 Obtained License
2017-01-04 Surface Casing Operation Performed
2017-01-06 Direction Drilling Operation Performed - Deviate
2017-01-07 Direction Drilling Operation Performed - Horizontal
2017-01-08 Intermediate Casing Operation Performed
2017-01-13 Finished Drilling
2017-01-13 Well Log Performed
2017-01-13 Well Mode changed to Drilled and Cased
2017-01-15 Production Casing Operation Performed
2017-01-15 Rig Released
2017-01-17 Well Log Performed
2017-01-20 Perforation Treatment Performed - Multi-Stage Fracture
2017-01-21 Well Began Production
2017-01-21 Well Fluid changed to Gas
2017-01-21 Well Mode changed to Flowing
2017-01-24 Well Log Performed

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-01-03 Excalibur Drilling Ltd. 2 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-01-06 1657.90 Deviate (5 - 79 degrees)
2017-01-07 2137.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-01-20 Multi-Stage Fracture 3629.20 3629.70 0
2017-01-20 Multi-Stage Fracture 2947.70 2948.20 0
2017-01-20 Multi-Stage Fracture 2864.30 2864.80 0
2017-01-20 Multi-Stage Fracture 2780.90 2781.40 0
2017-01-20 Multi-Stage Fracture 2697.50 2698.00 0
2017-01-20 Multi-Stage Fracture 2625.70 2626.20 0
2017-01-20 Multi-Stage Fracture 2542.20 2542.70 0
2017-01-20 Multi-Stage Fracture 2458.90 2459.40 0
2017-01-20 Multi-Stage Fracture 2387.00 2387.50 0
2017-01-20 Multi-Stage Fracture 2303.80 2304.30 0
2017-01-20 Multi-Stage Fracture 2232.20 2232.70 0
2017-01-20 Multi-Stage Fracture 3563.40 3563.90 0
2017-01-20 Multi-Stage Fracture 3480.00 3480.50 0
2017-01-20 Multi-Stage Fracture 3408.50 3409.00 0
2017-01-20 Multi-Stage Fracture 3325.50 3326.00 0
2017-01-20 Multi-Stage Fracture 3254.30 3254.80 0
2017-01-20 Multi-Stage Fracture 3172.50 3173.00 0
2017-01-20 Multi-Stage Fracture 3101.10 3101.60 0
2017-01-20 Multi-Stage Fracture 3018.70 3019.20 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-01-20 2017-01-20 1,987 3,779 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Nitrogen Not Available 100 8.1693 N/A
Water Not Available 100 81.8307 N/A
30/50 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 8.2745 N/A
40/70 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 8.2824 N/A
Econocide B1008 (Biocide) Step Energy Services Bactericide/Biocide 2-bromo-2-nitro.3-diol 52-51-7 100 0.0077 N/A
Methyl Alcohol 67-56-1 100 0.0077 N/A
Non-Hazardous Ingredients Not Available 100 0.0077 N/A
SCS-1 (Clay Control) Step Energy Services Clay Control Choline chloride 67-48-1 100 0.1614 N/A
Non-Hazardous Ingredients Not Available 100 0.1614 N/A
SFR-106 (Friction Reducer) Step Energy Services Friction Reducer Ethoxylated Alcohol 78330-21-9 100 0.072 N/A
Non-Hazardous Ingredients Not Available 100 0.072 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.072 N/A
SNE-2 (Non-Emulsifier) Step Energy Services Surfactant 2-Ethylhexanol distillation residue 68609-68-7 100 0.0809 N/A
Dodecylbenzene Sulfonic Acid 27176-87-0 100 0.0809 N/A
Methanol 67-56-1 100 0.0809 N/A
Monoethanolamine 141-43-5 100 0.0809 N/A
Oxirane. methyl-. polymer 11/6/9003 100 0.0809 N/A
Poly(oxy-1.2-ethanediyl). alphaisotridecyl-omega-hydroxy- 9043-30-5 100 0.0809 N/A
Water 7732-18-5 100 0.0809 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-01-20 2017-01-20 Surface Water - Runoff 1700
2017-01-20 2017-01-20 Surface Water - Lake 2195

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 6566 0.0 0.0 0.0
2018 8026 0.0 0.0 0.0
2019 8556 0.0 0.0 0.0
2020 2163 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-01-15 No Incident Encountered 0.00 0.00
2017-01-20 No Incident Encountered 0.00 0.00

For data sources see[10]

References