X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455062113000

Well Details

Well ID: 0455062113000
Loading map...
Location: 00/13-21-045-06W5/0
Location Alias: 00/13-21-45-06 W5M
Location Alias 2: 00/13-21-045-06 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 06
Section: 21
County/Municipality: County of Wetaskiwin No. 10
Well Name: TAC PEMBINA 13-21-45-6
Operator Name: Tamarack Acquisition Corp.
License Number: 0435597
License Date: 2011-07-28
License Status: Issued
Spud Date: 2011-09-08
Final Drill Date: 2011-09-17
Well Total Depth: 3020.00 m
Surface Hole Latitude: 52.888012
Surface Hole Longitude: -114.824031

For data sources see[1][2]

Well History

Date Event
2011-07-28 Obtained License
2011-09-09 Surface Casing Operation Performed
2011-09-10 Direction Drilling Operation Performed - Horizontal
2011-09-11 Lost Circulation Occurred
2011-09-17 Finished Drilling
2011-09-17 Well Mode changed to Drilled and Cased
2011-09-25 Production Casing Operation Performed
2011-09-25 Rig Released
2011-10-09 Well Log Performed
2011-10-10 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-10 Perforation Treatment Performed - Open-Hole Completion
2011-10-14 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-15 Well Began Production
2011-11-15 Well Fluid changed to Crude Oil
2011-11-15 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-09-10 1345.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-10-10 Open Hole/Barefoot Completion 3015.70 3020.00 0
2011-10-10 Multi-Stage Fracture 2466.20 2466.30 0
2011-10-14 Multi-Stage Fracture 2299.60 2299.70 0
2011-10-14 Multi-Stage Fracture 2202.90 2203.00 0
2011-10-14 Multi-Stage Fracture 2180.50 2180.60 0
2011-10-14 Multi-Stage Fracture 2070.40 2070.50 0
2011-10-14 Multi-Stage Fracture 2000.50 2000.60 0
2011-10-14 Multi-Stage Fracture 1971.20 1971.30 0
2011-10-14 Multi-Stage Fracture 1901.30 1901.40 0
2011-10-10 Multi-Stage Fracture 2997.40 2997.50 0
2011-10-10 Multi-Stage Fracture 2927.60 2927.70 0
2011-10-10 Multi-Stage Fracture 2830.90 2831.00 0
2011-10-10 Multi-Stage Fracture 2774.70 2774.80 0
2011-10-10 Multi-Stage Fracture 2691.50 2691.60 0
2011-10-10 Multi-Stage Fracture 2662.10 2662.20 0
2011-10-10 Multi-Stage Fracture 2551.90 2552.00 0
2011-10-10 Multi-Stage Fracture 2509.00 2509.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1128 0.0 0.0 0.0
2012 8683 0.0 0.0 0.0
2013 8156 0.0 0.0 0.0
2014 7703 0.0 0.0 0.0
2015 8212 0.0 0.0 0.0
2016 8496 0.0 0.0 0.0
2017 8279 0.0 0.0 0.0
2018 4458 0.0 0.0 0.0
2019 6229 0.0 0.0 0.0
2020 2162 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2011-09-11 Lost Circulation 1767.00 3020.00

For data sources see[7]

References