If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0455061209000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.864966,"lon":-114.752044,"icon":""}]} |
Location: 00/09-12-045-06W5/0 | |
Location Alias: 00/09-12-45-06 W5M | |
Location Alias 2: 00/09-12-045-06 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 045 | |
Meridian: 5 | |
Range: 06 | |
Section: 12 | |
County/Municipality: County of Wetaskiwin No. 10 | |
Well Name: TAC HZ PEMBINA 9-12-45-6 | |
Operator Name: Tamarack Acquisition Corp. | |
License Number: 0431154 | |
License Date: 2011-02-03 | |
License Status: Issued | |
Spud Date: 2011-03-26 | |
Final Drill Date: 2011-04-01 | |
Well Total Depth: 3157.00 m | |
Surface Hole Latitude: 52.864966 | |
Surface Hole Longitude: -114.752044 |
Date | Event |
---|---|
2011-02-03 | Obtained License |
2011-03-27 | Surface Casing Operation Performed |
2011-03-28 | Direction Drilling Operation Performed - Deviate |
2011-03-28 | Direction Drilling Operation Performed - Horizontal |
2011-03-28 | Well Log Performed |
2011-04-01 | Finished Drilling |
2011-04-01 | Well Mode changed to Drilled and Cased |
2011-04-02 | Production Casing Operation Performed |
2011-04-02 | Well Log Performed |
2011-04-03 | Perforation Treatment Performed - Open-Hole Completion |
2011-04-03 | Rig Released |
2011-07-20 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-10-01 | Well Began Production |
2011-10-01 | Well Fluid changed to Crude Oil |
2011-10-01 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-03-28 | 1320.00 | Deviate (5 - 79 degrees) |
2011-03-28 | 1907.90 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-04-03 | Open Hole/Barefoot Completion | 3145.20 | 3157.00 | 0 |
2011-07-20 | Multi-Stage Fracture | 2348.10 | 2437.10 | 0 |
2011-07-20 | Multi-Stage Fracture | 2258.70 | 2348.10 | 0 |
2011-07-20 | Multi-Stage Fracture | 2169.80 | 2258.70 | 0 |
2011-07-20 | Multi-Stage Fracture | 2081.60 | 2169.80 | 0 |
2011-07-20 | Multi-Stage Fracture | 1977.20 | 2081.60 | 0 |
2011-07-20 | Multi-Stage Fracture | 3067.40 | 3142.10 | 0 |
2011-07-20 | Multi-Stage Fracture | 2974.80 | 3067.40 | 0 |
2011-07-20 | Multi-Stage Fracture | 2883.70 | 2974.80 | 0 |
2011-07-20 | Multi-Stage Fracture | 2794.40 | 2883.70 | 0 |
2011-07-20 | Multi-Stage Fracture | 2704.00 | 2794.40 | 0 |
2011-07-20 | Multi-Stage Fracture | 2614.30 | 2704.30 | 0 |
2011-07-20 | Multi-Stage Fracture | 2526.10 | 2614.30 | 0 |
2011-07-20 | Multi-Stage Fracture | 2437.10 | 2526.10 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 1206 | 0.0 | 0.0 | 0.0 |
2012 | 5044 | 0.0 | 0.0 | 0.0 |
2013 | 7709 | 0.0 | 0.0 | 0.0 |
2014 | 8506 | 0.0 | 0.0 | 0.0 |
2015 | 7306 | 0.0 | 0.0 | 0.0 |
2016 | 8592 | 0.0 | 0.0 | 0.0 |
2017 | 8085 | 0.0 | 0.0 | 0.0 |
2018 | 2072 | 0.0 | 0.0 | 0.0 |
2019 | 8530 | 0.0 | 0.0 | 0.0 |
2020 | 1987 | 0.0 | 0.0 | 0.0 |
For data sources see[6]