X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455061009000

Well Details

Well ID: 0455061009000
Loading map...
Location: 00/09-10-045-06W5/0
Location Alias: 00/09-10-45-06 W5M
Location Alias 2: 00/09-10-045-06 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 06
Section: 10
County/Municipality: County of Wetaskiwin No. 10
Well Name: TAC PEMBINA 9-10-45-6
Operator Name: Tamarack Acquisition Corp.
License Number: 0443164
License Date: 2012-01-20
License Status: Issued
Spud Date: 2012-02-15
Final Drill Date: 2012-02-22
Well Total Depth: 3058.00 m
Surface Hole Latitude: 52.870110
Surface Hole Longitude: -114.800141

For data sources see[1][2]

Well History

Date Event
2012-01-20 Obtained License
2012-02-16 Surface Casing Operation Performed
2012-02-18 Direction Drilling Operation Performed - Horizontal
2012-02-22 Finished Drilling
2012-02-22 Well Log Performed
2012-02-22 Well Mode changed to Drilled and Cased
2012-02-23 Production Casing Operation Performed
2012-02-23 Rig Released
2012-08-21 Well Log Performed
2012-08-25 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-25 Perforation Treatment Performed - Open-Hole Completion
2012-08-26 Perforation Treatment Performed - Multi-Stage Fracture
2012-10-18 Well Began Production
2012-10-18 Well Fluid changed to Crude Oil
2012-10-18 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-02-15 Precision Drilling Technology Services Group Inc. 196 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-02-18 1380.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-08-25 Open Hole/Barefoot Completion 3047.20 3058.00 0
2012-08-25 Multi-Stage Fracture 2502.10 2502.20 0
2012-08-25 Multi-Stage Fracture 2445.70 2445.80 0
2012-08-26 Multi-Stage Fracture 2375.80 2375.90 0
2012-08-26 Multi-Stage Fracture 2292.50 2292.60 0
2012-08-26 Multi-Stage Fracture 2249.40 2249.50 0
2012-08-26 Multi-Stage Fracture 2192.90 2193.00 0
2012-08-26 Multi-Stage Fracture 2123.00 2123.10 0
2012-08-26 Multi-Stage Fracture 2066.50 2066.60 0
2012-08-26 Multi-Stage Fracture 1996.70 1996.80 0
2012-08-25 Multi-Stage Fracture 3016.30 3016.40 0
2012-08-25 Multi-Stage Fracture 2949.40 2949.50 0
2012-08-25 Multi-Stage Fracture 2881.20 2881.30 0
2012-08-25 Multi-Stage Fracture 2838.30 2838.40 0
2012-08-25 Multi-Stage Fracture 2768.40 2768.50 0
2012-08-25 Multi-Stage Fracture 2685.00 2685.10 0
2012-08-25 Multi-Stage Fracture 2628.40 2628.50 0
2012-08-25 Multi-Stage Fracture 2558.40 2558.50 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 1758 0.0 0.0 0.0
2013 8215 0.0 0.0 0.0
2014 8306 0.0 0.0 0.0
2015 8591 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8423 0.0 0.0 0.0
2018 8687 0.0 0.0 0.0
2019 8751 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-29 No Incident Encountered 0.00 0.00

For data sources see[8]

References