X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455060904000

Well Details

Well ID: 0455060904000
Loading map...
Location: 00/04-09-045-06W5/0
Location Alias: 00/04-09-45-06 W5M
Location Alias 2: 00/04-09-045-06 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 06
Section: 09
County/Municipality: County of Wetaskiwin No. 10
Well Name: TAC PEMBINA 4-9-45-6
Operator Name: Tamarack Acquisition Corp.
License Number: 0444405
License Date: 2012-02-23
License Status: Issued
Spud Date: 2012-07-31
Final Drill Date: 2012-08-07
Well Total Depth: 3280.00 m
Surface Hole Latitude: 52.863464
Surface Hole Longitude: -114.797727

For data sources see[1][2]

Well History

Date Event
2012-02-23 Obtained License
2012-07-31 Lost Circulation Occurred
2012-08-01 Surface Casing Operation Performed
2012-08-02 Direction Drilling Operation Performed - Deviate
2012-08-04 Direction Drilling Operation Performed - Horizontal
2012-08-04 Well Log Performed
2012-08-07 Finished Drilling
2012-08-07 Well Log Performed
2012-08-07 Well Mode changed to Drilled and Cased
2012-08-08 Production Casing Operation Performed
2012-08-08 Rig Released
2012-10-11 Perforation Treatment Performed - Multi-Stage Fracture
2012-10-11 Perforation Treatment Performed - Open-Hole Completion
2012-11-12 Well Began Production
2012-11-12 Well Fluid changed to Crude Oil
2012-11-12 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-07-31 Precision Drilling Corporation 196 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-08-02 1328.00 Deviate (5 - 79 degrees)
2012-08-04 1867.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-10-11 Open Hole/Barefoot Completion 3272.00 3280.00 0
2012-10-11 Multi-Stage Fracture 2588.20 2588.30 0
2012-10-11 Multi-Stage Fracture 2519.00 2519.10 0
2012-10-11 Multi-Stage Fracture 2435.70 2435.80 0
2012-10-11 Multi-Stage Fracture 2339.80 2339.90 0
2012-10-11 Multi-Stage Fracture 2256.60 2256.70 0
2012-10-11 Multi-Stage Fracture 2200.20 2200.30 0
2012-10-11 Multi-Stage Fracture 2116.90 2117.00 0
2012-10-11 Multi-Stage Fracture 2020.20 2020.30 0
2012-10-11 Multi-Stage Fracture 1937.10 1937.20 0
2012-10-11 Multi-Stage Fracture 3226.80 3226.90 0
2012-10-11 Multi-Stage Fracture 3143.70 3143.80 0
2012-10-11 Multi-Stage Fracture 3060.20 3060.30 0
2012-10-11 Multi-Stage Fracture 2977.50 2977.60 0
2012-10-11 Multi-Stage Fracture 2907.80 2907.90 0
2012-10-11 Multi-Stage Fracture 2824.40 2824.50 0
2012-10-11 Multi-Stage Fracture 2741.40 2741.50 0
2012-10-11 Multi-Stage Fracture 2671.40 2671.50 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 1161 0.0 0.0 0.0
2013 8195 0.0 0.0 0.0
2014 8316 0.0 0.0 0.0
2015 8596 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8591 0.0 0.0 0.0
2018 8375 0.0 0.0 0.0
2019 2615 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-07-31 Lost Circulation 60.00 611.00
2012-11-03 No Incident Encountered 0.00 0.00

For data sources see[8]

References