X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455060116000

Well Details

Well ID: 0455060116000
Loading map...
Location: 00/16-01-045-06W5/0
Location Alias: 00/16-01-45-06 W5M
Location Alias 2: 00/16-01-045-06 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 06
Section: 01
County/Municipality: County of Wetaskiwin No. 10
Well Name: TAC HZ PEMBINA 16-1-45-6
Operator Name: Tamarack Acquisition Corp.
License Number: 0447302
License Date: 2012-07-20
License Status: Amended
Spud Date: 2012-08-11
Final Drill Date: 2012-08-21
Well Total Depth: 3588.00 m
Surface Hole Latitude: 52.850154
Surface Hole Longitude: -114.749006

For data sources see[1][2]

Well History

Date Event
2012-07-20 Obtained License
2012-08-13 Surface Casing Operation Performed
2012-08-15 Direction Drilling Operation Performed - Deviate
2012-08-15 Well Log Performed
2012-08-17 Direction Drilling Operation Performed - Horizontal
2012-08-21 Finished Drilling
2012-08-21 Perforation Treatment Performed - Open-Hole Completion
2012-08-21 Well Log Performed
2012-08-21 Well Mode changed to Drilled and Cased
2012-08-23 Production Casing Operation Performed
2012-08-23 Rig Released
2012-10-23 Well Log Performed
2012-11-01 Well Fluid changed to Crude Oil
2012-11-01 Well Mode changed to Drilling and Completing
2012-11-08 Perforation Treatment Performed - Multi-Stage Fracture
2013-01-01 Well Began Production
2013-01-01 Well Fluid changed to Crude Oil
2013-01-01 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-08-11 Nabors Drilling Limited 15 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-08-15 980.00 Deviate (5 - 79 degrees)
2012-08-17 2123.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-08-21 Open Hole/Barefoot Completion 3575.50 3588.00 0
2012-11-08 Multi-Stage Fracture 2832.30 2832.40 0
2012-11-08 Multi-Stage Fracture 2753.30 2753.40 0
2012-11-08 Multi-Stage Fracture 2647.10 2647.20 0
2012-11-08 Multi-Stage Fracture 2555.20 2555.30 0
2012-11-08 Multi-Stage Fracture 2464.40 2464.50 0
2012-11-08 Multi-Stage Fracture 2385.80 2385.90 0
2012-11-08 Multi-Stage Fracture 2293.90 2294.00 0
2012-11-08 Multi-Stage Fracture 3557.20 3557.30 0
2012-11-08 Multi-Stage Fracture 3466.00 3466.10 0
2012-11-08 Multi-Stage Fracture 3372.10 3372.20 0
2012-11-08 Multi-Stage Fracture 3280.10 3280.20 0
2012-11-08 Multi-Stage Fracture 3187.60 3187.70 0
2012-11-08 Multi-Stage Fracture 3095.70 3095.80 0
2012-11-08 Multi-Stage Fracture 3016.50 3016.60 0
2012-11-08 Multi-Stage Fracture 2925.60 2925.70 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 0 0.0 0.0 0.0
2013 7548 0.0 0.0 0.0
2014 8608 0.0 0.0 0.0
2015 7295 0.0 0.0 0.0
2016 8234 0.0 0.0 0.0
2017 4171 0.0 0.0 0.0
2018 8598 0.0 0.0 0.0
2019 8668 0.0 0.0 0.0
2020 2181 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-23 No Incident Encountered 0.00 0.00
2012-11-21 No Incident Encountered 0.00 0.00

For data sources see[8]

References