X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455060108020

Well Details

Well ID: 0455060108020
Loading map...
Location: 02/08-01-045-06W5/0
Location Alias: 02/08-01-45-06 W5M
Location Alias 2: 02/08-01-045-06 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 06
Section: 01
County/Municipality: County of Wetaskiwin No. 10
Well Name: TAC 102 HZ PEMBINA 8-1-45-6
Operator Name: Tamarack Acquisition Corp.
License Number: 0447303
License Date: 2012-07-20
License Status: Issued
Spud Date: 2012-09-04
Final Drill Date: 2012-09-11
Well Total Depth: 3170.00 m
Surface Hole Latitude: 52.850155
Surface Hole Longitude: -114.749452

For data sources see[1][2]

Well History

Date Event
2012-07-20 Obtained License
2012-09-05 Surface Casing Operation Performed
2012-09-06 Direction Drilling Operation Performed - Deviate
2012-09-06 Well Log Performed
2012-09-08 Direction Drilling Operation Performed - Horizontal
2012-09-11 Finished Drilling
2012-09-11 Perforation Treatment Performed - Open-Hole Completion
2012-09-11 Production Casing Operation Performed
2012-09-11 Well Log Performed
2012-09-11 Well Mode changed to Drilled and Cased
2012-09-13 Rig Released
2012-10-24 Well Log Performed
2012-11-01 Well Fluid changed to Crude Oil
2012-11-01 Well Mode changed to Drilling and Completing
2012-11-16 Perforation Treatment Performed - Multi-Stage Fracture
2012-11-17 Perforation Treatment Performed - Multi-Stage Fracture
2013-01-01 Well Began Production
2013-01-01 Well Fluid changed to Crude Oil
2013-01-01 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-09-04 Nabors Drilling Limited C0015 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-09-06 784.20 Deviate (5 - 79 degrees)
2012-09-08 1844.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-09-11 Open Hole/Barefoot Completion 3157.80 3170.00 0
2012-11-17 Multi-Stage Fracture 2433.30 2433.40 0
2012-11-17 Multi-Stage Fracture 2353.60 2353.70 0
2012-11-17 Multi-Stage Fracture 2261.70 2261.80 0
2012-11-17 Multi-Stage Fracture 2183.90 2184.00 0
2012-11-17 Multi-Stage Fracture 2094.20 2094.30 0
2012-11-17 Multi-Stage Fracture 2016.10 2016.20 0
2012-11-17 Multi-Stage Fracture 1924.80 1924.90 0
2012-11-16 Multi-Stage Fracture 3138.60 3138.70 0
2012-11-16 Multi-Stage Fracture 3046.50 3046.60 0
2012-11-16 Multi-Stage Fracture 2968.60 2968.70 0
2012-11-16 Multi-Stage Fracture 2876.40 2876.50 0
2012-11-16 Multi-Stage Fracture 2786.00 2786.10 0
2012-11-16 Multi-Stage Fracture 2693.40 2693.50 0
2012-11-16 Multi-Stage Fracture 2603.40 2603.50 0
2012-11-16 Multi-Stage Fracture 2525.10 2525.20 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 0 0.0 0.0 0.0
2013 7431 0.0 0.0 0.0
2014 8341 0.0 0.0 0.0
2015 6881 0.0 0.0 0.0
2016 8511 0.0 0.0 0.0
2017 7413 0.0 0.0 0.0
2018 8602 0.0 0.0 0.0
2019 8737 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-09-12 No Incident Encountered 0.00 0.00
2012-11-27 No Incident Encountered 0.00 0.00

For data sources see[8]

References