If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0455060108020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.850155,"lon":-114.749452,"icon":""}]} |
Location: 02/08-01-045-06W5/0 | |
Location Alias: 02/08-01-45-06 W5M | |
Location Alias 2: 02/08-01-045-06 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 045 | |
Meridian: 5 | |
Range: 06 | |
Section: 01 | |
County/Municipality: County of Wetaskiwin No. 10 | |
Well Name: TAC 102 HZ PEMBINA 8-1-45-6 | |
Operator Name: Tamarack Acquisition Corp. | |
License Number: 0447303 | |
License Date: 2012-07-20 | |
License Status: Issued | |
Spud Date: 2012-09-04 | |
Final Drill Date: 2012-09-11 | |
Well Total Depth: 3170.00 m | |
Surface Hole Latitude: 52.850155 | |
Surface Hole Longitude: -114.749452 |
Date | Event |
---|---|
2012-07-20 | Obtained License |
2012-09-05 | Surface Casing Operation Performed |
2012-09-06 | Direction Drilling Operation Performed - Deviate |
2012-09-06 | Well Log Performed |
2012-09-08 | Direction Drilling Operation Performed - Horizontal |
2012-09-11 | Finished Drilling |
2012-09-11 | Perforation Treatment Performed - Open-Hole Completion |
2012-09-11 | Production Casing Operation Performed |
2012-09-11 | Well Log Performed |
2012-09-11 | Well Mode changed to Drilled and Cased |
2012-09-13 | Rig Released |
2012-10-24 | Well Log Performed |
2012-11-01 | Well Fluid changed to Crude Oil |
2012-11-01 | Well Mode changed to Drilling and Completing |
2012-11-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-11-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-01-01 | Well Began Production |
2013-01-01 | Well Fluid changed to Crude Oil |
2013-01-01 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-09-04 | Nabors Drilling Limited | C0015 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-09-06 | 784.20 | Deviate (5 - 79 degrees) |
2012-09-08 | 1844.50 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-09-11 | Open Hole/Barefoot Completion | 3157.80 | 3170.00 | 0 |
2012-11-17 | Multi-Stage Fracture | 2433.30 | 2433.40 | 0 |
2012-11-17 | Multi-Stage Fracture | 2353.60 | 2353.70 | 0 |
2012-11-17 | Multi-Stage Fracture | 2261.70 | 2261.80 | 0 |
2012-11-17 | Multi-Stage Fracture | 2183.90 | 2184.00 | 0 |
2012-11-17 | Multi-Stage Fracture | 2094.20 | 2094.30 | 0 |
2012-11-17 | Multi-Stage Fracture | 2016.10 | 2016.20 | 0 |
2012-11-17 | Multi-Stage Fracture | 1924.80 | 1924.90 | 0 |
2012-11-16 | Multi-Stage Fracture | 3138.60 | 3138.70 | 0 |
2012-11-16 | Multi-Stage Fracture | 3046.50 | 3046.60 | 0 |
2012-11-16 | Multi-Stage Fracture | 2968.60 | 2968.70 | 0 |
2012-11-16 | Multi-Stage Fracture | 2876.40 | 2876.50 | 0 |
2012-11-16 | Multi-Stage Fracture | 2786.00 | 2786.10 | 0 |
2012-11-16 | Multi-Stage Fracture | 2693.40 | 2693.50 | 0 |
2012-11-16 | Multi-Stage Fracture | 2603.40 | 2603.50 | 0 |
2012-11-16 | Multi-Stage Fracture | 2525.10 | 2525.20 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 0 | 0.0 | 0.0 | 0.0 |
2013 | 7431 | 0.0 | 0.0 | 0.0 |
2014 | 8341 | 0.0 | 0.0 | 0.0 |
2015 | 6881 | 0.0 | 0.0 | 0.0 |
2016 | 8511 | 0.0 | 0.0 | 0.0 |
2017 | 7413 | 0.0 | 0.0 | 0.0 |
2018 | 8602 | 0.0 | 0.0 | 0.0 |
2019 | 8737 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-09-12 | No Incident Encountered | 0.00 | 0.00 |
2012-11-27 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]