X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455051901000

Well Details

Well ID: 0455051901000
Loading map...
Location: 00/01-19-045-05W5/0
Location Alias: 00/01-19-45-05 W5M
Location Alias 2: 00/01-19-045-05 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 05
Section: 19
County/Municipality: County of Wetaskiwin No. 10
Well Name: TAC PEMBINA 1-19-45-5
Operator Name: Tamarack Acquisition Corp.
License Number: 0430401
License Date: 2011-01-21
License Status: Issued
Spud Date: 2011-06-22
Final Drill Date: 2011-06-30
Well Total Depth: 3154.00 m
Surface Hole Latitude: 52.890000
Surface Hole Longitude: -114.731180

For data sources see[1][2]

Well History

Date Event
2011-01-21 Obtained License
2011-06-23 Surface Casing Operation Performed
2011-06-24 Well Log Performed
2011-06-25 Direction Drilling Operation Performed - Horizontal
2011-06-30 Finished Drilling
2011-06-30 Well Mode changed to Drilled and Cased
2011-07-02 Production Casing Operation Performed
2011-07-02 Rig Released
2011-08-10 Well Log Performed
2011-08-23 Perforation Treatment Performed - Multi-Stage Fracture
2011-08-23 Perforation Treatment Performed - Open-Hole Completion
2011-08-25 Well Log Performed
2011-10-13 Well Began Production
2011-10-13 Well Fluid changed to Crude Oil
2011-10-13 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-06-25 1462.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-08-23 Open Hole/Barefoot Completion 3153.80 3154.00 0
2011-08-23 Multi-Stage Fracture 2466.10 2466.20 0
2011-08-23 Multi-Stage Fracture 2393.80 2393.90 0
2011-08-23 Multi-Stage Fracture 2309.00 2309.10 0
2011-08-23 Multi-Stage Fracture 2211.00 2211.10 0
2011-08-23 Multi-Stage Fracture 2152.00 2152.10 0
2011-08-23 Multi-Stage Fracture 2066.90 2067.00 0
2011-08-23 Multi-Stage Fracture 1981.70 1981.80 0
2011-08-23 Multi-Stage Fracture 1923.30 1923.40 0
2011-08-23 Multi-Stage Fracture 1799.30 1799.40 0
2011-08-23 Multi-Stage Fracture 3107.00 3107.10 0
2011-08-23 Multi-Stage Fracture 3035.20 3035.30 0
2011-08-23 Multi-Stage Fracture 2963.40 2963.50 0
2011-08-23 Multi-Stage Fracture 2891.80 2891.90 0
2011-08-23 Multi-Stage Fracture 2781.10 2781.20 0
2011-08-23 Multi-Stage Fracture 2695.90 2696.00 0
2011-08-23 Multi-Stage Fracture 2636.90 2637.00 0
2011-08-23 Multi-Stage Fracture 2564.30 2564.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1893 0.0 0.0 0.0
2012 8342 0.0 0.0 0.0
2013 8379 0.0 0.0 0.0
2014 8325 0.0 0.0 0.0
2015 8399 0.0 0.0 0.0
2016 8501 0.0 0.0 0.0
2017 8516 0.0 0.0 0.0
2018 8626 0.0 0.0 0.0
2019 8425 0.0 0.0 0.0
2020 2151 0.0 0.0 0.0

For data sources see[6]

References