X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455051814020

Well Details

Well ID: 0455051814020
Loading map...
Location: 02/14-18-045-05W5/0
Location Alias: 02/14-18-45-05 W5M
Location Alias 2: 02/14-18-045-05 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 05
Section: 18
County/Municipality: County of Wetaskiwin No. 10
Well Name: TAC PEMBINA 14-18-45-5
Operator Name: Tamarack Acquisition Corp.
License Number: 0427811
License Date: 2010-12-15
License Status: Issued
Spud Date: 2011-06-23
Final Drill Date: 2011-07-03
Well Total Depth: 3004.00 m
Surface Hole Latitude: 52.874649
Surface Hole Longitude: -114.722312

For data sources see[1][2]

Well History

Date Event
2010-12-15 Obtained License
2011-06-25 Surface Casing Operation Performed
2011-06-25 Well Log Performed
2011-06-26 Direction Drilling Operation Performed - Horizontal
2011-07-03 Finished Drilling
2011-07-03 Well Mode changed to Drilled and Cased
2011-07-05 Well Log Performed
2011-07-06 Perforation Treatment Performed - Jet Perforation
2011-07-06 Perforation Treatment Performed - Remedial Casing
2011-07-06 Production Casing Operation Performed
2011-07-06 Rig Released
2011-07-06 Well Log Performed
2011-07-31 Well Log Performed
2011-08-10 Perforation Treatment Performed - Multi-Stage Fracture
2011-08-10 Perforation Treatment Performed - Open-Hole Completion
2011-08-31 Well Log Performed
2011-10-05 Well Began Production
2011-10-05 Well Fluid changed to Crude Oil
2011-10-05 Well Mode changed to Pumping
2016-09-12 Well Fluid changed to Crude Oil
2016-09-12 Well Mode changed to Suspended
2019-05-01 Well Fluid changed to Crude Oil
2019-05-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-06-26 1304.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-07-06 Perforation 1375.00 1376.00 14
2011-08-10 Multi-Stage Fracture 2562.30 2562.50 0
2011-08-10 Multi-Stage Fracture 2477.20 2477.40 0
2011-08-10 Multi-Stage Fracture 2430.60 2430.80 0
2011-08-10 Multi-Stage Fracture 2346.00 2346.20 0
2011-08-10 Multi-Stage Fracture 2273.80 2274.00 0
2011-08-10 Multi-Stage Fracture 2202.20 2202.40 0
2011-08-10 Multi-Stage Fracture 2142.80 2143.00 0
2011-08-10 Multi-Stage Fracture 2058.50 2058.70 0
2011-08-10 Multi-Stage Fracture 1999.20 1999.40 0
2011-08-10 Multi-Stage Fracture 1926.80 1927.00 0
2011-07-06 Remedial Casing Cementing 1375.00 1376.00 0
2011-08-10 Multi-Stage Fracture 1841.60 1841.80 0
2011-08-10 Open Hole/Barefoot Completion 3003.00 3004.00 0
2011-08-10 Multi-Stage Fracture 2969.00 2969.20 0
2011-08-10 Multi-Stage Fracture 2896.70 2896.90 0
2011-08-10 Multi-Stage Fracture 2824.60 2824.80 0
2011-08-10 Multi-Stage Fracture 2753.40 2753.60 0
2011-08-10 Multi-Stage Fracture 2681.10 2681.30 0
2011-08-10 Multi-Stage Fracture 2621.60 2621.80 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1900 0.0 0.0 0.0
2012 7709 0.0 0.0 0.0
2013 8110 0.0 0.0 0.0
2014 7478 0.0 0.0 0.0
2015 913 0.0 0.0 0.0
2019 5808 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References