X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455051015000

Well Details

Well ID: 0455051015000
Loading map...
Location: 00/15-10-045-05W5/0
Location Alias: 00/15-10-45-05 W5M
Location Alias 2: 00/15-10-045-05 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 05
Section: 10
County/Municipality: County of Wetaskiwin No. 10
Well Name: TAC PEMBINA 15-10-45-5
Operator Name: Tamarack Acquisition Corp.
License Number: 0431047
License Date: 2011-02-02
License Status: Issued
Spud Date: 2011-06-13
Final Drill Date: 2011-06-24
Well Total Depth: 3129.50 m
Surface Hole Latitude: 52.857836
Surface Hole Longitude: -114.639008

For data sources see[1][2]

Well History

Date Event
2011-02-02 Obtained License
2011-06-15 Surface Casing Operation Performed
2011-06-16 Well Log Performed
2011-06-17 Direction Drilling Operation Performed - Horizontal
2011-06-24 Finished Drilling
2011-06-24 Well Mode changed to Drilled and Cased
2011-06-28 Production Casing Operation Performed
2011-06-29 Rig Released
2011-08-27 Perforation Treatment Performed - Multi-Stage Fracture
2011-08-27 Perforation Treatment Performed - Open-Hole Completion
2011-08-28 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-27 Well Began Production
2011-10-27 Well Fluid changed to Crude Oil
2011-10-27 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-06-17 1315.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-08-27 Open Hole/Barefoot Completion 3128.70 3129.50 0
2011-08-27 Multi-Stage Fracture 2475.50 2475.70 0
2011-08-28 Multi-Stage Fracture 2390.30 2390.50 0
2011-08-28 Multi-Stage Fracture 2330.90 2331.10 0
2011-08-28 Multi-Stage Fracture 2272.50 2272.70 0
2011-08-28 Multi-Stage Fracture 2200.40 2200.60 0
2011-08-28 Multi-Stage Fracture 2102.30 2102.50 0
2011-08-28 Multi-Stage Fracture 2043.10 2043.30 0
2011-08-28 Multi-Stage Fracture 1970.90 1971.10 0
2011-08-28 Multi-Stage Fracture 1873.60 1873.80 0
2011-08-27 Multi-Stage Fracture 3094.90 3095.10 0
2011-08-27 Multi-Stage Fracture 3009.90 3010.10 0
2011-08-27 Multi-Stage Fracture 2937.00 2937.20 0
2011-08-27 Multi-Stage Fracture 2862.80 2863.00 0
2011-08-27 Multi-Stage Fracture 2801.30 2801.50 0
2011-08-27 Multi-Stage Fracture 2716.40 2716.60 0
2011-08-27 Multi-Stage Fracture 2603.70 2603.90 0
2011-08-27 Multi-Stage Fracture 2546.10 2546.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1512 0.0 0.0 0.0
2012 8367 0.0 0.0 0.0
2013 7873 0.0 0.0 0.0
2014 8411 0.0 0.0 0.0
2015 8144 0.0 0.0 0.0
2016 8306 0.0 0.0 0.0
2017 3264 0.0 0.0 0.0
2019 5472 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References