X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455050703000

Well Details

Well ID: 0455050703000
Loading map...
Location: 00/03-07-045-05W5/0
Location Alias: 00/03-07-45-05 W5M
Location Alias 2: 00/03-07-045-05 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 05
Section: 07
County/Municipality: County of Wetaskiwin No. 10
Well Name: TAC PEMBINA 3-7-45-5
Operator Name: Tamarack Acquisition Corp.
License Number: 0425280
License Date: 2010-10-28
License Status: Issued
Spud Date: 2011-01-18
Final Drill Date: 2011-02-01
Well Total Depth: 3106.00 m
Surface Hole Latitude: 52.874379
Surface Hole Longitude: -114.722312

For data sources see[1][2]

Well History

Date Event
2010-10-28 Obtained License
2011-01-21 Surface Casing Operation Performed
2011-01-24 Direction Drilling Operation Performed - Horizontal
2011-01-24 Well Log Performed
2011-02-01 Finished Drilling
2011-02-01 Well Log Performed
2011-02-01 Well Mode changed to Drilled and Cased
2011-02-04 Production Casing Operation Performed
2011-02-04 Rig Released
2011-02-16 Perforation Treatment Performed - Multi-Stage Fracture
2011-02-16 Perforation Treatment Performed - Open-Hole Completion
2011-04-05 Well Began Production
2011-04-05 Well Fluid changed to Crude Oil
2011-04-05 Well Mode changed to Flowing
2015-01-05 Well Fluid changed to Crude Oil
2015-01-05 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-01-24 1326.60 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-02-16 Open Hole/Barefoot Completion 3104.60 3106.00 0
2011-02-16 Multi-Stage Fracture 2525.50 2525.60 0
2011-02-16 Multi-Stage Fracture 2477.50 2477.60 0
2011-02-16 Multi-Stage Fracture 2432.10 2432.20 0
2011-02-16 Multi-Stage Fracture 2360.70 2360.80 0
2011-02-16 Multi-Stage Fracture 2302.50 2302.60 0
2011-02-16 Multi-Stage Fracture 2244.00 2244.10 0
2011-02-16 Multi-Stage Fracture 2184.80 2184.90 0
2011-02-16 Multi-Stage Fracture 2125.00 2125.10 0
2011-02-16 Multi-Stage Fracture 2077.30 2077.40 0
2011-02-16 Multi-Stage Fracture 2017.20 2017.30 0
2011-02-16 Multi-Stage Fracture 3031.00 3031.10 0
2011-02-16 Multi-Stage Fracture 1955.90 1956.00 0
2011-02-16 Multi-Stage Fracture 1868.10 1868.20 0
2011-02-16 Multi-Stage Fracture 3007.60 3007.70 0
2011-02-16 Multi-Stage Fracture 2959.80 2959.90 0
2011-02-16 Multi-Stage Fracture 2912.70 2912.80 0
2011-02-16 Multi-Stage Fracture 2864.70 2864.80 0
2011-02-16 Multi-Stage Fracture 2705.40 2705.50 0
2011-02-16 Multi-Stage Fracture 2646.50 2646.60 0
2011-02-16 Multi-Stage Fracture 2586.60 2586.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 5709 0.0 0.0 0.0
2012 8455 0.0 0.0 0.0
2013 7499 0.0 0.0 0.0
2014 8384 0.0 0.0 0.0
2015 8387 0.0 0.0 0.0
2016 8156 0.0 0.0 0.0
2017 8337 0.0 0.0 0.0
2018 8526 0.0 0.0 0.0
2019 8704 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References