X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455050503000

Well Details

Well ID: 0455050503000
Loading map...
Location: 00/03-05-045-05W5/0
Location Alias: 00/03-05-45-05 W5M
Location Alias 2: 00/03-05-045-05 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 05
Section: 05
County/Municipality: County of Wetaskiwin No. 10
Well Name: TAC HZ PEMBINA 3-5-45-5
Operator Name: Tamarack Acquisition Corp.
License Number: 0437282
License Date: 2011-09-29
License Status: Issued
Spud Date: 2012-01-25
Final Drill Date: 2012-02-01
Well Total Depth: 3108.00 m
Surface Hole Latitude: 52.856480
Surface Hole Longitude: -114.698967

For data sources see[1][2]

Well History

Date Event
2011-09-29 Obtained License
2012-01-26 Surface Casing Operation Performed
2012-01-27 Well Log Performed
2012-01-28 Direction Drilling Operation Performed - Horizontal
2012-02-01 Finished Drilling
2012-02-01 Production Casing Operation Performed
2012-02-01 Well Log Performed
2012-02-01 Well Mode changed to Drilled and Cased
2012-02-03 Rig Released
2012-03-03 Well Log Performed
2012-03-16 Well Log Performed
2013-03-01 Well Fluid changed to Crude Oil
2013-03-01 Well Mode changed to Drilling and Completing
2013-03-10 Perforation Treatment Performed - Multi-Stage Fracture
2013-03-12 Perforation Treatment Performed - Multi-Stage Fracture
2013-04-01 Well Began Production
2013-04-01 Well Fluid changed to Crude Oil
2013-04-01 Well Mode changed to Flowing
2015-10-01 Well Fluid changed to Crude Oil
2015-10-01 Well Mode changed to Suspended
2019-05-16 Well Fluid changed to Crude Oil
2019-05-16 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-01-25 Nabors Drilling Limited 15 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-01-28 840.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-03-10 Multi-Stage Fracture 3075.70 3075.80 0
2013-03-12 Multi-Stage Fracture 2580.30 2580.40 0
2013-03-12 Multi-Stage Fracture 2504.60 2504.70 0
2013-03-12 Multi-Stage Fracture 2440.00 2440.10 0
2013-03-12 Multi-Stage Fracture 2364.10 2364.20 0
2013-03-12 Multi-Stage Fracture 2288.10 2288.20 0
2013-03-12 Multi-Stage Fracture 2223.20 2223.30 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-03-10 2013-03-12 1,691 1,859 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 nitrogen 7727-37-9 100 29.0317 N/A
water Not Available 100 0.6333 N/A
Frac Sand - regular Trican silica crystalline 14808-60-7 100 22.7051 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0584 N/A
dibromoacetonitrile 3252-43-5 100 0.0584 N/A
non-hazardous ingredients Not Available 100 0.0584 N/A
polyethylene glycol 25322-68-3 100 0.0584 N/A
sodium bromide 7647-15-6 100 0.0584 N/A
GBO-1 Trican Breaker sodium perborate tetrahydrate 10486-00-7 100 0.1403 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 1.0058 N/A
water Not Available 100 1.0058 N/A
GNE-1 Trican Demulsifier non-hazardous ingredients Not Available 100 0.5144 N/A
propylene glycol 57-55-6 100 0.5144 N/A
FR-8 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.5004 N/A
non-hazardous ingredients Not Available 100 0.5004 N/A
petroleum distillate. light hydrotreated 64742-47-8 100 0.5004 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-03-06 2013-03-11 Surface Water - Runoff 1227
2013-03-06 2013-03-09 Waste Water - Industrial (Non-oilfield) 190

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 5919 0.0 0.0 0.0
2014 7892 0.0 0.0 0.0
2015 3785 0.0 0.0 0.0
2019 5455 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-03-20 No Incident Encountered 0.00 0.00

For data sources see[10]

References