X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455050409000

Well Details

Well ID: 0455050409000
Loading map...
Location: 00/09-04-045-05W5/0
Location Alias: 00/09-04-45-05 W5M
Location Alias 2: 00/09-04-045-05 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 05
Section: 04
County/Municipality: County of Wetaskiwin No. 10
Well Name: TAC PEMBINA 9-4-45-5
Operator Name: Tamarack Acquisition Corp.
License Number: 0438739
License Date: 2011-11-14
License Status: Issued
Spud Date: 2011-12-08
Final Drill Date: 2011-12-16
Well Total Depth: 3124.00 m
Surface Hole Latitude: 52.855998
Surface Hole Longitude: -114.679878

For data sources see[1][2]

Well History

Date Event
2011-11-14 Obtained License
2011-12-08 Lost Circulation Occurred
2011-12-10 Surface Casing Operation Performed
2011-12-12 Direction Drilling Operation Performed - Horizontal
2011-12-13 Well Log Performed
2011-12-16 Finished Drilling
2011-12-16 Well Log Performed
2011-12-16 Well Mode changed to Drilled and Cased
2011-12-17 Production Casing Operation Performed
2011-12-18 Rig Released
2012-01-15 Well Log Performed
2012-01-30 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-30 Perforation Treatment Performed - Open-Hole Completion
2012-01-31 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-01 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-05 Well Began Production
2012-02-05 Well Fluid changed to Crude Oil
2012-02-05 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-12-12 1362.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-01-30 Open Hole/Barefoot Completion 3113.40 3124.00 0
2012-01-31 Multi-Stage Fracture 2427.50 2427.60 0
2012-01-31 Multi-Stage Fracture 2355.40 2355.50 0
2012-01-31 Multi-Stage Fracture 2283.40 2283.50 0
2012-01-31 Multi-Stage Fracture 2211.50 2211.60 0
2012-01-31 Multi-Stage Fracture 2140.20 2140.30 0
2012-01-31 Multi-Stage Fracture 2068.60 2068.70 0
2012-02-01 Multi-Stage Fracture 1996.70 1996.80 0
2012-02-01 Multi-Stage Fracture 1825.20 1825.30 0
2012-01-30 Multi-Stage Fracture 3079.70 3079.80 0
2012-01-30 Multi-Stage Fracture 3007.70 3007.80 0
2012-01-30 Multi-Stage Fracture 2922.20 2922.30 0
2012-01-30 Multi-Stage Fracture 2863.70 2863.80 0
2012-01-30 Multi-Stage Fracture 2778.30 2778.40 0
2012-01-30 Multi-Stage Fracture 2706.30 2706.40 0
2012-01-30 Multi-Stage Fracture 2647.60 2647.70 0
2012-01-30 Multi-Stage Fracture 2571.30 2571.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 7432 0.0 0.0 0.0
2013 8087 0.0 0.0 0.0
2014 8427 0.0 0.0 0.0
2015 8060 0.0 0.0 0.0
2016 8747 0.0 0.0 0.0
2017 8495 0.0 0.0 0.0
2018 8347 0.0 0.0 0.0
2019 8445 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2011-12-08 Lost Circulation 55.00 601.00

For data sources see[7]

References