X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455050302000

Well Details

Well ID: 0455050302000
Loading map...
Location: 00/02-03-045-05W5/0
Location Alias: 00/02-03-45-05 W5M
Location Alias 2: 00/02-03-045-05 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 05
Section: 03
County/Municipality: County of Wetaskiwin No. 10
Well Name: TAC PEMBINA 2-3-45-5
Operator Name: Tamarack Acquisition Corp.
License Number: 0431048
License Date: 2011-02-02
License Status: Issued
Spud Date: 2011-02-25
Final Drill Date: 2011-03-07
Well Total Depth: 2866.00 m
Surface Hole Latitude: 52.857567
Surface Hole Longitude: -114.639008

For data sources see[1][2]

Well History

Date Event
2011-02-02 Obtained License
2011-02-25 Lost Circulation Occurred
2011-02-27 Surface Casing Operation Performed
2011-03-01 Well Log Performed
2011-03-02 Direction Drilling Operation Performed - Horizontal
2011-03-07 Finished Drilling
2011-03-07 Well Mode changed to Drilled and Cased
2011-03-09 Production Casing Operation Performed
2011-03-09 Rig Released
2011-08-16 Well Log Performed
2011-08-21 Perforation Treatment Performed - Multi-Stage Fracture
2011-08-21 Perforation Treatment Performed - Open-Hole Completion
2011-08-22 Perforation Treatment Performed - Multi-Stage Fracture
2011-08-25 Well Log Performed
2011-10-27 Well Began Production
2011-10-27 Well Fluid changed to Crude Oil
2011-10-27 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-03-02 1334.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-08-21 Open Hole/Barefoot Completion 2864.80 2866.00 0
2011-08-21 Multi-Stage Fracture 2325.40 2325.60 0
2011-08-22 Multi-Stage Fracture 2264.60 2264.80 0
2011-08-22 Multi-Stage Fracture 2203.20 2203.40 0
2011-08-22 Multi-Stage Fracture 2141.90 2142.10 0
2011-08-22 Multi-Stage Fracture 2080.60 2080.80 0
2011-08-22 Multi-Stage Fracture 2019.30 2019.50 0
2011-08-22 Multi-Stage Fracture 1958.10 1958.30 0
2011-08-22 Multi-Stage Fracture 1896.70 1896.90 0
2011-08-22 Multi-Stage Fracture 1835.60 1835.80 0
2011-08-21 Multi-Stage Fracture 2816.30 2816.50 0
2011-08-21 Multi-Stage Fracture 2741.70 2741.90 0
2011-08-21 Multi-Stage Fracture 2680.40 2680.60 0
2011-08-21 Multi-Stage Fracture 2619.00 2619.20 0
2011-08-21 Multi-Stage Fracture 2557.60 2557.80 0
2011-08-21 Multi-Stage Fracture 2496.20 2496.40 0
2011-08-21 Multi-Stage Fracture 2448.30 2448.50 0
2011-08-21 Multi-Stage Fracture 2386.90 2387.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1536 0.0 0.0 0.0
2012 8387 0.0 0.0 0.0
2013 8155 0.0 0.0 0.0
2014 8392 0.0 0.0 0.0
2015 8256 0.0 0.0 0.0
2016 8506 0.0 0.0 0.0
2017 8545 0.0 0.0 0.0
2018 8722 0.0 0.0 0.0
2019 8692 0.0 0.0 0.0
2020 2135 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2011-02-25 Lost Circulation 55.00 59.00

For data sources see[7]

References